• 제목/요약/키워드: Optimum schedule

검색결과 89건 처리시간 0.032초

용인지역 저온양봉사의 환경조절성능 분석(농업시설) (Analysis of Environment Control Capability Wintering Beehouse in Young Area)

  • 이석건;김란숙;이현우;이종원
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2000년도 학술발표회 발표논문집
    • /
    • pp.302-307
    • /
    • 2000
  • The wintering honey bee chambers were constructed and inside environment factors were analyzed to provide high technology for efficient wintering of honeybee colonies. As a result of this study, inside air temperature of yongin chamber under the wide range of outside temperature condition was found to be appropriated for wintering of bee, and inside temperature of beehive was about 2$^{\circ}C$ higher than the air temperature in the chamber. The fan operation schedule did not control the high temperature down properly in the chamber, It was necessary to find a new fan operation schedule to be able to provide the optimum temperature for wintering honey bee colonies. inside humidity variation of Yongin chamber was very much depended on outside humidity.

  • PDF

고객의 주문과 자율분산 생산시스템의 연동에 관한 연구 (A Study on the Order-Based Autonomous Distributed Manufacturing System)

  • 송재성;서만승
    • 한국정보시스템학회:학술대회논문집
    • /
    • 한국정보시스템학회 2000년도 추계학술대회
    • /
    • pp.1.4-4
    • /
    • 2000
  • We present an autonomous distributed manufacturing system to plan the manufacturing process and the schedule based on a customer order, which considers the system efficiency as well as to the flexibly. In our system, an intermediate conceptual agent called process agent is introduced, of which the role is to create a plausible alternative for the working group to fulfill the given order. The process related decision such as process sequence, allocated facilities, schedule and cost is also made simultaneously. Given an order, several these process agents are created, and the optimum on is selected through a bidding mechanism. As a criterion of such a decision-making, we consider a concept of value which is determined by several factors such as cost, delivery, working ratio and so forth. Every agent consisting of the system makes decisions and actions so as to maximize its possessing value, and the overall behavior of the system is controlled by the value distribution.

  • PDF

복수의 CPU로 제어되는 매니퓰레이터의 병렬계산 알고리즘 (Algorithm or Parallel Computation for a multi-CPU controlled Robot Manipulator)

  • 우광방;김현기;최규석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 전기.전자공학 학술대회 논문집(I)
    • /
    • pp.288-292
    • /
    • 1987
  • The purpose of this paper is to develope the parallel computation algorithm that enables it to minimize the completion tine of computation execution of the entire subtasks, under the constraints of the series-parallel precedence relation in each subtask. The developed algorithm was applied to the control of a robot manipulator functioned by multi-CPU's and to obtain the minimum time schedule so that real time control may be achieved. The completion time of computation execution was minimized by applying "Variable" Branch and Bound algorithm which was developed In this paper in determining the optimum ordered schedule for each CPU.

  • PDF

정시성 확보를 위한 버스노선 당 적정 운행시간 산정 연구 (Study on the Optimum Route Travel Time for Bus to Improve Bus Schedule Reliability)

  • 김민주;이영인
    • 한국ITS학회 논문지
    • /
    • 제16권6호
    • /
    • pp.112-123
    • /
    • 2017
  • 정부의 대중교통활성화 정책과 이용자들의 승용차에서 버스나 지하철로의 수단 전환으로, 대중교통의 정확한 배차시간과 도착시간의 확보가 중요해졌다. 서울시에서 제공하는 버스운행관리시스템(BMS : Bus Management System) 자료를 이용하여, 실시간 버스위치, 배차간격, 운행이력 등의 정보를 알 수 있다. 본 연구에서는 BMS 자료를 이용하여 안전운행을 하면서 정시성도 확보할 수 있는 방안을 제안하고자 한다. 다른 연구와는 다르게, 버스 정류장 사이 구간을 5개의 지점과 6개의 시간으로 나누어, 각각의 시간을 BMS 자료를 이용하여 산정하였다. 또한, 각 시간에 영향을 주는 주된 원인을 살펴보고, 요소별 평균, 표준편차, 변동계수를 이용하여 정류장 별 정시성과 안전성, 이동성을 모두 확보한 버스 노선의 적정 운행시간을 제안하였다.

화물의 인도시기를 최우선으로 하는 배선문제 (Optimum Allocation of Ships Emphasizing the Cargo Delivery Time)

  • 이중우;양시권;이철영
    • 한국항해학회지
    • /
    • 제5권1호
    • /
    • pp.1-23
    • /
    • 1981
  • As far as transportation problems are concerned, the minimization of transportation cost is the most prevailing object. But in some cases, the cargo delivery time is the utter problem rather than the cost. For instance, we may imagine the case that the delivery of the construction materials is delayed behind the schedule and this makes the construction cost increased because of idle time of other materials and man power, in addition to the indemnity. Therefore the allocation of ships, in marine transportation which is now the main route of overseas trade, to the needed area on the required time is to be appropriately performed. However, there are several restrictions for cargo delivery to meet the demand, such as ship's size, number to be employed and cargo handling capacity of the ports, etc. And there are some other factors to be considered, that is, the degree of necessities of commodities, on their kinds, amount, and the time of arrival, etc. This paper deals with the problem of optimum allocation of ships emphasizing the cargo delivery time adopting Linear Programming technique with those cargo delivery restrictions and factors transformed by introducing the multi-speed conception, the conversion of multi-commodity to a single commodity, allowable delivery time, weight penalty number and nominating priority. This paper presents a case of optimum allocation of ships in the light of cargo delivery time for a construction company which has two different construction places and analyzes the result. This study will give a planner a good tool for optimum planning of maring transportation and be used for decision of schemes.

