• 제목/요약/키워드: Operation planning

검색결과 1,835건 처리시간 0.028초

가공 안정성을 고려한 작업설계시스템의 개발 (Development of Operation Planning System Considering Machining Safety)

  • 박병태;서지한;김홍재;오영진
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 추계학술대회
    • /
    • pp.421-427
    • /
    • 2008
  • In manufacturing industry, cutting parameters have an influence on reducing the production cost and time and deciding the quality of a final product However, owing to governmental regulations and the change of owner's cognizance, the machining safety becomes important in those fields relatively. The paper presents an intelligent operation planning system considering machining safety for milling operations. The main issue of the system is to determine the cutting parameters in achieving a balanced consideration of productivity and worker's safety. The detailed algorithm and functions of the developed system is introduced and then discussed.

  • PDF

정밀농업을 위한 트랙터-작업기의 최적 경로계획 (Optimal Path Planning of a Tractor-implement for Precision Farming)

  • 정선옥;박우풍;장영창;여운영
    • Journal of Biosystems Engineering
    • /
    • 제24권4호
    • /
    • pp.301-308
    • /
    • 1999
  • Path planning for field operation of agricultural machinery is an indispensible part for precision farming or autonomous field operation. In this study, two algorithms (I, II) of generating a time-based shortest operation path were suggested to plan an optimal operation of an agricultural tractor-implement in a rectangular shaped field. The algorithms were based on modification of a minimum spanning tree algorithm, and applied for tractor-implement operations. the generated path was consisted of round operation and returning operation sections. The number of round operation was determined from the condition that a tractor can turn smoothly at headlands. The performance of the algorithms was evaluated by the calculation number for path generation and the total path length generated. Their stability was affected by the number of returning operation, but the algorithm II was considered to be more stable. In addition, the performances of the developed algorithms were compared with those of the conventional field operations at selected field sizes and shapes. The results showed that the algorithms could reduce field operation time greatly. For a 100m$\times$40m field, the reduced path length was 78m. The study also included an user interface program for implementing the algorithms and generating GPS coordinates that could be used in GIS softwares for precision farming.

  • PDF

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

COMS Normal Operation for Earth Observation Mission

  • Cho, Young-Min
    • 대한원격탐사학회지
    • /
    • 제29권3호
    • /
    • pp.337-349
    • /
    • 2013
  • Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service was launched onto Geostationary Earth Orbit on June 27, 2010 and it is currently under normal operation service on $128.2^{\circ}$ East of the geostationary orbit since April 2011. In order to perform the three missions, the COMS has 3 separate payloads, the meteorological imager (MI), the Geostationary Ocean Color Imager (GOCI), and the Ka-band antenna. The MI and GOCI perform the Earth observation mission of meteorological observation and ocean monitoring, respectively. For this Earth observation mission the COMS requires daily mission commands from the satellite control ground station and daily mission is affected by the satellite control activities. For this reason daily mission planning is required. The Earth observation mission operation of COMS is described in aspects of mission operation characteristics and mission planning for the normal operation services of meteorological observation and ocean monitoring. And the first one-year normal operation results after the In-Orbit-Test (IOT) are investigated through statistical approach to provide the achieved COMS normal operation status for the Earth observation mission.

Orbit Determination and Maneuver Planning for the KOMPSAT Spacecraft in Launch and Early Orbit Phase Operation

  • Lee, Byung-sun;Lee, Jeong-Sook;Won, Chang-Hee;Eun, Jong-Won;Lee, Ho-Jin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1999년도 제14차 학술회의논문집
    • /
    • pp.29-32
    • /
    • 1999
  • Korea Multi-Purpose SATellite(KOMPSAT) is scheduled to be launched by TAURUS launch vehicle in November, 1999. Tracking, Telemetry and Command(TT&C) operation and the flight dynamics support should be performed for the successful Launch and Early Orbit Phase(LEOP) operation. After the first contact of the KOMPSAT spacecraft, initial orbit determination using ground based tracking data should be performed for the acquisition of the orbit. Although the KOMPSAT is planned to be directly inserted into the Sun- synchronous orbit of 685 km altitude, the orbit maneuvers are required fur the correction of the launch vehicle dispersion. Flight dynamics support such as orbit determination and maneuver planning will be performed by using KOMPSAT Mission Analysis and Planning Subsystem(MAPS) in KOMPSAT Mission Control Element(MCE). The KOMPSAT MAPS have been jointly developed by Electronics and Telecommunications Research Institute(ETRI) and Hyundai Space & Aircraft Company(HYSA). The KOMPSAT MCE was installed in Korea Aerospace Research Institute(KARI) site for the KOMPSAT operation. In this paper, the orbit determination and maneuver planning are introduced and simulated for the KOMPSAT spacecraft in LEOP operation. Initial orbit determination using short arc tracking data and definitive orbit determination using multiple passes tracking data are performed. Orbit maneuvers for the altitude correction and inclination correction are planned for achieving the final mission orbit of the KOMPSAT.

