• Title/Summary/Keyword: Open circuit fault

Search Result 74, Processing Time 0.024 seconds

A study on Protective Coordination of MCA for Performing of the Pad Mounted Transformer's inside Protective Device (지상변압기의 내부 보호장비 작동을 위한 MCA 보호협조에 대한 연구)

  • Hyun, Seung-Yoon;Kim, Chang-Hwan
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.5-7
    • /
    • 2022
  • KEPCO's plan is undergoing a trial operation to replace the open-loop section with ring main units configuration where underground distribution lines are installed, by linking the multi-way circuit breakers auto (MCA) on the power side of each pad-mounted transformer. However, ring main units application mentioned above may cause the ripple effects, when implementing the configuration without a study of protection coordination. Because ring main units with classical pre-set protection devices contribution in fault condition didn't consider yet. For the reliable ring main units operation, it is necessary to resolve several protection issues such as the protection coordination with substation side, prevention of the transformer inrush current. These issues can radically deteriorate the distribution system reliability Hence, it is essential to design proper protection coordination to reduce these types of problems. This paper presents a scheme of ring main units' configuration and MCA's settings of time-current curves to preserve the performance of protection coordination among the switchgears considering constraints, e.g. prevention of the ripple effects (on the branch section when a transformer failure occurs and the mainline when a branch line failure occurs). It was confirmed that the propagation of the failure for each interrupter segment could be minimized by applying the proposed TCC and the interrupter settings for the MCAs (branch, transformer). Further, it was verified that the undetected area of the distribution automation system (DAS) could be supplemented by having the MCA configurated ring main units operate first, instead of the internal protection equipment in the transformer such as the fuse, STP when a transformer failure occurs.

Development of Hardware Design Process Enhancement Tool for Flight Control Computer using Modeling and Simulation (M&S 기반의 비행조종컴퓨터 하드웨어 설계 프로세스 개선을 위한 툴 개발)

  • Kwon, Jong-Kwang;Ahn, Jong-Min;Ko, Joon-Soo;Seung, Dae-Beom;Kim, Whan-Woo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.35 no.11
    • /
    • pp.1036-1042
    • /
    • 2007
  • It is rather difficult to improve flight control computer(FLCC) hardware(H/W) development schedule due to lack of commercial off-the-self(COTS) tools or target specific tools. Thus, it is suggested to develop an enhanced process utilizing modeling, simulation and virtual reality tools. This paper presents H/W design process enhancement tool(PET) for FLCC design requirements such as FLCC input/output(I/O) signal flow, I/O fault detection, failure management algorithm, circuit logic, PCB assembly configuration and installation utilizing simulation and visualization in virtual space. New tool will provide simulation capability of various FLCC design configuration including shop replaceable unit(SRU) level assembly/dis-assembly utilizing open flight format 3-D modeling data.

Cable Functional Failure Temperature Evaluation of Cable Exposed to the Fire of Nuclear Power Plant (원자력발전소 케이블 노출 화재 시 기능상실온도 분석)

  • Lim, Hyuk-Soon;Bae, Yeon-Kyoung;Chi, Moon-Goo
    • Fire Science and Engineering
    • /
    • v.26 no.1
    • /
    • pp.10-15
    • /
    • 2012
  • The fire event occurred in fire proof zone often causes serious electrical problems such as shorts, ground faults, or open circuits in nuclear power plants. These would be directed to the loss of safe shutdown capabilities performed by safety related systems and equipments. The fire event can treat the basic design principle that safety systems should keep their functions with redundancy and independency. In case of a cable fire, operators can not perform their mission properly and can misjudge the situation because of spurious operation, wrong indication or instrument. These would deteriorate the plant capabilities of safety shutdown and make disastrous conditions. In this paper, investigation and cause analysis of cable fire in Nuclear Power Plant, we described the cable fire temperature and functional failure criteria and the cable functional failure temperature evaluation by exposed fire is studied.

An Object Recognition Performance Improvement of Automatic Door using Ultrasonic Sensor (초음파 센서를 이용한 자동문의 물체인식 성능개선)

  • Kim, Gi-Doo;Won, Seo-Yeon;Kim, Hie-Sik
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.54 no.3
    • /
    • pp.97-107
    • /
    • 2017
  • In the field of automatic door, the infrared rays and microwave sensor are much used as the important components in charge of the motor's operation control of open and close through the incoming signal of object recognition. In case of existing system that the sensor of the infrared rays and microwave are applied to the automatic door, there are many malfunctions by the infrared rays and visible rays of the sun. Because the automatic doors are usually installed outside of building in state of exposure. The environmental change by temperature difference occurs the noise of object recognition detection signal. With this problem, the hardware fault that the detection sensor is unable to follow the object moving rapidly within detection area makes the sensing blind spot. This fault should be improved as soon as possible. Because It influences safety of passengers who use the automatic doors. This paper conducted an experiment to improve the detection area by installing extra ultrasonic sensor besides existing detection sensor. So, this paper realize the computing circuit and detection algorithm which can correctly and rapidly process the access route of objects moving fast and the location area of fixed obstacles by applying detection and advantages of ultrasonic signal to the automatic doors. With this, It is proved that the automatic door applying ultrasonic sensor is improved detection area of blind spot sensing through field test and improvement plan is proposed.