• Title/Summary/Keyword: Orbit Insertion Maneuver

Search Result 15, Processing Time 0.023 seconds

A Study on the Station Relocation of the Koreasat (무궁화위성의 궤도재배치에 관한 연구)

  • Lee, Sang-Cherl;Park, Bong-Kyu;Kim, Bang-Yeop
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.8
    • /
    • pp.87-93
    • /
    • 2002
  • In general, station relocation for a geostationary orbit satellite is formulated as a request for moving the spacecraft from its present longitude to the target longitude within a given time interval. The station relocation maneuver is composed of drift orbit insertion maneuver and target orbit insertion maneuver. During station relocation, the satellite orbit is continually influenced by the non-spherical geo-potential. When we plan a maneuver, if we do not consider the influence, the satellite may not be relocate to desired longitude successfully. To solve this problem, we applied the linearised orbit transfer equation to acquire maneuver time and delta-V. Nonlinear simulation for the station relocation of multiple satellites is performed in order to verify the distance between two satellites.

Uncertainty Requirement Analysis for the Orbit, Attitude, and Burn Performance of the 1st Lunar Orbit Insertion Maneuver

  • Song, Young-Joo;Bae, Jonghee;Kim, Young-Rok;Kim, Bang-Yeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.33 no.4
    • /
    • pp.323-333
    • /
    • 2016
  • In this study, the uncertainty requirements for orbit, attitude, and burn performance were estimated and analyzed for the execution of the $1^{st}$ lunar orbit insertion (LOI) maneuver of the Korea Pathfinder Lunar Orbiter (KPLO) mission. During the early design phase of the system, associate analysis is an essential design factor as the $1^{st}$ LOI maneuver is the largest burn that utilizes the onboard propulsion system; the success of the lunar capture is directly affected by the performance achieved. For the analysis, the spacecraft is assumed to have already approached the periselene with a hyperbolic arrival trajectory around the moon. In addition, diverse arrival conditions and mission constraints were considered, such as varying periselene approach velocity, altitude, and orbital period of the capture orbit after execution of the $1^{st}$ LOI maneuver. The current analysis assumed an impulsive LOI maneuver, and two-body equations of motion were adapted to simplify the problem for a preliminary analysis. Monte Carlo simulations were performed for the statistical analysis to analyze diverse uncertainties that might arise at the moment when the maneuver is executed. As a result, three major requirements were analyzed and estimated for the early design phase. First, the minimum requirements were estimated for the burn performance to be captured around the moon. Second, the requirements for orbit, attitude, and maneuver burn performances were simultaneously estimated and analyzed to maintain the $1^{st}$ elliptical orbit achieved around the moon within the specified orbital period. Finally, the dispersion requirements on the B-plane aiming at target points to meet the target insertion goal were analyzed and can be utilized as reference target guidelines for a mid-course correction (MCC) maneuver during the transfer. More detailed system requirements for the KPLO mission, particularly for the spacecraft bus itself and for the flight dynamics subsystem at the ground control center, are expected to be prepared and established based on the current results, including a contingency trajectory design plan.

Burn Delay Analysis of the Lunar Orbit Insertion for Korea Pathfinder Lunar Orbiter

  • Bae, Jonghee;Song, Young-Joo;Kim, Young-Rok;Kim, Bangyeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.4
    • /
    • pp.281-288
    • /
    • 2017
  • The first Korea lunar orbiter, Korea Pathfinder Lunar Orbiter (KPLO), has been in development since 2016. After launch, the KPLO will execute several maneuvers to enter into the lunar mission orbit, and will then perform lunar science missions for one year. Among these maneuvers, the lunar orbit insertion (LOI) is the most critical maneuver because the KPLO will experience an extreme velocity change in the presence of the Moon's gravitational pull. However, the lunar orbiter may have a delayed LOI burn during operation due to hardware limitations and telemetry delays. This delayed burn could occur in different captured lunar orbits; in the worst case, the KPLO could fly away from the Moon. Therefore, in this study, the burn delay for the first LOI maneuver is analyzed to successfully enter the desired lunar orbit. Numerical simulations are performed to evaluate the difference between the desired and delayed lunar orbits due to a burn delay in the LOI maneuver. Based on this analysis, critical factors in the LOI maneuver, the periselene altitude and orbit period, are significantly changed and an additional delta-V in the second LOI maneuver is required as the delay burn interval increases to 10 min from the planned maneuver epoch.

