• 제목/요약/키워드: Operation Optimization

검색결과 1,430건 처리시간 0.026초

Study on the Structure Optimization and the Operation Scheme Design of a Double-Tube Once-Through Steam Generator

  • Wei, Xinyu;Wu, Shifa;Wang, Pengfei;Zhao, Fuyu
    • Nuclear Engineering and Technology
    • /
    • 제48권4호
    • /
    • pp.1022-1035
    • /
    • 2016
  • A double-tube once-through steam generator (DOTSG) consisting of an outer straight tube and an inner helical tube is studied in this work. First, the structure of the DOTSG is optimized by considering two different objective functions. The tube length and the total pressure drop are considered as the first and second objective functions, respectively. Because the DOTSG is divided into the subcooled, boiling, and superheated sections according to the different secondary fluid states, the pitches in the three sections are defined as the optimization variables. A multi-objective optimization model is established and solved by particle swarm optimization. The optimization pitch is small in the subcooled region and superheated region, and large in the boiling region. Considering the availability of the optimum structure at power levels below 100% full power, we propose a new operating scheme that can fix the boundaries between the three heat-transfer sections. The operation scheme is proposed on the basis of data for full power, and the operation parameters are calculated at low power level. The primary inlet and outlet temperatures, as well as flow rate and secondary outlet temperature are changed according to the operation procedure.

Operation optimization of auxiliary electric boiler system in HTR-PM nuclear power plant

  • Du, Xingxuan;Ma, Xiaolong;Liu, Junfeng;Wu, Shifa;Wang, Pengfei
    • Nuclear Engineering and Technology
    • /
    • 제54권8호
    • /
    • pp.2840-2851
    • /
    • 2022
  • Electric boilers (EBs) are the backup steam source for the auxiliary steam system of high-temperature gas-cooled reactor nuclear power plants. When the plant is in normal operations, the EB is always in hot standby status. However, the current hot standby operation strategy has problems of slow response, high power consumption, and long operation time. To solve these problems, this study focuses on the optimization of hot standby operations for the EB system. First, mathematical models of an electrode immersion EB and its accompanying deaerator were established. Then, a control simulation platform of the EB system was developed in MATLAB/Simulink implementing the established mathematical models and corresponding control systems. Finally, two optimization strategies for the EB hot standby operation were proposed, followed by dynamic simulations of the EB system transient from hot standby to normal operations. The results indicate that the proposed optimization strategies can significantly speed up the transient response of the EB system from hot standby to normal operations and reduce the power consumption in hot standby operations, improving the dynamic performance and economy of the system.

분할법을 이용한 최적 무효전력 설비계획 (Optimal Reactive Power Planning Using Decomposition Method)

  • 김정부;정동원;김건중;박영문
    • 대한전기학회논문지
    • /
    • 제38권8호
    • /
    • pp.585-592
    • /
    • 1989
  • This paper presents an efficient algorithm for the reactive planning of transmission network under normal operating conditions. The optimal operation of a power system is a prerequisite to obtain the optimal investment planning. The operation problem is decomposed into a P-optimization module and a Q-optimization module, but both modules use the same objective function of generation cost. In the investment problem, a new variable decomposition technique is adopted which can operate the operation and the investment variables. The optimization problem is solved by using the gradient projection method (GPM).

  • PDF

Analysis and Improvement of the Bacterial Foraging Optimization Algorithm

  • Li, Jun;Dang, Jianwu;Bu, Feng;Wang, Jiansheng
    • Journal of Computing Science and Engineering
    • /
    • 제8권1호
    • /
    • pp.1-10
    • /
    • 2014
  • The Bacterial Foraging Optimization Algorithm is a swarm intelligence optimization algorithm. This paper first analyzes the chemotaxis, as well as elimination and dispersal operation, based on the basic Bacterial Foraging Optimization Algorithm. The elimination and dispersal operation makes a bacterium which has found or nearly found an optimal position escape away from that position, which greatly affects the convergence speed of the algorithm. In order to avoid this escape, the sphere of action of the elimination and dispersal operation can be altered in accordance with the generations of evolution. Secondly, we put forward an algorithm of an adaptive adjustment of step length we called improved bacterial foraging optimization (IBFO) after making a detailed analysis of the impacts of the step length on the efficiency and accuracy of the algorithm, based on chemotaxis operation. The classic test functions show that the convergence speed and accuracy of the IBFO algorithm is much better than the original algorithm.

마이크로그리드의 효율적 운영을 위한 최적화기법의 응용 (An Application of Optimization method for Efficient Operation of Micro Grid)

  • 김규호
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.50-55
    • /
    • 2012
  • This paper presents an application of optimization method for efficient operation in micro grid. For operational efficiency, the objective function in a diesel generator consists of the fuel cost function similar to the cost functions used for the conventional fossil-fuel generating plants. The wind turbine generator is modeled by the characteristics of variable output. The cost function of fuel cell plant considers the efficiency of fuel cell. Particle swarm optimization(PSO) and sequential quadratic programming(SQP) are used for solving the problem of microgrid system operation. Also, from the results this paper presents the way to attend power markets which can buy and sell power from upper lever grids by connecting a various generation resources to micro grid.

