• Title/Summary/Keyword: Operations Scheduling

Search Result 590, Processing Time 0.027 seconds

Design of Living Lab with BEMS via EnergyPlus for Scheduling HVAC System Considering Occupancy Schedule (리빙랩(Living-lab) 설계를 위한 BEMS 및 EnergyPlus 기반 재실 여부 고려 공조계획 도출)

  • Lee, Jae-Ho;Kim, Sung-Joong;Yoon, Yong-Tae;Kim, Kyoung-Hoon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1135-1145
    • /
    • 2022
  • Due to increase in concerns related to the climate change, state-wide promotion of the carbon neutrality has been in progress thus far. Smart City could be one of the measures as the initiative to mitigate the missions process. The primary purpose of Smart City can be summarized to be maximization of the social net-beneift to be returned for the local citizens and derivation of the optimal pattern of the energy consumption could belong to one of the elements included in the net-benefit. Currently, the energy consumption by the buildings has been determined to be responsible for the greatest consumption among the sectors considered to be energy-intensive. Moreover, considering the fact that the consumption by operations of HVAC is responsible for nearly 40% in the commercial buildings, it is virtually not possible to optimize schedules for the energy consumption with considerable deliverables from the perspective of the urban planners. Thus, the methods to implement the optimal schedules for the HVAC commissioned with the OHUs were concluded to be the suitable candidate resources for the simulation by EnergyPlus capable of monitoring the thermal changes in each subject space in the present research.

A Study on Power Trading Methods for in a Hydrogen Residential Model (수소주거모델의 전력 거래 참여 방안 고찰)

  • KISEOK JEONG;TAEYOUNG JYUNG
    • Journal of Hydrogen and New Energy
    • /
    • v.34 no.2
    • /
    • pp.91-99
    • /
    • 2023
  • Participation in power trading using surplus power is considered a business model active in the domestic energy trade market, but it is limited only if the legal requirements according to the type, capacity, and use of the facilities to be applied for are satisfied. The hydrogen residential demonstration model presented in this paper includes solar power, energy storage system (ESS), fuel cell, and water electrolysis facilities in electrical facilities for private use with low-voltage power receiving system. The concept of operations strategy for this model focuses on securing the energy self-sufficiency ratio of the entire system, securing economic feasibility through the optimal operation module installed in the energy management system (EMS), and securing the stability of the internal power balancing issue during the stand-alone mode. An electric facility configuration method of a hydrogen residential complex demonstrated to achieve this operational goal has a structure in which individual energy sources are electrically connected to the main bus, and ESS is also directly connected to the main bus instead of a renewable connection type to perform charging/discharging operation for energy balancing management in the complex. If surplus power exists after scheduling, participation in power trading through reverse transmission parallel operation can be considered to solve the energy balancing problem and ensure profitability. Consequentially, this paper reviews the legal regulations on participation in electric power trading using surplus power from hydrogen residential models that can produce and consume power, gas, and thermal energy including hybrid distributed power sources, and suggests action plans.

Research on Urban Air Mobility Operations Optimization Research Trends (도심항공교통(Urban Air Mobility) 운영 최적화 연구 동향에 관한 연구)

  • Jibok Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.701-706
    • /
    • 2023
  • The Korean government and industry have presented a roadmap for the commercialization of UAM services and are promoting it in earnest. In order to introduce full-scale UAM services, there are various issues to be solved, such as the development of high-performance aircraft, the design of network bases and corridors, the optimization of operation management, and the establishment of related laws and systems. In this study, in terms of optimizing operation management, we will examine research trends by field, focusing on Korea, and derive research topics that need to be solved in the future. Korean researchers have suggested that research is centered on UAM service usage fees, usage intentions and acceptance models, and vertiport location selection, but operational optimization studies such as service order acceptance, aircraft repositioning, and battery charging and maintenance scheduling are needed in the future.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A hybrid genetic algorithm for the optimal transporter management plan in a shipyard

  • Jun-Ho Park;Yung-Keun Kwon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.12
    • /
    • pp.49-56
    • /
    • 2023
  • In this study, we propose a genetic algorithm (GA) to optimize the allocation and operation order of transporters. The solution in the GA is represented by a set of lists each of which the operation order of the corresponding transporter. In addition, it was implemented in the form of a hybrid genetic algorithm combining effective local search operations for performance improvement. The local search reduces the number of operating transporters by moving blocks from a transporter with a low workload into that with a high workload. To evaluate the effectiveness of the proposed algorithm, it was compared with Multi-Start and a pure genetic algorithm through a simulation environment similar in scale to an actual shipyard. For the largest problem, compared to them, the number of transporters was reduced by 40% and 34%, and the total task time was reduced by 27% and 17%, respectively.

