This paper describes the development of real-time irrigation reservoir operation models that adequately allocate available water resources for paddy rice irrigation. Water requirement deficiency index(WRDI) was proposed as a guide to evaluate the operational performance of release schemes by comparing accumulated differences between daily release requirements for irrigated areas and actual release amounts. Seven reservoir release rules were developed, which are constant release rate method (CRR), mean storage curve method(MSC), frequency analysis method of reservoir storage rate(FAS), storage requirement curve method(SRC), constant optimal storage rate method (COS), ten-day optimal storage rate method(TOS), and release optimization method(ROM). Long-term forecasting reservoir operation model(LFROM) was formulated to find an optimal release scheme which minimizes WRDIs with long-term weather generation. Rainfall sequences, rainfall amount, and evaporation amount throughout the growing season were to be forecasted and the results used as an input for the model. And short-term forecasting reservoir operation model(SFROM) was developed to find an optimal release scheme which minimizes WRDIs with short-term weather forecasts. The model uses rainfall sequences forecasted by the weather service, and uses rainfall and evaporation amounts generated according to rainfall sequences.
본 연구에서는 공공자전거 운영시스템을 도입하기 위해 국내외 사례조사와 대상지역인 나주시(NaJu City)의 현지조사를 통해 운영시스템 적용 방법에 대한 사례연구를 진행하였다. 1차 조사에서는 국내외 공공자전거 시스템 적용사례를 분석하여 이용시간, 도난과 파손 위험 등의 문제점을 조사하였다. 2차 조사에서는 공공자전거 시스템 도입 예정 지역인 나주시(NaJu City)의 조사결과 시민과 관광객이 쉽게 이용할 수 있는 운영시스템의 도입이 필요한 것으로 조사되었다. 3차 조사에서는 1, 2차 조사결과를 바탕으로 프랑스 밸리브(Velib) 시스템의 문제점을 해결할 수 있는 모바일 대여/반납 프로세스와 시스템 운영절차, 통신절차의 모듈을 정리하였다. 또한, 1차 조사와 2차 조사에서 나타난 문제점인 이용방법과 민원처리 방안에 대해서도 정리하였다. 위와 같이 본 연구에서는 국내외 사례조사, 현지조사, 그리고 대여/반납 프로그램의 모듈 개발을 통해 공공자전거의 운영시스템 도입 방법을 연구하였으며 현재 나주시에서 운영시스템이 시범운행 중에 있다. 따라서 앞으로 시험운행 결과를 종합하여 좀 더 효율적인 운영시스템이 도입될 수 있도록 연구를 진행하겠다.
In this paper, parallel control method that enables coordinating operations of multiple mini ice storage air conditioner is proposed based on LonWorks system. The proposed parallel control method is a kind of master/slave control method based on LonTalk network communication. In the control method, master controller leading whole system operations is determined by date to avoid the disproportion of outdoor unit operations. In addition to the above, duty shift control method is proposed to avoid redundant operations of outdoor units and to equalize the operation frequencies of them. Through some simulation tests, the proposed parallel control method and the duty shift control method are evaluated and the efficiencies of them are validated by comparing with existing methods.
Ground source heat pump (GSHP) systems are actively introduced as cooling and heating conditioning systems of buildings due to annual stable performance and easily maintenance. However, ground temperature imbalance is occurred when the GSHP is used for a long period. Therefore, in this study, we proposed the operation method of the system that considered the recovery time of heat source temperature. The entering water temperature (EWT) and heat exchange rate (HER) were comparatively analyzed according to the continuous and intermittent operation. Furthermore, the underground thermal environment was evaluated by numerical analysis model. As the result, the intermittent operation was a maximum of 12.3% higher HER during the heating period than the continuous operation. In addition, the overall ground heat source temperature at the intermittent operation was higher than it at the continuous operation.
In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)
This study shows the following results. First, the assessment items of the whole exhibition operation, workforce, counselor's ability, facility and environment were important analysis factors for exhibition recognition, quality of human operation and quality of exhibition facility and environment. Second, exhibition recognition was found to be the most significant factor that influenced exhibitor's cognitive achievement, exhibition employee operation and exhibition facility. Third, exhibitors' satisfaction simultaneously increased as exhibition recognition and employee operation quality were raised. However, exhibition facility didn't strongly influence exhibitors' satisfaction. Fourth, high exhibition recognition, employee operation and exhibition facility resulted in high cognitive achievement and exhibitor's loyalty. Fifth, exhibition recognition is a highly influential factor to mediate exhibitor's cognitive achievement and exhibitors' loyalty. It implied that exhibitors' cognitive achievement and satisfaction were significantly related to the exhibition quality factor. Moreover, it indicated the effective and efficient operational method to strengthen promotional strategy, enhance the quality of employee operation, exhibition facility and environment. Thus, the results suggest a new method to evaluate exhibitor's satisfaction in the exhibition industry.
This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.
The national subway went under construction in 1971, and after three years of endeavor, Seoul subway line number one opened for traffic in 1974. Line number two went under construction in 1978 and it opened for traffic in 1984. With the use of safety operation for more than 20 years, the life cycle nearly came to an end. Therefore the improvements for the safety operation are unavoidable. The total system should not be affected when the new and conventional systems are overlapped, the system operation is in the initial stage, and it confronts the situation of abnormal operation. However, there is a total lack of experience in construction and improvement for the trains that are in the use of large transport and density headway. In this paper, we propose an improvement method of the subway signalling system using ATO (Automatic Train Operation control scheme) to which the latest Digital ATC is applied, and examine the first application model of ATO system.
Task based modeling is essential in a construction operation simulation modeling. It allows dealing with local variables or delay factors that affect productivity and improves the reusability of existing operation models. An operation model can secure reality only if it reflects the real construction processes by effectively dealing with zoning issue. However, system users have some difficulties in modeling a construction operation that is consisted of several processes having different production units. Zoning is a major modeling issue when the task based modeling method is implemented using the existing discrete event simulation systems. This paper highlights the difficulty and presents a new method that complements the zoning issues attributed to different production units. The method is described in detail by presenting the flow of entities. It is confirmed that the zoning method effectively deals with the unbalance of production units between processes and facilitates to model an operation model having processes with different production units. The "Zoning module" contributes to increasing accuracy of simulation result.
Operating wind turbine generators at maximum power point requires maximum power point tracking (MPPT) control methods. However, conventional methods cannot track the appropriate maximum power point in situations involving wind turbine systems based on a series operation strategy. These systems comprise one or more local maximum power points, and conventional methods can detect only one local maximum power point closed by a current operation point. This study proposes an advanced MPPT method for the series operation strategy of a small, grid-connected wind turbine system. In determining the appropriate maximum point, operations at certain local maximum power points are analyzed. The results show one appropriate point, which is tracked by the proposed MPPT method. The effectiveness of the proposed method is verified by the experimental results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.