The noise and vibration generated by the subway rolling stocks operated along the Seoul Subway Line No.1, 2, 3, and 4 lead to a controversy of pollution problem especially in residential areas. However, there is no data or guide to define the damage or provide adequate protection against such pollutions. The field measurements were made to characterize the noise attenuation due to distance, noise level distribution around the subway track of the aboveground and underground parts of each Line. The assessment criteria and methods are considered in addition to the practical available noise control methods. The noise level measured at Line No. 1 and 3 are less than 60 dB(A) with no pollution problem. Only a part of the aboveground section of Line No.2 and 4 indicates severe noise pollution. The effective boundary of these areas exposed to 70dB (A) noise are within 50m from the track centerline of No.2 line and 25m of No.4 line. The residents file a strong complaints whenever the noise level exceeds the 80dB (A) , and an occasional complaints between 70 to 80 dB(A). The distribution of high level noise of 80 dB(A) occurs within 25m from the track centerline of the overbridge, 12.5m of the short steel bridge, and about loom of the long steel bridge such as Dangsan Bridge. The intermediate noise level of 70 to 80 dB(A) is recorded within 50m from the overbridge, U-type retaining structure, and short steel structure, and 280m from the long steel bridge. The results presented in this paper can be used to understand the characteristics of the noise pollution along the Seoul Subway now In operation, and used as a guide to improve the existing noise pollution problems.
Numerous researches related to internet shopping malls have been researched by numerous researchers. Such as, establishing criteria to evaluate service quality of electronic commerce, identifying factors affecting successful internet shopping mall operation, and examining relationships among the factors in electronic commerce based shopping mall needed to be focused on. However, most researches that have been undertaken only consider the service quality model or basic functional dimension. In accordance with this indispensability, the integrated structural relationship among variables, which are potentially inherent in customer's perception and affect personnel royalty on internet shopping mall needs to be acknowledged. The purpose of this study is to examine which factors should be able to facilitate performance of internet shopping mall. Based on the relevant literature, it has been empirically analyzed how corporate image, system quality, service quality and delivery quality affect customer satisfaction as well as customer royalty. The research's problem is that it was tested with data collected from 212 respondents. This study developed and empirically analyzed a model representing the relationship by using the Structural Equation Model. The major findings of this study are, firstly, that the higher corporate image is positively affecting the system quality and delivery quality. Secondly, the higher delivery quality is positively affecting the service quality. Thirdly, the higher service quality is positively affecting the customer satisfaction. Finally, the higher customer satisfaction is affecting the customer royalty.
We conducted a quantitative human health risk assessment with respect to inhalation of heavy metals for residents of housing developments in "new towns" where an incinerator will be operated within the area scheduled for construction thereof. To assess potential human health risk we calculated the amount of heavy metals emitted from the incinerator, and then forecasted the potential health impact on adjoining areas where new housing is to be developed (i.e. "new towns") at different altitudes by a using SCREEN-3 model. We assessed Cancer Risk (CR) caused by known carcinogens using the Inhalation Unit Risk criteria developed by the US Environmental Protection Agency. Notably, we assessed risk by determining concentrations of heavy metals on a floor by floor basis, as apartment buildings are to be constructed near the incinerator according to a pre-devised plan. Results indicated that cancer risk for most carcinogens exceeded US EPA standards for the highest locations at each collection point. This result indicates that construction of high buildings in areas adjoining incinerators is undesirable, and that measures to lower carcinogens are needed. The results of this study, which assessed health risk from exposure to heavy metals emitted from a nearby incinerator, can be useful in land use planning with respect to the location of housing developments in new towns, as well as the heights of any buildings constructed. Furthermore, the methodology deployed herein with respect to risk assessment can be helpful for policy makers and the general public in the event of conflicts regarding incinerator projects in the future. The results herein may also be of merit in determining priorities when establishing harm reduction measures for carcinogens at incinerators. However, the study does contain several limitations. The SCREEN-3 model, a kind of screening model that provides conservative results, can provide higher forecasted concentrations of air pollutants than other models. Moreover, although the incinerator in question is set to be a thermoselect type, domestic data for emissions from these incinerators is not available, and assumptions were based on a stoker type incinerator. Insufficient domestic data likewise compelled the use of data of USA, resulting in possible errors in results. Continued research will thus be required to develop systematic methodologies that address the foregoing factors and produce more reliable outcomes.
We r viewed a policy of primary surgical closure of large ventricular septal defects in small infants. Sixty-three infants met criteria for inclusion in the study, and were divided into two groups based on age: group 1 infants aged less than 5 months(n = 31), and group 2 infants aged 5 months or more(n = 32). Both groups had similar variation in ventricular septal defect location(paramembranous versus muscular), and showed no significant difference in left to right shunt and in ratio of systemic and pulmonary vascualr resistance. Three early deaths(9.7%) occurred in group 1, but no death(0%) in group 2. The causes of death were preoperative cardiac arrest and cerebral injury followed by postoperative respiratory insufficiency in two patients, and preoperative tracheomalacia followed by laryngeal edema and respiratory arrest in one Two patients in group 1 showed postoperative low cardiac output syndrome(6.5% in group 1 versus 0% in group 2). There was no late death during the follow-up per od in both groups. No surviving patients had postoperative patch leakage, or required a second operation. These results indicate that primary surgical closure of large ventricular septal defects, if logical perioperative care is accompanied, can be saefly performed in small infants aged less than 5 months with low postoperative mortality or morbidity rates.
