• Title/Summary/Keyword: Operation Capacity

Search Result 2,160, Processing Time 0.027 seconds

Characteristic Measurement for Ready-Deployed Optical Cable and Simulation for SDH and WDM System Existing Conditions (기포설된 광케이블 특성측정과 이 선로조건에 대한 SDH 및 DWDM 광전송장치 전송특성측정과 시뮬레이션)

  • 이성원;김영범
    • Journal of Applied Reliability
    • /
    • v.1 no.2
    • /
    • pp.121-138
    • /
    • 2001
  • Due to large demand for high speed and great capacity for data transfer, WDM, which uses the wavelength division multiplexing technique, is known as alternative way to satisfy those demand for its flexible network operation and management, easy network expansion with existing networks, and enhancement of efficient data transfer rate. For these reasons, a new high capacity WDM optical communication network plan was established. Therefore, the quality of currently deployed optical cables with 81.6 km in length should be assessed to ensure if high capacity WDM system could be implemented on existing optical cables. Two important characteristic parameters, Transfer Loss and PMD (Polarization Mode Dispersion), were measured to evaluate quality of existing optical cable. Transfer Loss was measured at 0.244 dB per kilometer, which is lower than the design standard value at 0.275 dB/km. The measured PMD value gave at 0.030ps/km, and it, therefore, satisfies the value recommended by ITU-T (International Telecommunication Union-T) of 0.5ps/km. In addition, the transfer characteristic for existing 2.5 Gbps and 10 Gbps system were measured and evaluated, and the results showed that error-free transfer is very much feasible. Computer simulation for DWDM system, which is likely be a future backbone network in Korea, to assess the transfer characteristic using the same condition employed for 2.5 Gbps and 10 Gbps was carried out as well. The simulation verified that a stable network operation and reliable service could be provided.

  • PDF

Estimation of Channel Capacity for Data Traffic Transmission (데이터 트래픽 특성을 고려한 적정 채널 용량 산정)

  • Park, Hyun Min
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.3
    • /
    • pp.589-595
    • /
    • 2017
  • We present an estimation model for optimal channel capacity required to data traffic transmission. The optimal channel capacity should be calculated in order to satisfy the permitted transmission delay of each wireless data services. Considering the discrete-time operation of digital communication systems and batch arrival of packet-switched traffic for various wireless services, $Geo^x$/G/1 non-preemptive priority queueing model is analyzed. Based on the heuristic interpretation of the mean waiting time, the mean waiting times of various data packets which have the service priority. Using the mean waiting times of service classes, we propose the procedure of determining the optimal channel capacity to satisfy the quality of service requirement of the mean delay of wireless services. We look forward to applying our results to improvement in wireless data services and economic operation of the network facilities.

Relationship Between Farm Land Structure and Machine Efficiency

  • Singh, Gajendra;Ahn, Duck-Hyun
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.119-128
    • /
    • 1993
  • Effective machine capacity is affected by the physical and geometrical conditions of the fields. In the small and scattered farmland structure field efficiency is greatly influenced by plot geometry. In this paper, a method for estimating field efficiency and effective machine capacity was developed . The developed method was applied to Korean paddy cultivation. Various time elements related to farm operations for small and scattered plots are discussed in this paper . Available working time is divided into two parts, viz. the preparation time for machine operation and actual working time. Two kinds of machine efficiencies, namely , Machine Efficiency 1, applicable on a single large plot or set of well consolidated plots ; and Machine Efficiency 2, applicable on small and scattered multiple plots, are considered. Based assumptions made and steps followed to construct the model are discussed. Effective capacity of each machine based on different plot geometries are calculated y the model. Machine efficiency on a single plot increases with increase in the dimension of longer side of the plot . Low speed, low theoretical capacity machines have higher machine efficiency which is only slightly influenced by plot geometry. As plot geometry is improved , the machine efficiency of high speed, high capacity machines increases rapidly. The effects of short side length and plot size on machine efficiency on a single plot depend on the type of farm operation. For a particular plot shape, as plot size increases, machine efficiency on multiple plots increases rapidly. The effects of consolidation on machine efficiency is highly significant if the plot size is small and/or machine size is large.

  • PDF

A Study on the Determination for Stochastic Reservoir Capacity (추계학적 저수용량 결정에 관한 연구)

  • Choe, Han-Gyu;Choe, Yong-Park;Kim, Chi-Hong
    • Water for future
    • /
    • v.19 no.2
    • /
    • pp.149-156
    • /
    • 1986
  • The generated sequences of monthly flows were analyzed based on the range concept. With the optimum operation rule of the reservoirs as the one which maximizes the wateruse downstream the waterrelease from the reservoir was determined and with \ulcorner consideration to the mean inflows and the range of monthly flows the required reservoirs capacity was stochastically determind. It is suggested that the result obtained in this study would be applied to approximately estimate, in the stage of preliminary design, the required capacity of a reservoir in question with the limited information such as the mean monthly inflow and the period of reservoir operation. For the determination of a reservoir capacity Rippl's mass-curve method has been long used with the past river flow data assuming the same flow records will be repeated in the future. This study aims to find out a better method for determining the reservoir capacity by employing the analytical theory based on the stochastic process. For the present study the synthetic generation methods of Thomas-Fiering type was used to synthetically generate 50 years of monthly river inflows to three single-purpose reservoirs and three multi-purpose reservoirs.