  • PDF

졸-겔법에 따른 실리카 유리 제조에 있어서 DCCA의 역할에 관한 연구 (The Role of DCCA in the Sol-Gel Process Preparing Silica Glass)

  • 박용완;연석주
    • 한국세라믹학회지
    • /
    • 제28권6호
    • /
    • pp.488-494
    • /
    • 1991
  • In this study, the effects of catalyst and DCCA content were investigated in order to determine the optimum conditions of monolithic silica gel formation through sol-gel process. Formamide, oxalic acid, glycerol and dimethylformamide are used as DCCA. To observe the phenomena in drying and heat-treating of gels, we examined structural exchange of gels using FT-IR, TG-DTA and XRD. Monolithic gels were obtained by adding formamide and dimethylformamide as DCCA. According to the heat treatment schedule, silica glass is prepared by heat-treatment up to 1050$^{\circ}C$.

  • PDF

다결정상 Machinable Ceramics의 제조 (Fabrication of Multicrystalline Machinable Ceramics)

  • 김재국;양삼열;정창주
    • 한국세라믹학회지
    • /
    • 제28권10호
    • /
    • pp.793-802
    • /
    • 1991
  • The multicrystalline machinable ceramics was fabricated by melting method using domestic pyrophyllite. After determination of optimum crystallization temperature and time from results of DTA, XRD and SEM, base glasses were heat treated by 2-step schedule. Main crystalline phases identified by XRD, EDX were Na-fluorophlogopite, ${\beta}$-spoduemen and ${\alpha}$-cordierite, and the crystallization condition of these crystals was varied with chemical composition, thermal history and nucleation agents. The thermal, chemical properties of prepared samples were excellent.

  • PDF

여러 종류의 작업 처리가 가능한 기계 시스템에 대한 LPT 스케줄링 (LPT Scheduling for Multipurpose Machines)

  • 황학진
    • 산업공학
    • /
    • 제16권spc호
    • /
    • pp.132-137
    • /
    • 2003
  • We consider scheduling jobs on multipurpose machines where jobs can be processed by a subset of the machines operated in parallel with the objective of minimizing makespan. We apply LPT(Longest Processing Time first) algorithm and prove that its posterior worst-case performance ratio is at most $log_24m/(1+{\lambda})$, where \lambda is the number of machines eligible for processing the job with the latest completion time. In general, LPT is shown to always find a schedule with makespan at most $log_24m/3$ times optimum.

현장생산용 고강도 콘크리트 파일에 관한 실험적 연구 (AN EXPERIMENTAL STUDY ON THE PRODUCTION OF HIGH-STRENGTH CONCRETE PILE IN SITE)

  • 박칠림;권영호;백명종;이상수;정도순
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1995년도 봄 학술발표회 논문집
    • /
    • pp.183-188
    • /
    • 1995
  • Up to date, high-strength concrete pile which is producing in factory sells in the market. But according to the site and the construction conditions, the system to produce high-strength concrete pile directly in site is utilized in advanced country. Such the production system is the technique phenomenon very disirable in the side of quality control in site and the construction schedule, the time and the cost saving. This study is a fundamental experiment including concrete mixing design, non-autoclave curing method and the optimum condition to produce high-strengh concrete pile in site. As results of this study, High-strength concrete pile in site which target strength is 400kg/ $\textrm{cm}^2$ is able to produce it with optimum curing ciondition(75$^{\circ}C$, 9hr)and mixing design.

  • PDF

자궁 경부암 고선량율 강내조사 치료의 국내 현황과 적정 치료방법 (Current Status of High Dose Rate Brachytherapy in Cervical Cancer in Korea and Optimal Treatment Schedule)

  • 허승재
    • Radiation Oncology Journal
    • /
    • 제16권4호
    • /
    • pp.357-366
    • /
    • 1998
  • Brachytherapy is an essential part of radiotherapy for uterine cervical cancer. The low dose rate (LDR) regimen has been the major technique of intracavitary therapy for cervical cancer. However, there has been an expansion in the last 20 years of high dose rate (HDR) machines using Ir-192 sources. Since 1979, HDR brachytherapy has been used for the treatment of uterine cervical cancer in Korea. The number of institutions employing HDR has been increasing, while the number of low dose rate system has been constant. In 1995, there was a total 27 HDR brachytherapy units installed and 1258 cases of patients with cervical cancer were treated with HDR Most common regimens of HDR brachytherapy are total dose of 30-39 Gy at point A with 10-13 fractions in three fractions per week. 24-32 Gy with 6-8 fractions in two fractions per week, and 30-35 Gy with 6-7 fractions in two fractions per week. The average fractionation regimen of HDR brachytherapy is about 8 fractions of 4.1 Gy each to Point A. In Korea, treatment results for HDR brachytherapy are comparable with the LDR series and appears to be a safe and effective alternative to LDR therapy for the treatment of cervical carcinoma. Studies from the major centers report the five-year survival rate of cervical cancer as. 78-86$\%$ for Stage 1, 68-85$\%$ for stage 11, and 38-56$\%$ for Stage III. World-wide questionnaire study and Japanese questionnaire survey of multiple institutions showed no survival difference in any stages and dose-rate effect ratio (HDR/LDR) was calculated to be 0.54 to 0.58. However the optimum treatment doses and fractionation schemes appropriate to generate clinical results comparable to conventional LDR schemes have yet to be standardized. In conclusion, HDR intracavitary radiotherapy is increasingly practiced in Korea and an effective treatment modality for cervical cancer. To determine the optimum radiotherapy dose and fractionation schedule, a nation-wide prospective study is necessary in Korea. In addition, standardization of HDR application (clinical, computer algorithms, and dosimetric aspects) is necessary.

  • PDF