Kim, Jhongkwon;Park, Hyunjun;Bae, Junhyuk;Jeong, Sangkwon;Chang, Daejun
Progress in Superconductivity and Cryogenics
/
v.21
no.1
/
pp.40-44
/
2019
This study investigates mixtures of water and cryoprotectant agents (CPAs) to store high-grade cold energy. Although water is an ideal material for a cold thermal storage (CTS) due to its high specific heat, undesirable volume expansion may cause structural stresses during freezing. The volume expansion can be alleviated by adding the CPAs to water. However, the CPA aqueous solutions not only have different thermal properties but also transit to amorphous state different from pure water. Therefore, these characteristics should be considered when using them as material of the CTS. In experiments, glycerol and dimethyl sulfoxide (DMSO) are selected as the candidate CPA. The volume expansion of the solution is measured by an in-situ strain gauge in low temperature region. The specific heat capacity of the solution is also measured by differential scanning calorimetry (DSC). Both the amount of volume expansion and the specific heat capacity of the CPA aqueous solution decrease in the case of higher concentration of CPA. These characteristics should be contemplated to select optimal aqueous solution for CTS for liquid air energy storage system (LAES). The CPA solutions have advantages of having wide temperature range to utilize the latent heat of water and higher sensible heat of the CPA. The CPA solutions which can satisfy the allowable stress of the structure are determined. Consequently, among the CPA solutions investigated, DMSO 20% w/w solution is the most suitable for the CTS.
Journal of the military operations research society of Korea
/
v.24
no.2
/
pp.75-94
/
1998
AS/RS(Automated Storage/Retrieval Systems) has inflexibility in change after implementation and its initial cost is very high. Therefore, the proper and correct design of AS/RS is needed at the planning stage. Cost and performance are one of the most important factors in AS/RS design. There is a trade-off relationship between them. Velocity and number of stacker cranes have a deep relationship with performance of AS/RS. In this study, a model and a heuristic algorithm for finding optimal rack volumes and velocities of stacker for design of AS/RS are proposed with a numerical example.
It is a crucial requirement to utilize an economical battery capacity for the wind energy conversion system. In this paper, the optimal BESS capacity is determined for the wind farm whose dispatched power is assigned by the min-max dispatching method. Based on a lifetime cost function that indicates the BESS cost spent to dispatch 1kWh wind energy into grid, the battery capacity can be optimized so as to obtain the minimum system operation cost. Moreover, the battery state of charge (SOC) is also managed to be in a safe operating range to ensure the system undamaged. In order to clarify the proposed optimizing method, a 3MW permanent magnet synchronous generator (PMSG) wind turbine model and real wind speed data measured each minute are investigated.
Recently, more power facilities are needed to cope with the increasing electric demand. However, the additional construction of generators, transmission and distribution installations is not easy because of environmental problems and citizen's complaints. Under this circumstance, a microgrid system with distributed renewable resources emerges as an alternative of the traditional power systems. Moreover, the configuration of power system changes with more DC loads and more DC installations. This paper is written to introduce an idea of a genetic algorithm-based solution to determine the optimal capacity of the distributed generators depending on the types of system configuration: AC-link, DC-link and Hybrid-link types. In this paper, photovoltaic, wind turbine, energy storage system and diesel generator are considered as distributed generators and the feasibility of the proposed algorithm is verified by comparing the calculated capacity of each distributed resource with HOMER simulation results for 3 types of system configuration.
Transactions of the Korean Society of Automotive Engineers
/
v.24
no.3
/
pp.345-351
/
2016
This study was carried out to determine an optimal lean $NO_x$ trap (LNT) regeneration condition based on a $NO_x$ storage fraction. The LNT regeneration was performed by an in-cylinder post fuel injection method. A $NO_x$ storage fraction is defined by the ratio of current cumulated $NO_x$ amount in the LNT to the $NO_x$ storage capacity: 0 means empty and 1 fully loaded. In this study five engine operating conditions were chosen to represent the New European Driving Cycle. With various $NO_x$ storage fractions each engine operating condition, the LNT regeneration was executed and then $NO_x$ conversion efficiency, additional fuel consumption, CO and THC slip, peak catalyst temperature were measured. The results showed that there exist an optimal condition to regenerate the LNT, eg. 1500 rpm 6 bar BMEP with below 0.7 $NO_x$ storage fraction in this experimental constraint.
