• Title/Summary/Keyword: Operation planning

Search Result 1,846, Processing Time 0.036 seconds

A Study on the Development of Industrial Power Management System (수용가 전력관리시스템 개발 연구)

  • Moon, Young-Hwan;Seong, Ki-Chul;Yoon, Sang-Hyun;Kim, Eon-Chung
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.550-552
    • /
    • 1995
  • Real time informations from industrial power system in operation can be used for efficient energy conservation, optimal operation of electrical equipments, and expansion planning of apparatus. Requirements for energy conservation and supplied power quality in customers are increasing significantly because of their effects on the production cost and efficiency. Thus, the development of low cost power management system which can can operate in domestic power system properly is substantially requested. In this research, operation software for real time monitoring and control system in customer power system has been developed to achieve the above purposes. The development of the operating software and related technologies are expected to be applied successfully for reducing electricity cost, enhancing power quality, determining facility expansion planning, operating optimal power system, increasing production efficiency, and reducing maintenance cost.

  • PDF

A Study on the Optimal Planning for Dispersed Fuel Cell Generation Systems in Power Systems (전력계통에 있어서 분산형 연료전지 발전시스템의 최적 도입계획에 관한 연구)

  • Rho, Dae-Seok;Shim, Hun;Oh, Yong-Taek;Choi, Jae-Seok;Cha, Jun-Min
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.6
    • /
    • pp.265-274
    • /
    • 2001
  • Recently, the operation of power systems has become more difficult because the peak demand load is increasing continuously and the daily load factor is getting worse and worse. Also, the consideration of deregulation and global environment in electric power industry is required. In order to overcome those problems, a study on the planning and operation in power systems of dispersed generating sources such as fuel cell systems, photovoltaic systems and wind power systems, has been performed energetically. This paper presents a method for determining an optimal operation strategy of dispersed co-generating sources, especially fuel cell generation systems, considering thermal supply as well as electric power supply. In other words, the optimal operation of those sources can be determined easily by the principle of equal incremental fuel cost and the thermal merit of those sources can be also evaluated quantitatively through Kuhn-Tucker's optimal conditions. In additions, an priority method using the comparison of total cost at the peak load time interval is presented in order ot select the optimal locations of those sources. The validity of the proposed algorithms is demonstrated using a model system.

  • PDF

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

A Case Study on the District Standard Planning Applied to Single-Detached House Area of Eomsa District Dooma-Myun Nonsan in Chungnam Province (충남 논산 두마면 엄사지구 단독주택지에 적용된 지구단위계획실태조사연구)

  • Kim, Joon-Yeoul;Choi, Hyo-Seung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.3 no.3
    • /
    • pp.47-55
    • /
    • 2001
  • For several years by discussion and research, the designing plan and detail plans of year 2000 has been unified. By this result the District Standard Planning as well as the following existing town to control all sorts of living surrounding problems and to make a delightful arranged town are the purpose, which is carrying out all over the country. It is true that the expectation was high to the District Standard Planning. Because of this plan it could use and control the District special quality. Such as, it could rise the ability of beautiful sight and make a advisable town. But in this study the first preceding subject is a problem by the constructing work that the restriction and the standard application has been strong. So the District Standard Planning had many problems. And also by the problems here, as a immoderate volition and stiffen about the operation, the system and equipment lack about the environment improving work, problems with areas by the exciting plannings, the attitude of the executive agency that can't accept the inhabitants will. From these backgrounds we thought the research has not to be standardize in only newtown concept, but has to breath with the exciting towns and the rural areas that the District Planning has been applied. And to revive the special quality of the area and local government by a positive and logical research. Consequently in this study, we researched about the problems of architectures that had issues with the District Standard Planning of architectural part of operation guide which has been assisted form Single-Detached House in Eomsa District Dooma-Myun Nonsan which is located in Chungnam province.

  • PDF

A Virtual Manufacturing System the Integration of Process Planning and Scheduling (공정계획 및 일정계획 통합을 위한 가상 생산 시스템)

  • Park, Ji-Hyung;Yum, Ki-Won
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.1 s.94
    • /
    • pp.161-166
    • /
    • 1999
  • Virtual Manufacturing System(VMS) is a computer model that represents the precise and whole structure of manufacturing systems and simulates their physical and logical behavior in operation. In this paper, a real time simulation for the virtual factory is proposed to integrate a process planning with scheduling under distributed environments. In order to communicate the information under distributed environments, we use a server/client concept using socket program and internet.