Comparison of Global Optimization Methods for Insertion Maneuver into Earth-Moon L2 Quasi-Halo Orbit Considering Collision Avoidance

  • Lee, Sang-Cherl;Kim, Hae-Dong;Yang, Do-Chul;Cho, Dong-Hyun;Im, Jeong-Heum;No, Tae-Soo;Kim, Seungkeun;Suk, Jinyoung
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.15 no.3
    • /
    • pp.267-280
    • /
    • 2014
  • A spacecraft placed in an Earth-Moon L2 quasi-halo orbit can maintain constant communication between the Earth and the far side of the Moon. This quasi-halo orbit could be used to establish a lunar space station and serve as a gateway to explore the solar system. For a mission in an Earth-Moon L2 quasi-halo orbit, a spacecraft would have to be transferred from the Earth to the vicinity of the Earth-Moon L2 point, then inserted into the Earth-Moon L2 quasi-halo orbit. Unlike the near Earth case, this orbit is essentially very unstable due to mutually perturbing gravitational attractions by the Earth, the Moon and the Sun. In this paper, an insertion maneuver of a spacecraft into an Earth-Moon L2 quasi-halo orbit was investigated using the global optimization algorithm, including simulated annealing, genetic algorithm and pattern search method with collision avoidance taken into consideration. The result shows that the spacecraft can maintain its own position in the Earth-Moon L2 quasi-halo orbit and avoid collisions with threatening objects.

Early Phase Contingency Trajectory Design for the Failure of the First Lunar Orbit Insertion Maneuver: Direct Recovery Options

  • Song, Young-Joo;Bae, Jonghee;Kim, Young-Rok;Kim, Bang-Yeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.4
    • /
    • pp.331-342
    • /
    • 2017
  • To ensure the successful launch of the Korea pathfinder lunar orbiter (KPLO) mission, the Korea Aerospace Research Institute (KARI) is now performing extensive trajectory design and analysis studies. From the trajectory design perspective, it is crucial to prepare contingency trajectory options for the failure of the first lunar brake or the failure of the first lunar orbit insertion (LOI) maneuver. As part of the early phase trajectory design and analysis activities, the required time of flight (TOF) and associated delta-V magnitudes for each recovery maneuver (RM) to recover the KPLO mission trajectory are analyzed. There are two typical trajectory recovery options, direct recovery and low energy recovery. The current work is focused on the direct recovery option. Results indicate that a quicker execution of the first RM after the failure of the first LOI plays a significant role in saving the magnitudes of the RMs. Under the conditions of the extremely tight delta-V budget that is currently allocated for the KPLO mission, it is found that the recovery of the KPLO without altering the originally planned mission orbit (a 100 km circular orbit) cannot be achieved via direct recovery options. However, feasible recovery options are suggested within the boundaries of the currently planned delta-V budget. By changing the shape and orientation of the recovered final mission orbit, it is expected that the KPLO mission may partially pursue its scientific mission after successful recovery, though it will be limited.

A Study on Lunar Orbit Insertion Maneuver using Finite Burn Model (유한 분사 모델을 이용한 달 궤도 진입 기동 연구)

  • Choi, Sujin;Bae, Jonghee;Kim, Eunhyeuk
    • Aerospace Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.96-107
    • /
    • 2014
  • Korea Aerospace Research Institute has a plan to launch experimental lunar orbiter in 2017, and lunar orbiter and lander in 2020. In the mission planning phase, LOI(Lunar Orbit Insertion) maneuver strategy should be designed using finite burn model because on-board propulsion system of lunar orbiter in finite burn type. LOI maneuver plan and amount of required ${\Delta}V$ using finite burn model depend on the spacecraft attitude at burn, a type of propellant, thrust level and burn timing. This paper describes the LOI maneuver of lunar orbiter of foreign space agency and then comes up with the LOI maneuver plan of Korean lunar orbiter. Adequate thrust level and burn duration of Korean lunar orbiter also present by performing simulation.

A Study on Variation of Orbital Elements according to Variation of Target Value of Lunar Orbit Insertion (달 궤도 진입 목표값 변화에 따른 궤도요소 변화 연구)

  • Choi, Su-Jin;Kim, In-Kyu;Moon, Sang-Man;Min, SeungYong;Rew, Dong-Young
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.4
    • /
    • pp.16-22
    • /
    • 2015
  • Korea Aerospace Research Institute(here after KARI) has a plan to launch experimental lunar orbiter in 2018, and lunar orbiter and lander in 2020. There are several ways to go to the moon. Which one is direct transfer trajectory and another one is phasing loop transfer trajectory and the other one is WSB trajectory. Regardless of the transfer trajectories, LOI maneuver is the most important maneuver of all mission sequences because if this burn is failed, it is too difficult to get into the lunar orbit in the future. This paper describes first LOI target value of foreign lunar orbiters and analyzes orbital variations of experimental lunar orbiter according to various target values. By analyzing the variation of orbiter parameter after first LOI, proper orbital period for LOI target value are recommended to meet the inclination, apoapsis and periapsis altitude constraints.

