Proceedings of the Korea Concrete Institute Conference
/
2000.04a
/
pp.458-463
/
2000
Recently, there are increasing much concerns about repair and rehabilitation works for aged Concrete Structures which had been constructed on around the 1970's for rapid economic growth in Korea. In particular, it is believed that there are many aged concrete slabs for Highway bridges in these days. Thus new construction method of concrete slabs are strongly needed to minimize the traffic congestion during the repair works. The objective of this research is to develop the new constructional method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion to be occurred during the repair and rehabilitation works of aged concrete slab, and can also assure the reliable quality through the minimization of in-situ works at the site. I-beams with punch holes will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam with punch holes itself, and then to investigate structural properties of assembled I-Beam panels through static and fatigue test, of which result can be utilized for the development of the new constructional method for concrete slab in bridge structure.
Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
Journal of Korean Society of Disaster and Security
/
v.15
no.3
/
pp.67-77
/
2022
In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.
Korean Journal of Construction Engineering and Management
/
v.23
no.2
/
pp.3-15
/
2022
In this study, we develop a simulation model for Supply Chain Management (SCM) of modular construction based steel bridge. To this end, first, Factory Production/Site Construction system data for the steel bridge construction were collected, and supply chain, entities, resources, processes were defined based on the collected data. After that, a steel bridge supply chain simulation model was developed by creating data, flowchart, and animation modules using Arena software. Finally, verification and validation of the model were performed by using animation check, extreme condition check, average value test, Little' s law test, and actual case value test. As a result, the developed simulation model appropriately expressed the processes and characteristics of the steel bridge supply chain without any logical errors, and provided accurate performance evaluation values for the target system. In the future, we expect that the model will faithfully play a role as a performance evaluation platform in developing management techniques for optimally operating the steel bridge supply chain.
Journal of the Korea Institute of Construction Safety
/
v.6
no.1
/
pp.12-18
/
2024
High-rise, large-scale, and diversification of buildings are possible, and the reduction of concrete cross-sections reduces the weight of the structure, thereby increasing or decreasing the height of the floor, securing a large number of floors at the same height, securing a large effective space, and reducing the amount of materials, rebar, and concrete used for designating the foundation floor. In terms of site construction and quality, a low water binder ratio can reduce the occurrence of dry shrinkage and minimize bleeding on the concrete surface. It has the advantage of securing self-fulfilling properties by improving fluidity by using high-performance sensitizers, making it easier to construct the site, and shortening the mold removal period by expressing early strength of concrete. In particular, with the rapid development of concrete-related construction technology in recent years, the application of ultra-high-strength concrete with a design standard strength of 100 MPa or higher is expanding in high-rise buildings. However, although high-rise buildings with more than 120 stories have recently been ordered or scheduled in Korea, the research results of developing ultra-high-strength concrete with more than 130 MPa class considering field applicability and testing and evaluating the actual applicability in the field are insufficient. In this study, in order to confirm the applicability of ultra-high-strength concrete in the field, a preliminary experiment for the member of a reduced simulation was conducted to find the optimal mixing ratio studied through various indoor basic experiments. After that, 130 MPa-class ultra-high-strength concrete was produced in a ready-mixed concrete factory in a mock member similar to the life size, and the flow characteristics, strength characteristics, and hydration heat of concrete were experimentally studied through on-site pump pressing.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.628-631
/
2006
Modular Construction is a method, which factory-produced units are transferred to on-site and assembled to form complete buildings. It is expected that its demand will increase gradually. Because it has some advantages such as duration reduction, movement, reuse and environmental friendliness etc. For the Modular Construction to be introduced and applied, we needs the objective and reasonable performance criteria. This study presents the acoustic performance criteria of the modular building. For this one, this paper reviews legal standard related to performance, analyzes the performance evaluation and survey on pilot projects. The presented performance criteria can be specifically asked the demand by owner in a design guideline. In addition, it makes designer and general contractor accomplish target performance. Eventually, it can improve the performance of Modular Building.