Two-phases Hybrid Approaches and Partitioning Strategy to Solve Dynamic Commercial Fleet Management Problem Using Real-time Information (실시간 정보기반 동적 화물차량 운용문제의 2단계 하이브리드 해법과 Partitioning Strategy)

  • Kim, Yong-Jin
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.2 s.73
    • /
    • pp.145-154
    • /
    • 2004
  • The growing demand for customer-responsive, made-to-order manufacturing is stimulating the need for improved dynamic decision-making processes in commercial fleet operations. Moreover, the rapid growth of electronic commerce through the internet is also requiring advanced and precise real-time operation of vehicle fleets. Accompanying these demand side developments/pressures, the growing availability of technologies such as AVL(Automatic Vehicle Location) systems and continuous two-way communication devices is driving developments on the supply side. These technologies enable the dispatcher to identify the current location of trucks and to communicate with drivers in real time affording the carrier fleet dispatcher the opportunity to dynamically respond to changes in demand, driver and vehicle availability, as well as traffic network conditions. This research investigates key aspects of real time dynamic routing and scheduling problems in fleet operation particularly in a truckload pickup-and-delivery problem under various settings, in which information of stochastic demands is revealed on a continuous basis, i.e., as the scheduled routes are executed. The most promising solution strategies for dealing with this real-time problem are analyzed and integrated. Furthermore, this research develops. analyzes, and implements hybrid algorithms for solving them, which combine fast local heuristic approach with an optimization-based approach. In addition, various partitioning algorithms being able to deal with large fleet of vehicles are developed based on 'divided & conquer' technique. Simulation experiments are developed and conducted to evaluate the performance of these algorithms.

Integer Programming-based Operation Sequencing for Multi-operation on Single Machine (정수계획법을 통한 다중작업 수행 단일기계에서의 작업순서 결정)

  • Park, Seonyeong;Shin, Moonsoo
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.9 no.3
    • /
    • pp.261-270
    • /
    • 2019
  • With the advent of the Fourth Industrial Revolution, multi-variety production in the up-to-date manufacturing environment is proceeding more rapidly whereby production planning and management have been getting more complicated. Moreover, the need to improve production efficiency through effective operation sequencing is further heightened. Fundamentally, the effective operation sequencing can reduce the set-up of the equipment, efficiently utilize the equipment, shorten the set-up time, and ultimately contribute to productivity improvement. This study deals with the problem of efficient operation sequencing in a situation where a single machine performs multiple operations. The complexity of the problem is very high when compared to the case where only one operation is performed on one machine, which is covered in most existing studies. In this paper, we propose an integer programming model to minimize the number of setups. This study aims at minimizing the number of mold replacement times in the process of processing a given production order for the wiring harness manufacturing process, which is one of the components of automobile electric field. In addition, brief case studies are presented to verify the validity of the proposed mathematical model.

Design of an Efficient Control System for Harbor Terminal based on the Commercial Network (상용망 기반의 항만터미널 효율적인 관제시스템 설계)

  • Kim, Yong-Ho;Ju, YoungKwan;Mun, Hyung-Jin
    • Journal of Industrial Convergence
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2018
  • The Seaborne Trade Volume accounts for 97% of the total. This means that the port operation management system can improve port efficiency, reducing operating costs, and the manager who manages all operations at the port needs to check and respond quickly when delays of work and equipment support is needed. Based on the real-time location information confirmation of yard automation equipment used the existing system GPS, the real-time location information confirmation system is a GPS system of the tablet, rather than a port operation system that monitors location information for the entered information, depending on the completion of the task or the start of the task. Network configurations also reduce container processing delays by using commercial LTE services that do not have shading due to containers in the yard also reduce container processing delays. Trough introduction of smart devices using Android or IOS and container processing scheduling utilizing artificial intelligence, we will build a minimum delay system with Smart Device usage of container processing applications and optimization of container processing schedule. The adoption of smart devices and the minimization of container processing delays utilizing artificial intelligence are expected to improve the quality of port services by confirming the processing containers in real time to consumers who are container information demanders.

