The current electrical safety plan developed for the national electricity system has been playing an important role in handling a variety of electrical accidents. However, it can be more effective to prevent or reduce those accidents if a preventive electrical safety plan is available. In this paper, an approach to developing the safety plan is described. We first discuss the contents that should be included in the plan. Noting that an effective plan requires the system level consideration of all the factors affecting the safety issues, an operation concept document (OCD) is considered. The OCD can allow us to understand the behavior of the safety system based on the operation environment, the system functions, the performance requirements, all at the system level of the safety system. Thus, the OCD can be useful in developing the safety plan. A detailed description then follows on how the OCD is developed for the electrical safety system under study. Finally, we discuss how the developed OCD can be used in deriving the preventive electrical safety plan.
A certain amount of random vibration excitation to subway track is caused by subway operation. This excitation is transmitted through track foundation, tunnel, soil medium, and ground building to the ground and ground structure, causing vibration. The vibration affects ground building. In this study, the results of ANSYS numerical simulation was used to establish back-propagation (BP) neural network model. Moreover, a back-propagation neural network model consisting of five input neurons, one hidden layer, 11 hidden-layer neurons, and three output neurons was used to analyze and calculate the vertical Z-vibration level of New Capital's ground buildings of Qingdao Metro phase I Project (Line M3). The Z-vibration level under different working conditions was calculated from monolithic roadbed, steel-spring floating slab roadbed, and rubber-pad floating slab roadbed under the working condition of center point of 0-100 m. The steel-spring floating slab roadbed was used in the New Capital area to monitor the subway operation vibration in this area. Comparing the monitoring and prediction results, it was found that the prediction results have a good linear relationship with lower error. The research results have good reference and guiding significance for predicting vibration caused by subway operation.
Journal of the Korean Operations Research and Management Science Society
/
v.30
no.2
/
pp.143-156
/
2005
Facility location planning (FLP) problem is the strategic level planning in supply chain. The FLP is significantly affected by the operation time of each facility. In most of the FLP researches, operation time of facility has been treated as a fixed value. However, the operation time is not a static factor in real situations and the fixed operation time may lead unrealistic FLP. In this paper, a mixed integer programming (MIP) model is proposed for solving the 3-stage FLP problem and operation times are adjusted by the results from the simulation model and an iterative approach combining the analytic model and simulation model is proposed to obtain more realistic operation plans for FLP problems.
This paper presents a conceptual design for a plant-wide autonomous operation system that uses artificial intelligence techniques. The autonomous operation system has the power and ability to perform the control functions needed for the emergency operation of a nuclear power plant (NPP) with reduced operator intervention. This paper discusses the emergency operation and level of automation in an NPP and presents the design requirements for an autonomous emergency operation system (A-EOS). Then, an architecture that consists of several modules is proposed, with descriptions of the functions. Finally, this paper introduces a prototype of the suggested autonomous system that integrates the authors' previous works.
Journal of Korean Academy of Nursing Administration
/
v.20
no.1
/
pp.10-21
/
2014
Purpose: This study was done to identify determinants of registered nurse (RN) skill mix and staffing level focused on hospital characteristics. Methods: Data were obtained from health insurance claims data and hospital reporting system in the Health Insurance Review and Assessment Service (HIRA) for the year 2010. Data from 2,998 hospitals were analysed using t-test, ANOVA, Pearson correlation, and regression analysis. Results: The RN skill mix and staffing level were positively related to hospital size and the percentage of inpatients to total patients. RN skill mix and staffing level were statistically different across regions. Including nursing aides (NA), however, there was no difference in staffing levels across regions. Medically vulnerable regions, bed operation rate, and the number of patients per doctor were also related to RN skill mix and staffing level. Conclusion: The statically significant determinants of RN skill mix and staffing level included hospital size, region, bed operation rate, percentage of inpatients, doctor-patient ratio. Further study needs to be done to investigate factors including RN supply and wages.
Multi-functional weirs has been installed in four rivers are hydraulic structures across the river. The structures were divided into movable and fixed weirs. Hence, riverbed-level variation and sediment transport can be varied due to water gate operation. In this study, the long-term riverbed-level variation of Geum river basin due to water gate operation of multi-functional weirs was studied. Result of this study shows that the variation of thalweg elevation was greater than the variation of annual average riverbed elevation due to multi-functional weirs construction and water gate operation. Maximum riverbed degradation of thalweg elevation that occurred was 2.79m and riverbed aggradation was 1.90m. Maximum riverbed degradation of the annual average riverbed elevation that occurred was 2.16m and riverbed aggradation was 1.24m. Analysis result of flood stage by the variation of riverbed-level shows that flood stages were increased in majorities area. The maximum increase in the value of flood stage was 2.23m. For this reason, flood stages can be greater than the freeboard of the levees. Therefore, we should consider the water gate operation of multi-functional weirs when planning and managing sediment in the river. We are expecting to use the result of this study in river planning for river management and selecting the river regime.