A hybrid post and beam shear wall system with structural insulation panel (SIP) infill was developed as a part of a green home 'Han-green' project through post and beam construction for contemporary life style. This project is on-going at the Korea Forest Research Institute to develop a new building system which improves Korean traditional wet-type building system and stimulates industrialized wood construction practice with pre-cut system. Compared to the traditional wet-type infill wall components, the hybrid wall system has benefits, such as, higher structural capacity, better thermal insulation performance, and shorter construction term due to the dry-type construction. To build up the hybrid wall system, in previous, SIP infill wall components can be manufactured at factory, and then inserted and nailed with helically threaded nails into the post and beam members at site. Shear performance of the hybrid wall system was evaluated through horizontal shear tests. The SIP hybrid wall system showed higher maximum shear strength, initial stiffness, ductility, yield strength, specified strength, and the specified allowable strength than those of post and beam with light-frame wall system. In addition to this, the hybrid wall system can provide speedy construction and structural and functional advantages including energy efficiency in the building system.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.19-26
/
2003
In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.
A study was made on crack developments of the nearly building due to rock blasting for road construction at the 623 Common Block near the rear side of the Gamchun Habor. The gelogy of the study area is composed of andesite, which belongs to the Kyungsang System of the Cretaceous Period. For 3 months of blasting events, the vibration velocity data were measured at the site just in front of the K freezing factory. The data were divided into 4 groups according to the period of blasting(i.e, DATA 1, DATA 2, DATA 3 and DATA 4), for deriving K and n values. As a result, DATA 1 shows that K and n were 83.3756 and -0.848, respectively, and then K and n were progressively increased in absolute values for the follow-up groups and the last DATA 4 shows K and n were 2980.4898 and -1.502, respectively. Such differences in K and n values may be due to partly : 1) variations geological characteristics, from the upper rather weathered, fisssuring soft rocks at the earlier stage less weathered and fissuring hard rocks at the later stage of blasting events, and 2) the geometry between the blasting and detecting points.Among the total count of 225 blasting events, the number exceeding the safety limits of 0.5cm/sec was 20(8.9% of the total), the maximum displacement detected at the crack gage was 0.25mm, the level of which is far less to cause the occurrence and development of any cracks to the K factory. Therefore, it was confirmed that there were no damages such as structural failure or safety problem to the building.
Ahn, Jin Hee;Kim, Jun Hwan;Jung, Chi Young;Kim, Sang Hyo
Journal of Korean Society of Steel Construction
/
v.19
no.5
/
pp.527-537
/
2007
The main girders and cross-beams of an H-beam bridge consisted of factory-made H-beams, providing better conditions for quality control. Also, on-site fabrication works can be minimized and most of the stiffeners can be omitted, enabling simple and economic construction. In this study, the effect of the Multi-Stepwise TPSM (M-TPSM) on improving the maximum span length and section efficiency is analyzed. Compared to a 30-m-long, five-girder conventional plate girder bridge, structural analysis results showed that 50.7~55.1% of the girder height and 24.1~26.2% of the self-weight may be reduced by the application of M-TPSM to a five-girder H-beam bridge constructed with H-$900{\times}300$beams. In case of conventional H-beam bridges without M-TPSM, it was found that seven girders are required for a similar level of load-carrying capacity. Therefore, it is concluded that by the application of the M-TPSM, the H-beam bridge would become one of most cost-competitive options for short- and medium-span bridges.
Journal of the Korea Institute of Building Construction
/
v.20
no.5
/
pp.449-457
/
2020
Due to the improvement of living standards and avoidance of the 3D industry, it is difficult to find young and competent domestic workers at construction sites, and most foreign workers are contributing to the replacement, but the quality is still deteriorating due to lack of skilled workers and aging. Precast method is a method that make members in factory and assembles them on site, which can be expected to improve labor force and quality. This study is intended to provide basic data for the development of hang-type PC beams that can be applied to the determination of the field application of developed PC beams. The U-type connecting material is installed on both ends of the hang-up PC beam, and the role of the U-type connecting material is very important because it is a simple construction method through the U-type connecting material. In addition, the performance of the U-type connecting material will determine the performance of the hang-type PC beam as the final destruction occurs in the hang-type PC beam. The material properties of U-type connecting material were identified through structural experiments, and the end test corresponding to the partial experiment was conducted based on the material test results identified. Finally, the final design value of PC beams was proposed through structural experiments for application to the site.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.