• Title/Summary/Keyword: On-site Construction Factory

Search Result 105, Processing Time 0.02 seconds

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

A Study on the Procurement of Iron Materials and the Production of Ironwork in Constructions of Royal Tombs in the Later Joseon Period -Focused on Sanneung-uigwes- (조선후기 산릉공역의 철물 조달과 철제품 제작 -산릉의궤를 중심으로-)

  • Lee, Sang-Myeong
    • Journal of architectural history
    • /
    • v.25 no.5
    • /
    • pp.27-40
    • /
    • 2016
  • The purpose of this study was to comprehend the procurement system of iron materials and the production process of ironwork in royal tombs constructions in the later Joseon period. For this purpose, sixteen Sanneung-uigwes were analyzed. The following conclusions have been reached through the study. First, it was procuring five types of iron materials in constructions of royal tombs. Sincheol had been supplied up to the mid-18th century. On the other hand, the amount of jeongcheol was increased rapidly. Because of the procurement system of initial tools was changed from bokjeong(a kind of tribute) to self-production in the Noyaso. Second, the government stockpiles were utilized as much as possible than bokjeong to manage the limited construction period and sudden construction start. Third, before moving the site of tombs, the melting furnace was installed in the Gungisi(armament factory). The amount of the melting furnace was increased from 5 to 8 since producing the initial tools in the Noyaso. Fourth, six kinds of master artisans were worked in the field of producing ironwork. Metal worker was assigned to one person per melting furnace. Fifth, the quality of final iron materials was controlled by use. Since the 19th century, it had been produced enhanced ironwork.

A Planting Study on the Development of Eco-friendly Reinforced Earth-Retaining Wall Using Planting Green Net (환경친화형 그린넷 보강토 옹벽 개발을 위한 식생시험 연구)

  • Chung, Dae-Seouk
    • Journal of Environmental Science International
    • /
    • v.16 no.9
    • /
    • pp.1099-1102
    • /
    • 2007
  • This paper presents eco-friendly planting method to overcome the problems of existing concrete retaining wall and gabion retaining wall, respectively, based on the examination on existing concrete and gabion retaining wall. Prior to doing this, proper design method was provided through pull out test. Planting method using gabion metal net and L shape green net retaining wall were compared and analyzed. According to this study, it is confirmed that reduction of construction period and economical profit in construction can be achieved by both manufacturing at the factory and self procurement at the job site as well as the use of metal net, which is applied as a substitution of existing strengthening material. For the effect of planting method, the use of L shape green net retaining wall shows superiority to environment-friendly gabion retaining wall in its ability to rootage and germination of the grass. The L shape green net retaining wall had excellent performance in helping rootage of grass and prevention of soil leakage, and even if raining period, remarkable damage of planting mat does not occur when planting mat is applied.

Key success factors for implementing modular integrated construction projects - A literature mining approach

  • Wuni, Ibrahim Yahaya;Shen, Geoffrey Qiping
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.343-352
    • /
    • 2020
  • Modular integrated construction (MiC) is an innovative construction method where components of a building are manufactured in an offsite factory, trucked to the job site in sections, set in place with cranes, and assembled together to form a whole building. Where circumstances merit, favorable conditions exist and implemented effectively; MiC improves project performance. However, several key factors need to converge during implementation to realize the full benefits of MiC. Thus, a thorough understanding of the factors which are critical to the success of MiC projects is imperative. Drawing on a systematic review of 47 empirical studies, this research identified 25 key success factors (KSFs) for MiC projects. Of these, the five topmost cited KSFs for MiC projects include effective working collaboration and communication among project participants; standardization, optimization, automation and benchmarking of best practices; effective supply chain management; early design freeze and completion; and efficient procurement method and contracting. The study further proposed a conceptual model of the KSFs, highlighting the interdependences of people, processes, and technology-related KSFs for the effective accomplishment of MiC projects. The set of KSFs is practically relevant as they constitute a checklist of items for management to address and deal with during the planning and execution of MiC projects. They also provide a useful basis for future empirical studies tailored towards measuring the performance and success of MiC projects. MiC project participants and stakeholders will find this research useful in reducing failure risks and achieving more desired performance outcomes. One potential impact of the study is that it may inform, guide, and improve the successful implementation of MiC projects in the construction industry. However, the rigor of the analysis and relative importance ranking of the KSFs were limited due to the absence of data.

  • PDF

Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System (유닛 모듈러 공법의 특성요인 분석 및 시장진출전략)

  • Kim, Domin;Lee, Jeongseok;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.78-86
    • /
    • 2014
  • Modular system is a construction method which installs factory-manufactured units on site. It enables to reduce the duration and improve the quality of the construction. Nevertheless, the unit modular system is restrictively applied to domestic market such as barracks, education facilities, low-rise housing. To motivate the application of unit modular system, this study figures out important attributes of the unit modular system in a domestic construction market. Finally this study suggest marketing strategies and influential factors by Importance-Performance Analysis(IPA) based on those attributes focusing on the apartment housing. As a result, Unit modular System in the domestic market has strength on constructability, but it show weakness on usability and economic aspects which are more important in apartment housing market. Thus an improved technology in usability and economic aspects are required to activate the market.

Geotechnical Characteristics and Field application of Soil Mixed with Waste Lime (부산석회 혼합토의 지반공학적 특성 및 현장 적용 사례)

  • 정하익;홍승서;김상근;홍성완;유홍기;임병익
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.217-222
    • /
    • 2003
  • This study was carried out to investigate the geotechnical characteristics and field application of soil mixed with waste lime. Waste lime used in this study is producted as a by-product in the manufacturing process of making Na$_2$CO$_3$from local chemical factory in Incheon. Currently about 320 milton tons of waste lime are accumulated and annually 100,000 tons are producted. In this study, feasible use of waste lime mixed with granited whathered soil, clay, crushed rock was invesigated through laboratory tests including specific gravity test, sieve analysis, hydrometer analysis, compaction test, CBR test. Field investigations were conducted on the road construction site in Incheon.

  • PDF

A Study on Pretension Girder Method using Precast Concrete bed System (프리캐스트 콘크리트 제작대를 이용한 프리텐션 거더 제작 공법)

  • Ma, Hyang-Wook;Oh, Hyun-Chul;Kim, In-Gyu;Kim, Young-Jin;Kim, Keun-Taek
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.463-464
    • /
    • 2010
  • Pre-tension Girder using Precast Concrete bed System have advantage of simplifying construction process, reducing prestress-loss and cost compared with post-tension Girder. That is because it is possible to produce pre-tension Girder by prefabricated concrete bed in site not factory. This paper present pre-tension girder method using precast concrete bed system and field application.

  • PDF

A Study on Development of Modular System using Light-weighted Structure Members (경량형강을 사용한 모듈러 시스템 개발에 관한 연구)

  • Zheng, Sheng-Lin;Ju, Gi-Su;Park, Sung-Moo
    • Proceeding of KASS Symposium
    • /
    • 2008.05a
    • /
    • pp.43-48
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF

A Study on the Constructability of Modular Steel Frame (해체.조립식 모듈러 철골조 건물의 시공성에 관한 연구)

  • Zheng, Sheng-Lin;Kang, Joo-Won;Park, Sung-Moo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.8 no.4
    • /
    • pp.65-71
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.