KOREAN MARS MISSION DESIGN USING KSLV-III (KSLV-III를 이용한 한국형 화성 탐사 임무의 설계)

  • Song, Young-Joo;Yoo, Sung-Moon;Park, Eun-Seo;Park, Sang-Young;Choi, Kyu-Hong;Yoon, Jae-Cheol;Yim, Jo-Ryeong;Choi, Joon-Min;Kim, Byung-Kyo
    • Journal of Astronomy and Space Sciences
    • /
    • v.23 no.4
    • /
    • pp.355-372
    • /
    • 2006
  • Mission opportunities and trajectory characteristics for the future Korean Mars mission have designed and analyzed using KSIV-III(Korea Space Launch Vehicle-III). Korea's first space center, 'NARO space center' is selected as a launch site. For launch opportunities, year 2033 is investigated under considering the date of space center's completion with KSLV series development status. Optimal magnitude of various maneuvers, Trans Mars Injection (TMI) maneuver, Trajectory Correction Maneuver (TCM), Mars Orbit Insertion (MOI) maneuver and Orbit Trim Maneuver(OTM), which are required during the every Mars mission phases are computed with the formulation of nonlinear optimization problems using NPSOL software. Finally, mass budgets for upper stage (launcher for KSIV-III and spacecraft are derived using various optimized maneuver magnitudes. For results, daily launch window from NARO space center for successful Korean Mars mission is avaliable for next 27 minutes starting from Apr. 16. 2033. 12:17:26 (UTC). Maximum spacecraft gross mass which can delivered to Mars is about 206kg, with propellant mass of 109kg and structure mass of 97kg, when on board spacecraft thruster's Isp is assumed to have 290 sec. For upper stage, having structure ratio of 0.15 and Isp value of 280 sec, gross mass is about 1293kg with propellant mass of 1099kg and structure mass of 194kg. However, including 10% margins to computed optimal maneuver values, spacecraft gross mass is reduced to about 148kg with upper stage's mass of 1352kg. This work will give various insights, requiring performances to developing of KSIV-III and spacecraft design for future Korean Mars missions.

Observational Arc-Length Effect on Orbit Determination for Korea Pathfinder Lunar Orbiter in the Earth-Moon Transfer Phase Using a Sequential Estimation

  • Kim, Young-Rok;Song, Young-Joo
    • Journal of Astronomy and Space Sciences
    • /
    • v.36 no.4
    • /
    • pp.293-306
    • /
    • 2019
  • In this study, the observational arc-length effect on orbit determination (OD) for the Korea Pathfinder Lunar Orbiter (KPLO) in the Earth-Moon Transfer phase was investigated. For the OD, we employed a sequential estimation using the extended Kalman filter and a fixed-point smoother. The mission periods, comprised between the perigee maneuvers (PM) and the lunar orbit insertion (LOI) maneuver in a 3.5 phasing loop of the KPLO, was the primary target. The total period was divided into three phases: launch-PM1, PM1-PM3, and PM3-LOI. The Doppler and range data obtained from three tracking stations [included in the deep space network (DSN) and Korea Deep Space Antenna (KDSA)] were utilized for the OD. Six arc-length cases (24 hrs, 48 hrs, 60 hrs, 3 days, 4 days, and 5 days) were considered for the arc-length effect investigation. In order to evaluate the OD accuracy, we analyzed the position uncertainties, the precision of orbit overlaps, and the position differences between true and estimated trajectories. The maximum performance of 3-day OD approach was observed in the case of stable flight dynamics operations and robust navigation capability. This study provides a guideline for the flight dynamics operations of the KPLO in the trans-lunar phase.

Preliminary Analysis on Launch Opportunities for Sun-Earth Lagrange Points Mission from NARO Space Center

  • Song, Young-Joo;Lee, Donghun
    • Journal of Astronomy and Space Sciences
    • /
    • v.38 no.2
    • /
    • pp.145-155
    • /
    • 2021
  • In this work, preliminary launch opportunities from NARO Space Center to the Sun-Earth Lagrange point are analyzed. Among five different Sun-Earth Lagrange points, L1 and L2 points are selected as suitable candidates for, respectively, solar and astrophysics missions. With high fidelity dynamics models, the L1 and L2 point targeting problem is formulated regarding the location of NARO Space Center and relevant Target Interface Point (TIP) for each different launch date is derived including launch injection energy per unit mass (C3), Right ascension of the injection orbit Apoapsis Vector (RAV) and Declination of the injection orbit Apoapsis Vector (DAV). Potential launch periods to achieve L1 and L2 transfer trajectory are also investigated regarding coasting characteristics from NARO Space Center. The magnitude of the Lagrange Orbit Insertion (LOI) burn, as well as the Orbit Maintenance (OM) maneuver to maintain more than one year of mission orbit around the Lagrange points, is also derived as an example. Even the current work has been made under many assumptions as there are no specific mission goals currently defined yet, so results from the current work could be a good starting point to extend diversities of future Korean deep-space missions.