In the existing literature, most of the purchasing models were developed only for retailers problem ignoring the constraint of storage capacity of retailers shop/showroom. In this paper, we have developed a deterministic model of wholesaler-retailers' problem of single product. The storage capacity of wholesaler's warehouse/showroom and retailers' showroom/shop are assumed to be finite. The items are transported from wholesaler's warehouse to retailers' Own Warehouse (OW) in a lot. The customer's demand is assumed to be displayed inventory level dependent. Demands are met from OW and that spaces of OW will immediately be filled by shifting the same amount from the Rented Warehouse (RW) till the RW is empty. The time duration between selling from OW and filling up its space by new ones from RW is negligible. According to relative size of the retailers' existing (own) warehouse capacity and the demand factors, different scenarios are identified. Our objectives are to optimize the cost functions of wholesaler and two retailers separately. To solve this problem, a real coded Genetic Algorithm (GA) with roulette wheel selection/reproduction, whole arithmetic crossover and non-uniform mutation is developed. Finally a numerical example is presented to illustrate the results for different scenarios. To compare the results of GA, Generalised Reduced Gradient Method has been used for the problem. Also, a sensitivity analysis has been performed to study the variations of the optimal average cost with respect to the different parameters.
Miyeon, Yoon;Jinwoo, Han;Ji-Kwang, Lee;Kyeongdal, Choi;Jung Tae, Lee;Seungyong, Hahn;Woo-Seok, Kim
Progress in Superconductivity and Cryogenics
/
v.24
no.4
/
pp.50-54
/
2022
High temperature superconducting (HTS) magnets for large-capacity energy storage system need to be composed of toroid magnets with high energy density, low leakage magnetic fields, and easy installation. To realize such a large capacity of a toroid HTS magnet, an HTS cable with large current capacity would be preferred because of the limited DC link voltage and instantaneous high power required for compensation of the disturbance in the power grid. In this paper, the optimal operating strategies of the SMES for peak load reduction of the microgrid system were calculated according to the load variation characteristics, and the effect of compensation of the frequency change in microgrid with a SMES were also simulated. Based on the result of the simulation, key design parameters of SMES coil were presented for two cases to define the specification of the HTS cable with large current capacities for winding of HTS toroid coils, which will be need for development of the HTS cable as a future work.
Kim, Seul-Ki;Kim, Jong-Yul;Cho, Kyeong-Hee;Byun, Gil-Sung
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.1
/
pp.27-34
/
2014
The paper proposed a sizing method of an energy storage system(ESS) for peak shaving of high-speed railway substations based on load profile patterns of substations. A lithium based battery ESS was selected since it can produce high-power at high speed that peak shaving requires, and also takes up a relatively smaller space for installation. Adequate size of the ESS, minimum capacity which can technically meet a peak shaving target, was determined by collectively considering load patterns of a target substation, characteristics of the ESS to be installed, and optimal scheduling of the ESS. In case study, a local substation was considered to demonstrate the proposed sizing method. Also economic analysis with the determined size of ESS was performed to calculate electricity cost savings of the peak shaving ESS, and to offer pay-back period and return on investment.
The objective of the study is to develop a reservoir optimal operation model and to suggest the appropriate amount of additional water supply and optimal operation rule. The model uses multiple objective function and a global search method, SCE-UA method. The objective function is set up to maintain the storage at target level, to satisfy the water demand, and to maximize the hydropower product. To evaluate the model's applicability, the model was applied for allocating the optimal water depending on storage level changes of Seomjin dam. The results comparing optimal operation and historical data showed that hydropower product increased from $-2.29\%$ to $14.51\%$, $-5.94\%$ to $3.98\%$, and $-0.43\%$ to $6.35\%$ with varying target levels in wet, dry, and normal period, respectively. Also, The model was applied for assessing water supply capacity of Seomjin dam to satisfy increasing water demand. The dam was operated by the model on consideration of downstream flow as 0.17, 0.50, 0.70, 1.0, 1.5, and $3.0\;m^3/sec$. The results showed that in case of operating the dam with downstream flow less than $0.70\;m^3/sec$ and with target water level lower than 194.0 m, hydropower product was more than the historical operation data and existing amount of water supply was less influenced.
This paper studies the multi-domain coupled system of one dimensional Arctic temperature field and establishes identification model about the thermodynamic parameters of sea ice (heat storage capacity, density and conductivity) by the so-called output least-square estimate according to the temperature data acquired by a monitor buoy installed in the Arctic ocean. By the optimal control theory, the existence and dependability of weak solution and the identifiability of identification model have been given. Moreover, necessary optimality condition is proposed. Furthermore, the optimal algorithm for the identification model is constructed. By using the optimal thermodynamic parameters of Arctic sea ice, the numerical simulation is implemented, and the numerical results of temperature distribution of Arctic sea ice are demonstrated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.