• Title/Summary/Keyword: Operational Cost

Search Result 871, Processing Time 0.033 seconds

Optimal Provisioning Quantity Determination of Consumable Concurrent Spare Part under the Availability Limitation (운용가용도 제약하에서의 소모성 동시조달부품의 최적구매량 결정)

  • 오근태;김명수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.113-122
    • /
    • 1998
  • In this paper we consider the CSP requirements determination problem of new equipment(machine) system. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the consumable parts to derive the associated CSP requirement determination model in mathematical expression. Based on these analyses, a mathematical model is derived for making an optimal CSP requirement determination subject to tile constraint of satisfying any given operational availability limitation. We assume that the failure of a part follows a Poisson process. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the cost minimization problem that should satisfy the operational availability limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure is derived.

  • PDF

An Operational Strategy for Inventory Control of Networked Regional Distribution Centers (지역통합 네트워크관리하의 재고통제 운용전략에 관한 연구)

  • Kim, Byeong-Chan;Choi, Jin-Yeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.3
    • /
    • pp.110-116
    • /
    • 2008
  • Operational strategy for inventory control in the distribution system has been given attention. If an individual enterprise implements the strategy, it is not easy to gain scale merits because of limited quantity or burden of inventory. In this study, we propose an operational strategy for inventory control that considers managerial integration of regional distribution centers (RDCs) and present a model of it. In a network of several RDCs, they could share inventory information and supply parts for others in case of an inventory shortage. And a numerical example of the network is illustrated, which compares two operational strategies, integration management of RDCs and individual management of them. The result shows total cost reduction in the strategy of integration management through the efficient inventory control of multi-echelon distribution.

Optimal Provisioning Quantity Determination of Concurrent Spare Parts including Consumable Items and Repairable Items under the Availability Limitation (운용가용도 제약하에서 소모성부품과 수리순환부품이 혼재된 동시조달부품의 최적구매량 결정)

  • 오근태;김명수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.53-67
    • /
    • 2000
  • In this paper we consider the CSP requirements determination problem of new equipment(machine) system. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the consumable parts and the repairable parts to derive the associated CSP requirement determination model in mathematical expression. Based on these analyses, a mathematical model Is derived for making an optimal CSP requirement determination subject to the constraint of satisfying any given operational availability limitation. We assume that the failure of a part follows a Poisson process and the repair time has an exponential distribution. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the cost minimization problem that should satisfy the operational availability limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure Is derived.

  • PDF

INCREASING REALISM OF CONSTRUCTION SIMULATION THROUGH INTEGRATION OF OPERATIONAL AND MANAGERIAL ASPECTS

  • Sangwon Han;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.821-826
    • /
    • 2009
  • Current construction simulation approaches mostly focus on operation aspects of construction projects, ignoring managerial aspects which can radically change operational profiles (e.g., number of resources, expected productivity level, or daily working hours) during the course of construction. As a result, these approaches may mislead construction managers into unrealistic execution plans as well as make them difficult to find potential performance improvement areas. As an effort to address this issue, this paper establishes a comprehensive construction modeling framework which integrates operational and managerial aspects of construction projects. The proposed modeling framework will provide construction managers with more accurate, more reliable, and more realistic simulation results thus reducing the likelihoods of schedule delays and cost overruns.

  • PDF

A Study on Reliability Growth through Failure Analysis by Operational Data of Avionic Equipments (항공전자장비의 운용자료 분석을 통한 신뢰성 성장 연구)

  • Jo, In-Tak;Lee, Sang-Cheon;Park, Jong Hun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.100-108
    • /
    • 2013
  • In aerospace industry, MTBF (Mean Time Between Failure) and MFTBF (Mean Flight Time Between Failure) are generally used for reliability analysis. So far, especially to Korean military aircraft, MFTBF of avionic equipments is predicted by MIL-HDBK-217 and MIL-HDBK-338, however, the predicted MFTBF by military standard has a wide discrepancy to that of real-world operation, which leads to overstock and increase operation cost. This study analyzes operational data of avionic equipments. Operational MFTBF, which is calculated from operational data, is compared with predicted MFTBF calculated conventionally by military standard. In addition, failure rate trend is investigated to verify reliability growth in operational data, the investigation shows that failure rate curve from operational data has somewhat pattern with decreased failure rate and constant failure rate.

Investigation on Effective Operational Temperature of HTS Cable System considering Critical Current and AC loss

  • Kim, Tae-Min;Yim, Seong-Woo;Sohn, Song-Ho;Lim, Ji-Hyun;Han, Sang-Chul;Ryu, Kyung-Woo;Yang, Hyung-Suk
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.307-310
    • /
    • 2016
  • The operational cost for maintaining the superconductivity of high-temperature superconducting (HTS) cables needs to be reduced for feasible operation. It depends on factors such as AC loss and heat transfer from the outside. Effective operation requires design optimization and suitable operational conditions. Generally, it is known that critical currents increase and AC losses decrease as the operational temperature of liquid nitrogen ($LN_2$) is lowered. However, the cryo-cooler consumes more power to lower the temperature. To determine the effective operational temperature of the HTS cable while considering the critical current and AC loss, critical currents of the HTS cable conductor were measured under various temperature conditions using sub-cooled $LN_2$ by Stirling cryo-cooler. Next, AC losses were measured under the same conditions and their variations were analyzed. We used the results to select suitable operating conditions while considering the cryo-cooler's power consumption. We then recommended the effective operating temperature for the HTS cable system installed in an actual power grid in KEPCO's 154/22.9 kV transformer substation.