  • PDF

효율적인 컨테이너 터미널 운영 계획 작성을 위한 통합 시스템 개발 (Development of Integrated Planning System for Efficient Container Terminal Operation)

  • 신재영;이채민
    • 지능정보연구
    • /
    • 제8권2호
    • /
    • pp.71-89
    • /
    • 2002
  • 본 논문에서는 컨테이너 터미널의 운영 계획들을 통합된 환경에서 수립할 수 있도록 지원하는 시스템 개발 사례를 소개한다. 과거 터미널 운영 계획이 선석, 장치장, 선적계획 등 단위 계획별로 계획 시스템이 따로 개발되었던 점을 보완하여 각 계획간의 연계 작업 및 재조작이 가능할 수 있도록 하나의 통합된 시스템으로 설계하고 구현하였다. 개발된 시스템은 통합 운영 계획 작성, 사용자 편의성을 고려한 Interface, 규칙에 의한 자동 계획 및 오류에 대한 경고, 계획 수정의 용이성 등을 특징으로 하고 있다.

  • PDF

동적 계획법을 이용한 냉방시스템 최적운전에 관한 연구 (A Study on Optimal Operation of Cooling System Using Dynamic Programing)

  • 유성연;한규현;이제묘;이일수
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1061-1064
    • /
    • 2009
  • The objective of this study is to find the optimal operational planning of the hybrid cooling system, which is combined by ice storage system and the absorption chiller. The optimization technique used in this study is dynamic programming. The objective function is summed cost during a day including charge and discharge periods of ice storage system and operation time of absorption chiller. Assuming that initially ice storage tank is stored fully and the cooling load is perfectly predicted for the operational planning. This method provides the most efficient and economic combination of equipment operational planning for cooling with respect to energy consumption cost.

  • PDF

공급사슬네트워크에서 시뮬레이션과 유전알고리즘을 이용한 통합생산분배계획에 대한 연구 (Study of Integrated Production-Distribution Planning Using Simulation and Genetic Algorithm in Supply Chain Network)

  • 임석진
    • 대한안전경영과학회지
    • /
    • 제22권4호
    • /
    • pp.65-74
    • /
    • 2020
  • Many of companies have made significant improvements for globalization and competitive business environment The supply chain management has received many attentions in the area of that business environment. The purpose of this study is to generate realistic production and distribution planning in the supply chain network. The planning model determines the best schedule using operation sequences and routing to deliver. To solve the problem a hybrid approach involving a genetic algorithm (GA) and computer simulation is proposed. This proposed approach is for: (1) selecting the best machine for each operation, (2) deciding the sequence of operation to product and route to deliver, and (3) minimizing the completion time for each order. This study developed mathematical model for production, distribution, production-distribution and proposed GA-Simulation solution procedure. The results of computational experiments for a simple example of the supply chain network are given and discussed to validate the proposed approach. It has been shown that the hybrid approach is powerful for complex production and distribution planning in the manufacturing supply chain network. The proposed approach can be used to generate realistic production and distribution planning considering stochastic natures in the actual supply chain and support decision making for companies.

비선형공정계획에서 가공순서 결정을 위한 시뮬레이티드 어닐링 알고리듬 (Simulated Annealing Algorithms for Operation Sequencing in Nonlinear Process Planning)

  • 이동호
    • 대한산업공학회지
    • /
    • 제27권3호
    • /
    • pp.315-327
    • /
    • 2001
  • This paper considers the problem of operation sequencing in nonlinear process planning, which is the problem of selecting and sequencing operations required to produce a part with the objective of minimizing the sum of operation processing costs and machine, setup and tool change costs. Main constraints are the precedence relations among operations. The problem can be decomposed into two subproblems: operation selection and operation sequencing. We suggest four simulated annealing algorithms, which solve the two subproblems iteratively until a good solution is obtained. Here, the operation selection problem can be solved using a shortest path algorithm. Application of the algorithms is illustrated using an example. Also, to show the performances of the suggested algorithms, computational experiments were done on randomly generated test problems and the results are reported. In particular, one of the suggested algorithms outperforms an existing simulated annealing algorithm.

  • PDF

효율적인 수력운용을 위한 알고리즘 및 프로그램 개발 (Algorithm and Program of Development for Effective Hydor Operation)

  • 장미해;이경제;윤갑구;민병운;강상희;최면송;전동훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.778-780
    • /
    • 1997
  • This study considers a hydro power energy operation management and planning problem in KEPCO power systems for efficient use of hydro resources. A database is developed to provide with a convenience to hydro Power operation management and Planning by studying of the hydro resourse characteristics of Korea. The data is obtained in the operation history from 7 years ago and by considering the hydro facility planning to 2010 year. Also a computer program is developed to decide the monthly required volume of water and the water level of a dam in the Han river using the database.

  • PDF