From May 1, 1993 to May 31 1995, the authers studied retrospectively 211 patients who underwent cardiovascular operation with cardiopulmonary bypass(CPB). Because we were interested in new development of ARF(prevalence, mortality rate, and main risk factors), we performed a multivariate statistical analysis about data of patients with preoperative serum creatinine values of less than 1.5 mg/dL. Normal renal function before operation(serum creatinine level less than 1.5 mg/dL) was registered in 198(74%) patients. Of these, 27(14%) patients showed postoperative renal complication, including 20(10%) patients classified as renal dysfunction(serum creatinine level between 1.5 and 2.5 mg/dL) and 7(4%) patients as acute renal failure(serum creatinine level higher than 2.5 mg/dL). The mortality rate was 5.8% in normal patients, 5% in patients with renal dysfunction, and 43% when acute renal failure developed(p=0.036). Indeed, the renal impairment proved to be an independent predictor of mortality(odd ratio 2.52∼11.25), along with cardiovascular(odd ratio 4.20) and respiratory(odd ratio 2.18) complications. Multivariate analysis identified the following variables as independent risk factors for postoperative renal impairment : advanced age(odd ratio 1), need for emergency operation(odd ratio 3.78), low-output syndrome(odd ratio 3.66), respiratory complication(odd ratio 1.30), need for deep hypothermic circulatory arrest(odd ratio 1.4). The 13 patients(7%) with preoperative renal failure showed a significantly higher morbidity and mortality rate than those without renal complications before operation. We concluded that the likelihood of severe renal complications is resonably low in the patients undergoing cardiac operation without preexisting renal dysfunction, but associated mortality remains high. A prominant role of hemodynamic factor in the development of postoperative acute renal failure must be recognized during preoperative, intraoperative, and postoperative periods.
This study analyzes use and operation of silver ambulance with 110 patients who had used silver ambulance in Gwangju and Jeonnam regions from June of 2006 to June of 2007 and 53 paramedics who are involved directly in ambulance operation and the results of this analysis are as follows. 1. Users' health conditions, 69.1% of users answered as bad and 67.3% suffered from chronic diseases over 3 months and it was found that they used silver ambulance due to their bad health conditions. 2. Cronbach's alpha was 0.630 and family function index was generally reliable and solution was high as 1.60, but total points were low as 7.11 and it was considered that they had family troubles. 3. On the question of ambulance use, 44.5% answered they used it because it is free, 53.6% used it for appointed medical examination and treatment and 18.1% used it for emergency. 4. Degrees of satisfaction with ambulance and paramedics were 95.4% and 76.4% respectively and 80.0% of ambulance users answered ambulance arrived quickly within 15 min. 5. Correlation($x^2 $) between family or relative's residence and frequency of visits was 86.367 and its significance probability was 0.00 and it was found that it was significant in the level of 0.1%, but correlation($x^2 $) between visitors other than family or relatives and frequency of visits was 14.768 and its significance probability was 0.25 and it was found that it was not significant in the level of 5%. 6. Correlation($x^2 $) between transfer operation speed and mobilization time was found that it was not significant in the level of 5%. Correlation($x^2 $) between their own health condition purpose of ambulance use was 13.802 an 5.696 and its significance probability was 0.93 and it was found that it was not significant in the level of 1%, and it was considered because paramedics carried patients with safe operation.
The purpose of this study was to elucidate the effects of musical listening on anxiety in patients undergoing abdominal hysterectomy. On the basis of the research criterias, 46 patients were recruited from Kang-Nam St. Mary's Hospital in Seoul from October 1 to December 31, 1995. 20 patients of them were participated as the experimental group who received musical listening session with self-selected music tapes, while 26 patients as the control group who didn't receive that session. The musical listening sessions composed of 3 periods, the pre-operation evening, just before sleeping, the operation morning. There were no differences between two groups, in terms of age education, religion, the experience of operation, the perception of uterus, and the weight(%). The State-Trait Anxiety Inventory(STAI) was used to measure anxiety on all patients. And serum cortisol levels, fasting blood sugar levels, systolic and diastolic blood pressure were collected at the day before surgery and the operation day. The results were as follows : 1. There were no significant differences in State-Anxiety between the two groups. 2. The differences of serum cortisol level between the day before surgery and the operative day were significantly lower in experimental group than in control group(P=0.03). 3. The level of fasting blood sugar was significantly decreased in experimental group(P=0.01). 4. Systolic blood pressure level was significantly decreased in experimental group(P=0.02). While Diastolic blood pressure level was not significant between two groups. It is suggested imply that the musical listening during the perioperative period may alleviate the perioperative anxiety levels in patients undergoing abdominal hysterectomy.
Kang-Yeol Lee;Hye-Young Na;Seong-Mi Park;Sung-Jun Park;Gyoung-Jong Son
Journal of the Korean Society of Industry Convergence
/
v.26
no.5
/
pp.925-936
/
2023
Currently, due to the rapid increase in power demand and the increase in capacity of power converters, the capacity of electromagnetic contactors is also increasing, and the burden on SMPS for the power that can drive them is increasing. Although the initial starting operation current of an electromagnetic contactor is significantly larger than the holding current for maintaining contact, most electromagnetic contactors apply the same voltage as the initial starting operation. An electromagnetic contactor must continuously apply a holding current to maintain the contact point, and the larger the capacity, the larger the current must be applied. This paper proposes a two-level magnetic contactor drive that allows setting the initial starting operation current to fully attach the contact point of the magnetic contactor and the holding current to maintain subsequent operation. In addition, a low-cost drive topology of analog and digital methods was proposed for various field applications, and an algorithm based on the ripple of the excitation current was proposed to determine whether the magnetic contactor was opened or closed without using a separate contact point. The feasibility of the proposed method was proven through Psim simulation experiments.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.