  • PDF

A study on the transmission planning using OPF in CBP markets (CBP 시장에서 OPF를 활용한 송전설비계획에 관한 연구)

  • Han, Seok-Man;Kim, Kwang-Mo;Chung, Koo-Hyung;H.Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.412-413
    • /
    • 2006
  • This paper proposed the transmission planning mechanism in competitive power markets. This mechanism used Optimal Power Flow(OPF) to calculate operation cost and Contingency Constrained OPF(CC-OPF) to consider N-1 contingency outage. In addition, this algorithm deduced a yearly transmission planning using Dynamic Programming(DP).

  • PDF

A study on a transmission planning condisdering dispatch (급전계획을 반영한 송전설비계획에 관한 연구)

  • Han, Seok-Man;Chung, Koo-Hyung;Kang, Dong-Ju;Shin, Young-Gyun;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.174-176
    • /
    • 2005
  • The introduction of competition in the electricity market requires a new paradigm in the capacity planning. This paper presents a methodology on a transmission planning considering dispatch in the government view point. The proposed model is mixed integer programming that minimized operation and construction costs. The proposed idea is exorcised on a case study.

  • PDF

A Study on the Application of PDCA Cycle for Performance Management of Promotion Project for Local Industry (향토산업육성사업의 성과관리를 위한 PDCA Cycle의 적용)

  • Son, Eun-Il;Hoshino, Satoshi;Song, Jung-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.2
    • /
    • pp.139-148
    • /
    • 2013
  • This study verified for the necessity for the comprehensive analysis of outcomes resulting from the local industry promotion project in many respects. To analyze the operation planning for performance management of local industry promotion project, this study redesigns the so-called PDCA(Plan${\rightarrow}$Do${\rightarrow}$Check${\rightarrow}$Act) model which is also known as Deming Cycle and verifies some hypotheses. To accomplish study purposes, 169 response samples from 85 project groups which drive the local industry promotion project were verified using SPSS 12.0. The findings are as follows: First, there was a positive relationship between the planing phase and the implementation phase. Second, there was also a positive relationship between the implementation phase and completion of the project phase. Third, there was a positive relationship between the planing phase and completion of the project phase. Finally, the implementation phase was a partial mediator on the relationship between the planing phase and completion of the project phase. Based on these findings, the implications and the limitations of the research findings were discussed, and recommendations for future research were provided.

Development of Process Planning System for Cold Forging of Non-axisymmetric Parts (비축대칭 제품의 냉간단조 공정설계시스템의 개발)

  • 이봉규;권혁홍;조해용
    • Transactions of Materials Processing
    • /
    • v.11 no.5
    • /
    • pp.405-413
    • /
    • 2002
  • A process planning system for cold forging of non-axisymmetric parts of comparatively simple shape was developed in this study. Programs for the system have been written with Visual LISP in AutoCAD. Shape of the product must be drawn with the solid line and the hidden line, and with the plane and front view, as well. At the plane, the system recognizes the external shape of non-axisymmetric portions - the number of the sides of the regular polygons and the radii of circles inscribing and circumscribing the polygon. At the front view, the system cognizes the diameter of axisymmetric portions and the height of the primitive geometries such as polygon, cylinder, cone, concave, convex, etc. The system perceives that the list developed from the solid line must be formed by the operation of forward extrusion or upsetting, and that the list developed from the hidden line must be formed by the operation of backward extrusion. The system designs the intermediate geometries again by considering clearance between workpiece and die, and then finally the billet diameter, in reverse order from the finished product, on the basis of volume constancy and using the operations, the forming sequence, the number of operations and the intermediate geometries which were already designed. The design rules and knowledges for the system were extracted from the plasticity theories, handbook, relevant reference and empirical knowledge of field experts. Suitability of the process planning was analyzed using SuperForge of FVM simulation package. The results of analysis showed good formability.

A Study on the Process Design of Advanced Planning & Scheduling for Transformer Operation Improvement (변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구)

  • Hwang, Duk-Hyuong;Nam, Seung-Don;Cho, Young-Wook;Oh, Sun-Il;La, Seoung-Hun;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.159-166
    • /
    • 2012
  • As enterprises, based on the forecast of the customer's demand and collaboration with the suppliers, establish the integrated system directing supply, production, and distribution for the increase of productivity, Thus, this study intends to find the most urgent and critical factors for the improvement of the information system by externalizing factors affecting the operation of information system, suggest the process to improve the relevant functions of information system, and design the process. As a result of the analysis of the previous studies on the improvement of the information system, many studies were conducted on the improvement of ERP and SCM, yet there was no study conducted targeting about APS (Advanced Planning & Scheduling). Thus, this study chose APS as the subject for the design of the process for the improvement for the information system.