A Study on the Legal Proposal of Crew's Fatigue Management in the Aviation Regulations (항공법규에서의 승무원 피로관리기준 도입방안에 관한 연구 - ICAO, FAA, EASA 기준을 중심으로 -)

  • Lee, Koo-Hee;Hwang, Ho-Won
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.27 no.1
    • /
    • pp.29-73
    • /
    • 2012
  • Aviation safety is the State and industry's top priority and more scientific approaches for fatigue management should be needed. There are lately various studies and regulation changes for crew fatigue management with ICAO, FAA and EASA. ICAO issued the provisions of fatigue management for flight crew since 1st edition, 1969, of Annex 6 operation of aircraft as a Standards and Recommended practice(SARPs). Unfortunately, there have been few changes and improvement to fatigue management provisions since the time they were first introduced. However the SARPs have been big changed lately. ICAO published guidance materials for development of prescriptive fatigue regulations through amendment 33A of Annex 6 Part 1 as applicable November 19th 2009. And then ICAO introduced additional amendment for using Fatigue Risk Management System (FRMS) with $35^{th}$ amendment in 2011. According to the Annex 6, the State of the operator shall establish a) regulations for flight time, flight duty period, duty period and rest period limitations and b) FRMS regulations. The Operator shall implement one of following 3 provisions a) flight time, flight duty period, duty period and rest period limitations within the prescriptive fatigue management regulations established by the State of the Operator; or b) a FRMS; or c) a combination of a) and b). U.S. FAA recently published several kinds of Advisory Circular about flightcrew fatigue. U.S. passed "Airline Safety and FAA Extension Act of 2010" into law on August 1st, 2010. This mandates all commercial air carriers to develop a FAA-acceptable Fatigue Risk Management Plan(FRMP) by October 31st, 2010. Also, on May 16, 2012, the FAA published a final rule(correction) entitled 'Flightcrew Member Duty and Rest Requirements; correction to amend its existing prescriptive regulations. The new requirements are required to implement same regulations for domestic, flag and supplemental operations from January 4, 2014. EASA introduced a Notice of Proposed Amendment (NPA) 2010-14 entitled "Draft opinion of the European Aviation Safety Agency for a Commission Regulation establishing the implementing rules on Flight and Duty Time Limitations and Rest Requirements for Commercial Air Transport with aeroplanes" on December 10, 2010. The purpose of this NPA is to develop and implement fatigue management for commercial air transport operations. Comparing with Korean and foreign regulations regarding fatigue management, the provisions of ICAO, FAA, EASA are more considering various fatigue factors and conditions. Korea regulations should be needed for some development of insufficiency points. In this thesis, I present the results of the comparative study between domestic and foreign regulations in respect of fatigue management crew member. Also, I suggest legal proposals for amendment of Korea Aviation act and Enforcement Regulations concerning fatigue management for crew members. I hope that this paper is helpful to change korea fatigue regulations, to enhance aviation safety, and to reduce the number of accidents relating to fatigue. Fatigue should be managed at all level such as regulators, experts, operators and pilots. Authority should change surveillance mind-set from regulatory auditor to expert adviser. Operators should identify various fatigue factors and consider to crew scheduling them. Crews should strongly manage both individual and duty-oriented fatigue issues.