독립운전 시나리오를 고려한 마이크로그리드의 최적 발전기 기동정지 계획 (Unit Commitment of a Microgrid Considering Islanded Operation Scenarios)

  • 이시영
    • 전기학회논문지
    • /
    • 제67권6호
    • /
    • pp.708-714
    • /
    • 2018
  • Islanded operation of a microgrid can ensure the reliable operation of the system when a large accident occurs in the main grid. However, because the generation capability of a microgrid is typically limited, a microgrid operator should take islanded operation risk into account in scheduling its generation resources. To address this problem, in this paper we have proposed two unit commitment formulations based on the islanding scenario that reflect the expected and worst-case values of the islanded operation risk. An optimal resource scheduling strategy is obtained for the microgrid operator by solving these optimization problem, and the effectiveness of the proposed method is investigated by numerical simulations.

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

초음속 비행체의 궤적최적화와 연구응용 방향 (Trajectory Optimization of Supersonic vehicle and its Application)

  • 박정우;성홍계;탁민제
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2009년도 춘계학술대회 논문집
    • /
    • pp.411-413
    • /
    • 2009
  • 본 논문은 초음속 추진을 이용한 미사일 시스템에 대한 궤적최적화에 대한 연구를 소개한다. 초음속 추진 시스템은 외부비행조건과 내부 연소 환경에 따른 복잡하고 비선형성이 강한 추력특성을 가진다. 이러한 이유로 초음속 비행체의 운용에 있어 많은 구속조건을 가지며 일반 비행체보다 좁은 비행영역안에서 운용되어야 한다. 본 논문에서는 이러한 특성을 가지는 초음속 비행체의 궤적최적화를 수행하고 보다 효율적인 운용에 대한 비전을 제시하고자 한다. 궤적최적화는 일반적인 초음속 추진에 관련한 구속조건들을 고려하며 수행되었고, 궤적최적화 결과를 통해 얻어진 효율적 연료공급 및 노즐 목 면적 제어에 대한 일반적인 운용 및 응용방안에 대해서 고찰하고자 한다.

  • PDF

경제급전문제의 통합운영에 관한 경제적 이득 분석 (Economic Profit Analysis for Centralized Operation of Economic Load Dispatch Problem)

  • 이상운
    • 한국인터넷방송통신학회논문지
    • /
    • 제16권2호
    • /
    • pp.181-188
    • /
    • 2016
  • 본 논문은 경제급전 최적화 문제에 개별 발전회사별로 독립적으로 경제급전을 수행하는 방법에 비해 중앙에서 통합하여 경제급전 최적화를 수행하는 경우가 보다 경제적임을 보였다. 이 경우에 적용된 알고리즘으로 밸브지점으로 발전량을 조절하는 균형방법을 수행한 후 발전량을 감소시킬 때의 비용 감소분과 증가시킬 때의 비용 증가분 차이로 발전량을 상호 교환하는 방법으로 최적화를 수행하였다. 10대, 13대과 40대-발전기를 독립적으로 운영하는 경우와 통합된 63대-발전기를 경제급전하는 경우를 비교한 결과 통합운영 방법이 독립적 경제급전에 비해 발전비용을 획기적으로 감소시켜 경제적인 이익을 극대화 시킬 수 있음을 보였다.

인더스트리얼 캐리어를 위한 선대운영의 최적화에 관한 연구 (A Study on the Optimization of Fleet Operation for Industrial Carriers)

  • 김시화;곽민석
    • 한국항해학회지
    • /
    • 제22권4호
    • /
    • pp.1-14
    • /
    • 1998
  • There are three basic modes of operation of ships: liner, tramp and industrial operations. Industrial operations, where the owner of the cargo, i.e. the industrial carrier controls the ships, abound in the shipment of bulk commodities, such as oil, chemicals and ores. Industrial carriers strive to minimize the shipping cost of their cargoes. This paper is concerned with the operational optimization problem of a fleet owned by major international oil company. The major oil company is a holding corporation for a group of oil producing, transporting, refining, and marketing companies located in various countries throughout the world. The operational optimization problem of the fleet is divided into two-phases. The front end corresponds to the optimization of transporting crude oil, product mix, and the distribution of product oil to meet market demand. The back end tackles the operational optimization problem of the fleet to meet the transportation demand derived from the front end. A case study is carried out with the H major oil company problem composed by reflecting the practices of an international major oil company. The results are summarized and examined in the point of optimization for the total operation of the H major oil company and the operational optimization problem of the fleet. The paper concludes with the remark that the results of the study might be useful and applicable in practices of these related decision problems.

  • PDF