Objective : Traumatic disc lesion is a lesion with tremendous controversies. The causal relationships of this lesion are not established along with pathogenesis, diagnostic criteria, methods of treatment and the outcome. However, a significant number of patients with back pain after a trauma underwent spinal operations under the diagnosis of traumatic disc lesions. Such an ill-directed operation eventually produce a person with an iatrogenic disability. We present two illustrative cases, and tried to make a preventive method. Methods : We examined the path from mild trauma after a road traffic accident into the iatrogenic disability in two illustrative cases, who requested disability assessment and medical appraisement. We evaluated the reason and background for such an unwanted outcome and tried to find a method to reduce or prevent it by a literature review. Results : These two patients were admitted to the hospital with the diagnosis of lumbar sprain after a road traffic accidents. They eventually underwent spinal surgery under another diagnosis such as traumatic disc herniation or internal disc disruption. They stayed at the hospital for more than six months and finally lost their jobs. They became the disabled at last. Although they complained back pain, they never insisted by themselves that their symptoms were due to the traumatic disc lesion. To prevent such an iatrogenic disability, the doctors should assist them to go-back to the workplace promptly instead of a reckless extension of the treatment period. It may be necessary to evaluate the certificates to extend the treatment period with an additional diagnosis by a medical expert. To reduce the unnecessary long-term admission, a new billing system such as a partial share for the high cost of the treatment by the patients may be needed. Conclusion : It is not the patient but the doctors, who has the responsibility to avoid the unnecessary operations. All treating doctors should try to reduce or prevent such an iatrogenic complication caused by ourselves before we are forced to do so.
Objective : Massive intracerebral hemorrhage (ICH) and major infarction (MI) are devastating cerebral vascular diseases. Decompression craniectomy (DC) is a common treatment approach for these diseases and acceptable clinical results have been reported. Author experienced the postoperative intracranaial pressure (ICP) trend is somewhat different between the ICH and MI patients. In this study, we compare the ICP trend following DC and evaluate the clinical significance. Methods : One hundred forty-three patients who underwent DC following massive ICH (81 cases) or MI (62 cases) were analyzed retrospectively. The mean age was $56.3{\pm}14.3$ (median=57, male : female=89 : 54). DC was applied using consistent criteria in both diseases patients; Glasgow coma scale (GCS) score less than 8 and a midline shift more than 6 mm on brain computed tomography. In all patients, ventricular puncture was done before the DC and ICP trends were monitored during and after the surgery. Outcome comparisons included the ictus to operation time (OP-time), postoperative ICP trend, favorable outcomes and mortality. Results : Initial GCS (p=0.364) and initial ventricular ICP (p=0.783) were similar among the ICH and MI patients. The postoperative ICP of ICH patients were drop rapidly and maintained within physiological range if greater than 80% of the hematoma was removed. While in MI patients, the postoperative ICP were not drop rapidly and maintained above the physiologic range (MI=18.8 vs. ICH=13.6 mmHg, p=0.000). The OP-times were faster in ICH patients (ICH=7.3 vs. MI=40.9 hours, p=0.000) and the mortality rate was higher in MI patients (MI=37.1% vs. ICH=17.3%, p=0.007). Conclusion : The results of this study suggest that if greater than 80% of the hematoma was removed in ICH patients, the postoperative ICP rarely over the physiologic range. But in MI patients, the postoperative ICP was above the physiologic range for several days after the DC. Authors propose that DC is no need for the massive ICH patient if a significant portion of their hematoma is removed. But DC might be essential to improve the MI patients' outcome and timely treatment decision.
Journal of Korean Society of Disaster and Security
/
v.7
no.2
/
pp.17-24
/
2014
Recently, many accidents occur frequently because sprinklers aren't installed or don't work right when there are outbreak of fire in houses and aggregate buildings. Therefore, they can result in damage for humans and loss of property. Sprinklers are the most appropriate which can extinguish buildings' fire in the initial stages. Through lack of legal system, in domestic cases, sprinklers cannot operate their inherent performance. Domestic standard simply classifies installation objects according to types of business and forms of buildings, also divides into uses and floors of buildings. Especially it only regulates that sprinklers must be installed every floors in particular fire buildings that have more than eleven floors. While it doesn't need to install sprinklers below ten floors, so we are threatened the safety. In this study, we derived causes and implications by analyzing concepts of sprinklers facilities, installation standards in domestic and foreign legal system, and recent cases that expanded damages in fire accidents because of weak point of installation and control standards. In domestic cases, as a result, government has to provide an institutional strategy and law that regulate duty to install sprinklers to all aggregate buildings regardless of floors in terms of new buildings. Also, if someone who has existing buildings wanted to install them, government would guarantee subsidy to encourage installation. In addition, government supervises fire-fighting activities when there are fire by compensating standards about regular inspection by a qualified technician, operation and maintenance of sprinklers as well as reinforcement of administrative criteria.
