• Title/Summary/Keyword: Operation model

Search Result 7,355, Processing Time 0.034 seconds

A Numerical Modelling of Cogeneration Systems for the Short-Term Operation Strategy (열병합발전시스템의 단기운전계획을 위한 수리적 모델 수립에 고나한 연구)

  • 류승헌;이종범;김준현
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.5
    • /
    • pp.721-729
    • /
    • 1994
  • In this paper an optimization of the industrial congeneration system which have a thermal storage tank is proposed for the short-term operation strategy. Short-term operation costs of topping cycle and bottoming cycle are calculated by using the proosed model of a thermal storage tank. Simulation result of four cases are compared and analyzed each other.By these simulations which are similar to real operation circumstances. the validity of the proposed model is verified.

Short-term Operation Strategy of Cogeneration System with Auxiliary Equipments (다양한 보조설비를 가진 열병합발전시스템의 단기운전계획)

  • Lee, Jong-Bum;Jung, Chang-Ho;Lyu, Seung-heon
    • Proceedings of the KIEE Conference
    • /
    • 1994.11a
    • /
    • pp.24-26
    • /
    • 1994
  • This paper describes a numerical model for the short-term operation strategy of the cogeneration systems. Especially this paper considered various auxiliary equipments used for the effective operation of cogeneration system. Minimum daily operation costs of topping cycle are calculated by using LP. Simulation results of some cases are analyzed and compared each other. Through these simulations the validity of the proposed model considered various auxiliary equipments is verified.

  • PDF

Development of a gate Operation Model for Agricultural reservoirs (農業用 貯水池 水門 操作 模型 開發)

  • Chung, Sang-Ok
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.34 no.2
    • /
    • pp.40-48
    • /
    • 1992
  • A model using a linear programming technique was developed to operate gates for the optimum management of small of medium size agricultural reservoirs. To predict the inflow into the reservoirs the WASHMO model, which was a single event hydrology model, was modified and used. To test the applicability, the developed model was applied to two reservoirs located in Kyungpook province. The results showed that the model could be used for the optimum gate operation of the agricultural reservoirs.

  • PDF

Simulation of circulation in Estuarine Lake caused by Operation of Drainage gates (배수갑문 운영을 고려한 간척 하구호의 해수순환모의)

  • Park, Young-Jin;Eom, Myung-Chul;Kwun, Soon-Kuk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.313-317
    • /
    • 2005
  • This study aimed to estimate applicability of a model to simulate circulation in estuarine lake caused by operation of drainage gates. The model consists of 2D (depth-averaged) hydrodynamic models, Delft3D-FLOW model and operation model for drainage gates. The flow through drainage gates was calculated using weir formulae with discharge coefficient, 0.8. The simulations are performed under two conditions: uncontrolled condition and controlled by periods of two days. The results on simulation of the model showed that the water level in estuarine lake was tend to increase above mean sea level. Therefore it was proved that the calibration and verification were needed in order to applicate this model for Saemankeum area.

  • PDF

A new model based on Lomax distribution

  • Alshingiti, Arwa M.;Kayid, M.;Aldossary, H.
    • International Journal of Reliability and Applications
    • /
    • v.15 no.1
    • /
    • pp.65-76
    • /
    • 2014
  • In this article, a new model based on Lomax distribution is introduced. This new model is both useful and practical in areas such as economic, reliability and life testing. Some statistical properties of this model are presented including moments, hazard rate, reversed hazard rate, mean residual life and mean inactivity time functions, among others. It is also shown that the distributions of the new model are ordered with respect to the strongest likelihood ratio ordering. The method of moment and maximum likelihood estimation are used to estimates the unknown parameters. Simulation is utilized to calculate the unknown shape parameter and to study its properties. Finally, to illustrate the concepts, the appropriateness of the new model for real data sets are included.

  • PDF

Length-biased Rayleigh distribution: reliability analysis, estimation of the parameter, and applications

  • Kayid, M.;Alshingiti, Arwa M.;Aldossary, H.
    • International Journal of Reliability and Applications
    • /
    • v.14 no.1
    • /
    • pp.27-39
    • /
    • 2013
  • In this article, a new model based on the Rayleigh distribution is introduced. This model is useful and practical in physics, reliability, and life testing. The statistical and reliability properties of this model are presented, including moments, the hazard rate, the reversed hazard rate, and mean residual life functions, among others. In addition, it is shown that the distributions of the new model are ordered regarding the strongest likelihood ratio ordering. Four estimating methods, namely, method of moment, maximum likelihood method, Bayes estimation, and uniformly minimum variance unbiased, are used to estimate the parameters of this model. Simulation is used to calculate the estimates and to study their properties. Finally, the appropriateness of this model for real data sets is shown by using the chi-square goodness of fit test and the Kolmogorov-Smirnov statistic.