  • PDF

Using the METHONTOLOGY Approach to a Graduation Screen Ontology Development: An Experiential Investigation of the METHONTOLOGY Framework

  • Park, Jin-Soo;Sung, Ki-Moon;Moon, Se-Won
    • Asia pacific journal of information systems
    • /
    • v.20 no.2
    • /
    • pp.125-155
    • /
    • 2010
  • Ontologies have been adopted in various business and scientific communities as a key component of the Semantic Web. Despite the increasing importance of ontologies, ontology developers still perceive construction tasks as a challenge. A clearly defined and well-structured methodology can reduce the time required to develop an ontology and increase the probability of success of a project. However, no reliable knowledge-engineering methodology for ontology development currently exists; every methodology has been tailored toward the development of a particular ontology. In this study, we developed a Graduation Screen Ontology (GSO). The graduation screen domain was chosen for the several reasons. First, the graduation screen process is a complicated task requiring a complex reasoning process. Second, GSO may be reused for other universities because the graduation screen process is similar for most universities. Finally, GSO can be built within a given period because the size of the selected domain is reasonable. No standard ontology development methodology exists; thus, one of the existing ontology development methodologies had to be chosen. The most important considerations for selecting the ontology development methodology of GSO included whether it can be applied to a new domain; whether it covers a broader set of development tasks; and whether it gives sufficient explanation of each development task. We evaluated various ontology development methodologies based on the evaluation framework proposed by G$\acute{o}$mez-P$\acute{e}$rez et al. We concluded that METHONTOLOGY was the most applicable to the building of GSO for this study. METHONTOLOGY was derived from the experience of developing Chemical Ontology at the Polytechnic University of Madrid by Fern$\acute{a}$ndez-L$\acute{o}$pez et al. and is regarded as the most mature ontology development methodology. METHONTOLOGY describes a very detailed approach for building an ontology under a centralized development environment at the conceptual level. This methodology consists of three broad processes, with each process containing specific sub-processes: management (scheduling, control, and quality assurance); development (specification, conceptualization, formalization, implementation, and maintenance); and support process (knowledge acquisition, evaluation, documentation, configuration management, and integration). An ontology development language and ontology development tool for GSO construction also had to be selected. We adopted OWL-DL as the ontology development language. OWL was selected because of its computational quality of consistency in checking and classification, which is crucial in developing coherent and useful ontological models for very complex domains. In addition, Protege-OWL was chosen for an ontology development tool because it is supported by METHONTOLOGY and is widely used because of its platform-independent characteristics. Based on the GSO development experience of the researchers, some issues relating to the METHONTOLOGY, OWL-DL, and Prot$\acute{e}$g$\acute{e}$-OWL were identified. We focused on presenting drawbacks of METHONTOLOGY and discussing how each weakness could be addressed. First, METHONTOLOGY insists that domain experts who do not have ontology construction experience can easily build ontologies. However, it is still difficult for these domain experts to develop a sophisticated ontology, especially if they have insufficient background knowledge related to the ontology. Second, METHONTOLOGY does not include a development stage called the "feasibility study." This pre-development stage helps developers ensure not only that a planned ontology is necessary and sufficiently valuable to begin an ontology building project, but also to determine whether the project will be successful. Third, METHONTOLOGY excludes an explanation on the use and integration of existing ontologies. If an additional stage for considering reuse is introduced, developers might share benefits of reuse. Fourth, METHONTOLOGY fails to address the importance of collaboration. This methodology needs to explain the allocation of specific tasks to different developer groups, and how to combine these tasks once specific given jobs are completed. Fifth, METHONTOLOGY fails to suggest the methods and techniques applied in the conceptualization stage sufficiently. Introducing methods of concept extraction from multiple informal sources or methods of identifying relations may enhance the quality of ontologies. Sixth, METHONTOLOGY does not provide an evaluation process to confirm whether WebODE perfectly transforms a conceptual ontology into a formal ontology. It also does not guarantee whether the outcomes of the conceptualization stage are completely reflected in the implementation stage. Seventh, METHONTOLOGY needs to add criteria for user evaluation of the actual use of the constructed ontology under user environments. Eighth, although METHONTOLOGY allows continual knowledge acquisition while working on the ontology development process, consistent updates can be difficult for developers. Ninth, METHONTOLOGY demands that developers complete various documents during the conceptualization stage; thus, it can be considered a heavy methodology. Adopting an agile methodology will result in reinforcing active communication among developers and reducing the burden of documentation completion. Finally, this study concludes with contributions and practical implications. No previous research has addressed issues related to METHONTOLOGY from empirical experiences; this study is an initial attempt. In addition, several lessons learned from the development experience are discussed. This study also affords some insights for ontology methodology researchers who want to design a more advanced ontology development methodology.