Cho Eun-Chol;Sub Jin-Hak;Chung Woong-Yun;Kim Ho-Geun;Park Cheong-Soo
Korean Journal of Head & Neck Oncology
/
v.17
no.2
/
pp.205-209
/
2001
Purpose: Most cases of primary hyperparathyroidism are due to parathyroid adenoma or parathyroid hyperplasia. Parathyroid carcinoma is a very rare cause of hyperparathyroidism. Although the diagnosis of parathyroid carcinoma is usually established by pathologic criteria especially of vascular or capsular invasion, some clinical and biochemical features differentiate it from benign forms of hyperparathyroidism. We under-took a retrospective study in 6 patients with parathyroid carcinoma, with the aim of conveying experience from management for this rare cause of hyperparathyroidism. Methods: Clinical symptoms, biochemical laboratory, radiologic, and intraoperative findings, local recurrence and distant metastasis were analyzed in 6 patients diagnosed pathologically as a parathyroid carcinoma after operation from 1992 to 2001. Results: Mean age was 50.2 years (33.0-60.0 years) and male to female ratio was 1:1. Neck mass was found in 5 patients, multiple bone pain in 3 patients and renal stone in 1 patient. One case has suffered from chronic renal failure for 19 years. Although preoperative laboratory evaluations showed the aspects of hyperparathyroidism in all cases, mean serum calcium level was 11.2mg/dl(10.5-12.1mg/dl), slightly elevated. Laboratory values after surgery were within the normal range in 5 cases. However, in one case with chronic renal failure, serum PTH levels, serially checked, were above the normal range. Any of imaging methods failed to suggest a parathyroid carcinoma preoperatively. Parathyroid adenoma was suspected in 3 cases, thyroid cancer in the other cases before surgery. The extent of resection was radical resection of parathyroid lesion with more than unilateral thyroid lobectomy and central compartment neck node dissection and in 2 cases, the resection of recurrent laryngeal nerve or strap muscles was added. During follow-up period, any local or systemic recurrence were not evident in all the cases. Conclusion: Although parathyroid carcinoma is a rare disease and its preoperative diagnosis, in our experience, could not easily be made, the understanding of characteristic clinical and biochemical feature could help diagnosis at first surgery. Radical resection without remaining residual tumor is most important for the management of the parathyroid cancer.
Park, Young Min;Kim, Sung Hoon;Noh, Sang Wan;Kim, Sung Jin
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.5
/
pp.47-53
/
2020
The purpose of this study was to increase product reliability by improving the durability of the breech block for a 30mm Automatic Gun. The breech block is a key component of a gun that functions as chambering, closing, and extracting. The breech block requires high reliability, which needs to be improved because cracks of a breech block can occur early in operation. Cause analysis confirmed that the crack is caused by repeated impacts. Therefore, the following improvement measures were studied, and the effects were demonstrated using a firing test. The energy of impact absorption was increased by changing the material, and the stress concentration was mitigated by increasing the value of R. In addition, the fatigue life was increased by adding Shot-peening, deleting chromium plating, and changing the forging method. The firing test did not show firing trouble for up to 5,000 rounds. The start timing of the crack was delayed, and the depth was small. Therefore, the improved product was more durable than the existing product. This study can be used as a useful reference when assessing the improvement of the durability of similar products, life study, and criteria for crack acceptance.
Journal of the Korean Society of Marine Environment & Safety
/
v.23
no.5
/
pp.462-472
/
2017
Sunken vessels on major fairways can cause many problems in terms of maritime safety and the marine environment. In order to prevent secondary marine pollution accidents caused by sunken vessels, information on sunken vessels has been collected, a risk assessment has been conducted, and the relevant vessels are being managed according to the results of each assessment. However, there is still a demand for improvements. The most important of the improvement plans is a paradigm shift. In other words, the management of sunken vessels needs to be transformed according to a new paradigm to manage all sunken vessels within three years from the time of sinking. Legislative improvements are also needed for the reporting system for sunken vessels, risk assessment tools, the implementation of risk mitigation measures, and criteria for the implementation cost of risk mitigation measures. In addition, close coordination between marine pollution response and sunken vessel management efforts is needed. As the division of duties between the Korea Coast Guard and the Ministry of Oceans and Fisheries is vague, collaboration between the two ministries is required. Close collaboration is also needed between the departments of navigation safety management and sunken vessel management. Therefore, it is necessary to more clearly establish the relationship between the two systems and create a synergy effect between the two administrative operations using the results of the risk assessment in the Marine Environment Management Act to determine the navigational risk posed by obstacles with regard to the Maritime Safety Act.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.