Evaluation of 2+1 Roads Application to Improve Rural Two-lane Highway in Korea (국내 2+1차로 도로 도입에 따른 교통운영 및 경제적 비용 측면의 기대효과 분석)

  • Chae, Chan Dle;Lee, Dong Min;Cho, Han Seon
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.85-92
    • /
    • 2013
  • PURPOSES: The purpose of this paper is to estimate expected effects on traffic operational and economic aspects of 2+1 roads application in Korea. METHODS : Micro simulation study using VISSIM 5.0 was used to analyze the operation efficiency of 2+1 roads compared to two-lane highways and four-lane highways. Some scenarios for various traffic volumes were set up in order to analyze the effect of 2+1 roads under various traffic situations. Also imaginary road networks were set up for each type of roads. The MOEs to measure the operation efficiency were selected with average travel speed and delay. For analyzing economic effect of 2+1 roads, construction cost of a specific imaginary 2+1 road was compared to construction cost of a four-lane highway with same conditions. RESULTS: The results of study show that a 2+1 road is more effective with 19 percents higher average travel speed and 39 percents lower average delay than a two-lane highway. In the economic analysis, construction costs to construct a 2+1 road are saved as approximately 26.4~40.7 percents when compared to construction of four-lane highway. CONCLUSIONS: It can be concluded that 2+1 roads can improve the traffic operational level of service for two-lane highways and 2+1 roads can be applied as an effective design alternative for higher-volume two-lane highways in Korea.

A study on the development of Logistic Support system (군수 지원시스템 개발 방법에 관한 연구)

  • 신주환;전완수;김형렬
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.166-172
    • /
    • 1999
  • Weapon system is defined as a combination of primary system and logistics support system which are evaluated by capability and operational availability respectively. Weapon system developer thought that primary system was weapon system and also only primary system was important. Recent comparison of total life cycle cost showed that logistics support system was proved to be more important than primary system. However, until now no systematic approach to logistics support system development have applied in the area of developing support system and much money was exhausted by wrong logistics support system. We need to construct a universal metric for effectiveness of logistics support system and to cut out whatever activities or support elements which do not contribute to the metrics. This study describes a new approach under the name function approach to logistics support system development and also classifies five factors of failure frequency, stock out of frequency, administrative delay time, active repair time and logistic delay time that have influence on operational availability of logistics support system.

  • PDF

A Case of Evaluation of the G2B System by Analysing Operational DB Data (DB운영 데이터 분석을 통한 G2B 시스템 평가 사례)

  • Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Services
    • /
    • v.11 no.2
    • /
    • pp.243-258
    • /
    • 2012
  • The G2B system is one of the important information systems in the e-government implementation. It is difficult to measure the cost reduction effect of the system introduction because there are many participants in the complex procurement processes. Previous approaches of the performance evaluation of such processes have been based on conducting some surveys and interviews with statistical methods. Therefore there have been some limitations in the verification of feasibility. Therefore this study tries to suggest a case of performance evaluation about the cost reduction in using of the G2B system by analyzing operational DB data from the G2B system. This study analyzed the procurement processes of G2B system according to 'goods' and 'facilities/services' and classified the procurement processes into 12 sub-processes. By developing an evaluation model for the cost reduction of e-procurement, we derived the whole cost reduction effect was 8,000 billon Won for the use of Korea KONEPS G2B system in 2008. Specially the cost reduction in the private sector was 6,600 billion Won. It was mainly due to the decrease of the offline visits to the related organizations to participate a bidding process. Moreover, the cost reduction of using shopping mall was 1,000 billion Won among the total 1,400 billion Won in the whole public sector. The main contribution of this paper is to show the more objective evaluation result of the use of e-procurement, which verifies the necessity of G2B system.

A Study on Cost Avoidance and Total Life Cycle Cost to Analysis of Effectiveness of the Management of DMSMS (부품단종관리 효용성 분석을 위한 회피비용 및 총수명주기비용에 대한 연구)

  • Kim, Si-Ok;Paik, Won-Chul;Kim, Dong-Gil;Kim, Heung-Geun
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.15 no.5
    • /
    • pp.791-798
    • /
    • 2020
  • The share of advanced technology in modern weapon systems are gradually increasing, and life cycle of components are shortened due to the rapid speed of technological development. On the other hand, the weapon systems have a characteristic that takes a long time in the requirement stage of weapon to the operation and maintenance stage. Due to inevitably, obsolescence of the main components for parts occurs in the acquisition phase. The obsolescence parts could cause delays in mass production schedules, and further adversely affects operational availability due to poor supply of repair parts during in the maintenance phase. However, business managers are obliged to maximize the performance while minimizing the cost of the total life cycle of the design, production, and operation stages. It is necessary to establish and implement an appropriate components and parts of life cycle management plan. In this research, we analyzed the effectiveness of parts obsolescence management through cost avoidance and total life cycle cost that can be reduced through proper parts obsolescence management.