  • PDF

Characteristics of Carbon Dioxide Separation for Solid Absorbents According to Amine Order (아민 차수에 따른 고체 흡수제의 이산화탄소 분리 특성)

  • Hyun Tae Jang
    • Korean Chemical Engineering Research
    • /
    • v.61 no.4
    • /
    • pp.619-626
    • /
    • 2023
  • Primary and secondary amine-based sorbents were synthesized to investigate the operation capacity for the carbon dioxide separation TSA process. (3-Aminopropyl) triethoxysilane was used as a primary amine precursor as a crosslinking agent to synthesize a secondary amine precursor in which amine groups were crosslinked with a crosslinking agent. Carbon dioxide absorbed by primary amines is completely separated above 170 ℃. The working capacity of the primary amine absorbent was less than 2% when regenerated at 130℃. The secondary amine absorbent has a higher carbon dioxide separation capacity at a lower regeneration temperature than the primary amine absorbent. The secondary amine absorbent could predict process operation performance of about 6.5% with 2% carbon dioxide absorption and 100% carbon dioxide regeneration conditions. Therefore, it was found that the working capacity of the secondary amine absorbent was higher than that of the primary amine.

Independent Cell Formation Considering Operation Sequences and Machine Capacity in Flexible Assembly Systems (작업 순서와 기계 용량을 고려하는 유연조립 시스템의 독립 셀형성)

  • 노인규;최형호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.40
    • /
    • pp.253-261
    • /
    • 1996
  • In optimizing the layout design of a multi-product assembly environment, tile analysis of the material flow is a vital ingredient. In flexible assembly systems, assembly time is usually very short thus the transfer time is relatively more important Therefore operations sequence must be so determined, that have no backtracking operations as possible as, It is important to form cells, so that they have no intercell movement in curring much processing delay, and to arrange machines as possible as densly. This study presents a independent cell formation method considering operation sequences and machine capacity in flexible assembly systems.

  • PDF

A Study on the Simulation about Operation Availability under Maintenance Capacity and Repair Part Constraints (정비능력, 예비품 수량 제약조건 하에서의 운용가용도 시뮬레이션 연구)

  • Park, Se-Hoon;Moon, Seong-Am;Lee, Jung-Hwan
    • Korean System Dynamics Review
    • /
    • v.11 no.2
    • /
    • pp.119-138
    • /
    • 2010
  • This study introduces the system dynamics model that simulate total operational availability when 10 equipments made of 3 major components are serviced under the constrains of the maintenance capacity level and the number of spare parts. This simulation is designed on the base of reliability engineering concept so failures of components happens with the rule of engineering factors like the mean time between failure(MTBF) of component and the next failure time of one component is effected by the conditions of other components. We analysed availability of 10 equipments under 121 constrains and executed multiple regression analysis with the simulation result. The analysis provide the managerial insight in the service fields with operation many equipments.

  • PDF

The Study on the Temperature Distribution for 154kV Power Transformers (154kV 전력용 변압기의 온도분포에 관한 연구)

  • Woo, Jung-Wook;Koo, Kyo-Sun;Kwak, Joo-Sik;Kim, Kyung-Tak;Kweon, Dong-Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.56-61
    • /
    • 2011
  • The temperature of power transformers is very important factor for power system operation in substation because load capacity and limited lifetime of power transformers are determined by winding temperature. Also, The temperature of power transformers varies with the structure, capacity, operation condition and manufacturers. Thus, it is necessary for temperature distribution to be exactly investigated because of efficient load management and prediction of limited lifetime. Nevertheless, there was no case of analysis as well as measurement of the temperature of power transformers. In this paper, we manufactured the 154kV standard power transformer for the test. And we measured the temperature by the heat run test and analyzed the temperature distribution of transformer.

DESIGN AND PERFORMANCE OF A PROTOTYPE MOTORISED MANGO HARVESTER

  • Muhammad Salih, H.J.;Muhamad Ruhni, C.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.744-751
    • /
    • 1993
  • A prototype motorised hand-held mango harvester was designed and fabricated at the faculty of Engineering , University of Agriculture Malaysia. The harvester is aimed at reducing the harvesting operation time, improving the working comfort during the operation and increasing the harvesting capacity. The mango harvester consists of gripping and detaching devices, a power transmission shaft with a 12 V battery operated motor and an aluminium pole together with a collecting chute. Preliminary observation on the harvester's performance showed significant and satisfactory results. It was found out that the magno harvester was capable of harvesting on an average six seconds for each fruit detachment. Further study is being conducted to improve the efficiency and capacity of the mango harvester.

  • PDF

Neural Network Application to the T/L Operation for Suppression of Short Circuit Capacity (고장용량 감소를 위한 송전선 개방 운용에 신경회로망 적용 연구)

  • Lee, Gwang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.1
    • /
    • pp.26-30
    • /
    • 2000
  • Switching of the transmission lines(T/L) is one of the methods for wuppressing the short circuit capacity. This paper presents the T/L switching operation by using the Hopfield neural network(HNN). The switching of T/L can make the line powers and the bus voltages deteriorated, as well as the fault current decreased. Such an insecure state should be avoided when the T/L is operated to be open. In this studies, the inequality constraints are formulated into the objective function to be incorporated with the HNN. Test results show that the convergence characteristics of HNN lead to the adequate solution of T/L switching.

  • PDF