  • PDF

A Study on an Efficient Double-fleet Operation of the Korean High Speed Rail (한국 고속철도의 효율적 중련편성 운영방법에 대한 연구)

  • Oh, Seog-Moon;Sohn, Moo-Sung;Choi, In-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.742-750
    • /
    • 2007
  • This paper presents a mathematical model for a double-fleet operation in Korean high speed rail (HSR). KORAIL has a plan to launch new HSR units in 2010, which are composed of 10 railcars. The double-fleet operation assigns a single-unit or two-unit fleet to a segment, accommodating demand fluctuation. The proposed model assumes stochastic demand and uses chance-constrained constraints to assure a preset service level. It can be used in the tactical planning stage of the rail management as it includes several real-world conditions, such as the capacities of the infra-structures and operational procedures. In the solution approach, the expected revenue in the objective function is linearized by using expected marginal revenue, and the chance-constrained constraints are linearized by assuming that demands are normally distributed. Subsequently, the model can be solved by a mixed-integer linear programming solver fur small size problems. The test results of the model applied to Friday morning train schedules for one month sample data from KTX operation in 2004 shows that the proposed model could be utilized to determine the effectiveness of double-fleet operation, which could significantly increase the expected profit and seat utilization rates when properly maneuvered.

What are the benefits and challenges of multi-purpose dam operation modeling via deep learning : A case study of Seomjin River

  • Eun Mi Lee;Jong Hun Kam
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.246-246
    • /
    • 2023
  • Multi-purpose dams are operated accounting for both physical and socioeconomic factors. This study aims to evaluate the utility of a deep learning algorithm-based model for three multi-purpose dam operation (Seomjin River dam, Juam dam, and Juam Control dam) in Seomjin River. In this study, the Gated Recurrent Unit (GRU) algorithm is applied to predict hourly water level of the dam reservoirs over 2002-2021. The hyper-parameters are optimized by the Bayesian optimization algorithm to enhance the prediction skill of the GRU model. The GRU models are set by the following cases: single dam input - single dam output (S-S), multi-dam input - single dam output (M-S), and multi-dam input - multi-dam output (M-M). Results show that the S-S cases with the local dam information have the highest accuracy above 0.8 of NSE. Results from the M-S and M-M model cases confirm that upstream dam information can bring important information for downstream dam operation prediction. The S-S models are simulated with altered outflows (-40% to +40%) to generate the simulated water level of the dam reservoir as alternative dam operational scenarios. The alternative S-S model simulations show physically inconsistent results, indicating that our deep learning algorithm-based model is not explainable for multi-purpose dam operation patterns. To better understand this limitation, we further analyze the relationship between observed water level and outflow of each dam. Results show that complexity in outflow-water level relationship causes the limited predictability of the GRU algorithm-based model. This study highlights the importance of socioeconomic factors from hidden multi-purpose dam operation processes on not only physical processes-based modeling but also aritificial intelligence modeling.

  • PDF

Comparison of streamflow runoff model in Korea for applying to reservoir operation (저수지 운영을 위한 한국 하천 유출 모형의 비교)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.3
    • /
    • pp.513-524
    • /
    • 2011
  • To evaluate the applicability of inflow runoff model to reservoir operation in Korea, DAWAST model and TPHM model which are conceptual lumped daily runoff model and were developed in Korea, were selected and applied to simulate inflows to Daecheong multipurpose dam with watershed area of 4,134 $km^2$, and water storages in Geryong reservoir with watershed area of 15.1 $km^2$ and total water storage of 3.4 M $m^3$. Evaluating inflows on an yearly, monthly, ten-day, and daily basis, inflows by DAWAST model showed balanced scatters around equal value line. But inflow by TPHM model showed high in high flows. Annual mean water balance by DAWAST model was rainfall of 1,159.9 mm, evapotranspiration of 622.1 mm, and inflow of 644.6 mm, from which rainfall was 104.8 mm less than sum of evapotranspiration and inflow, and showed unbalanced result. Water balance by TPHM model showed satisfactory result. Reservoir water storages were shown to simulate on a considerable level from applying DAWAST and TPHM models to simulate inflows to Geryong reservoir. But it was concluded to be needed to improve DAWAST and TPHM model together from imbalance of water balance and low estimation in high flow.

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF