• Title/Summary/Keyword: On-line maintenance and management

Search Result 127, Processing Time 0.028 seconds

Development of ADWHM(Advanced Digital Watt-Hour Meter) for Remote Management of Distribution Systems (배전원격관리를 위한 차세대 디지털 적산전력계 개발)

  • 고윤석;윤상문;서성진;강태규
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.6
    • /
    • pp.316-323
    • /
    • 2004
  • This paper develops an ADWHM(Advanced Digital Watt-Hour Meter) which integrates and implements the voltage management data record function and the load management data record function in the electronic watt-hour meter. ADWHM is developed based on PIC16F874 which is 8bit micro-controller of RISK type for the easy of programing and maintenance, and electronic power signal processing module is located at front of it to reduce the computing load of processor. Also, a 16kbyte EEPROM is used to record the voltage management data and load management data for a week as well as watt-hour data and USART communication mode is used to transfer data from ADWHM to PC. The accuracy of the voltage and unt measuring for ADWHM is verified by identifying the LCD display values of the ADWHM after the voltage signals of id levels from digital function generator is applied to PT(Potential Transformer) and CT(Current Transformer) output under state which it is separated from real power line. On the its basic functions such as watt-hour data recording function, voltage management data recording function and load management data recording function was verified by showing data for three days among the collected data to PC by RS232C communication from ADWHM which was connected to real power lines for a week.

A Study on the Development and Maintenance of Embedded SQL based Information Systems (임베디드 SQL 기반 정보시스템의 개발 및 관리 방법에 대한 연구)

  • Song, Yong-Uk
    • The Journal of Information Systems
    • /
    • v.19 no.4
    • /
    • pp.25-49
    • /
    • 2010
  • As companies introduced ERP (Enterprise Resource Planning) systems since the middle of 1990s, the databases of the companies has become centralized and gigantic. The companies are now developing data-mining based applications on those centralized and gigantic databases for knowledge management. Almost of them are using $Pro^*C$/C++, a embedded SQL programming language, and it's because the $Pro^*C$/C++ is independent of platforms and also fast. However, they suffer from difficulties in development and maintenance due to the characteristics of corporate databases which have intrinsically large number of tables and fields. The purpose of this research is to design and implement a methodology which makes it easier to develop and maintain embedded SQL applications based on relational databases. Firstly, this article analyzes the syntax of $Pro^*C$/C++ and addresses the concept of repetition and duplication which causes the difficulties in development and maintenance of corporate information systems. Then, this article suggests a management architecture of source codes and databases in which a preprocessor generates $Pro^*C$/C++ source codes by referring a DB table specification, which would solve the problem of repetition and duplication. Moreover, this article also suggests another architecture of DB administration in which the preprocessor generates DB administration commands by referring the same table specification, which would solve the problem of repetition and duplication again. The preprocessor, named $PrePro^*C$, has been developed under the UNIX command-line prompt environment to preprocess $Pro^*C$/C++ source codes and SQL administration commands, and is under update to be used in another DB interface environment like ODBC and JDBC, too.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

Comparisons of Traffic Collisions between Expressways and Rural Roads in Truck Drivers

  • Lee, Sangbok;Jeong, Byung Yong
    • Safety and Health at Work
    • /
    • v.7 no.1
    • /
    • pp.38-42
    • /
    • 2016
  • Background: Truck driving is known as one of the occupations with the highest accident rate. This study investigates the characteristics of traffic collisions according to road types (expressway and rural road). Methods: Classifying 267 accidents into expressway and rural road, we analyzed them based on driver characteristics (age, working experience, size of employment), time characteristics (day of accident, time, weather), and accident characteristics (accident causes, accident locations, accident types, driving conditions). Results: When we compared the accidents by road conditions, no differences were found between the driver characteristics. However, from the accident characteristics, the injured person distributions were different by the road conditions. In particular, driving while drowsy is shown to be highly related with the accident characteristics. Conclusion: This study can be used as a guideline and a base line to develop a plan of action to prevent traffic accidents. It can also help to prepare formal regulations about a truck driver's vehicle maintenance and driving attitude for a precaution on road accidents.

Construction of Management System of Road Position Information Using GPS Surveying Data

  • Kim, Jin-Soo;Roh, Tae-Ho;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • This study aims to construct a management system of road position information as part of the build-up to a maintenance and management system of highways. First, information on the positions of the roads were obtained by a real-time kinematic satellite surveying, and then the degree of accuracy was analyzed in comparison with the data of the existing design drawings. The linear coordinates of road center line obtained by using RTK GPS showed about 7.6-13.2cm errors in X and Y directions in the case of the national road No.2 section, and about 8.4-9.2cm errors in the case of local road No.1045 section. These errors were within the tolerance scope regulated by the TS survey, and could be practically used. In the case of vertical alignment, there were about 6.2cm errors in the Z direction in local road No.1045 section. Aerial photographs are normally used in producing numerical maps, and it can be practically used because the tolerance scope of the elevation control point is l0cm when the scale of aerial photographs is 1/1000. The management system of road position information, utilizing Object-Oriented Programming(OOP), was built having the data acquired in this way as the attribute data. The system developed in this way can enable us to spot the positions of road facilities, the target of management with ease, to easily update the data in case of changes in the positions of roads and road facilities, and to manage the positions of roads and road facilities more effectively.

  • PDF

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

A Study on the Verification of water level criteria for forecasting system of reservoir failure (저수지 붕괴예보 시스템의 수위기준 검증 연구)

  • Lee, Baeg;Choi, Byounghan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.51-55
    • /
    • 2019
  • The loss of safety for reservoirs brought about by climate change and facility aging leads to reservoir failures, which results in the loss of lives and property damage in downstream areas. Therefore, it is necessary to provide a Reservoir Failure Forecasting System for downstream residents to detect the early signs of failure (with sensors) in real-time and perform safety management to prevent and minimize possible damage. For the verification of established water level management criteria, 10 water level data up to reservoir capacity was selected. Weight factor and trend line were applied to dramatic increase section of water level in the 1 year period data. The results shows that water level criteria based on three even parts shows less than 7% of standard deviation and it is appropriate to verify management criteria.

A Study on Efficient Integrated Kitchen Management of Restaurant (외식업체 통합주방의 효율적인 운영관리에 관한 연구 -통합주방의 중앙공급에 따른 효율화 사례중심으로-)

  • 박종훈;조용범
    • Culinary science and hospitality research
    • /
    • v.9 no.4
    • /
    • pp.54-68
    • /
    • 2003
  • This study aims at efficiency of kitchen management by adoption of a systematic central kitchen and conversion of conventional kitchen to convenience kitchen at ' H ' restaurant. First, integrated menu control of banquet buffet functions became more competitive with quality menu and eventually brought about guests satisfaction. Second, systematic central kitchen made possible standardization and mass production through simplified production line. Efficiency through quick service and shortened preparation time was realized, and food materials were recycled effectively at the same time. Integrated ordering lowered purchasing price and built an efficient cost control system. Third, conversion of conventional kitchen to convenience kitchen and strengthened central kitchen system facilitated agreeable work conditions and optimal work flow with butcher's and even sauce making utensils. Fourth, integrated supply system of buffet menu and sauce from western restaurants saved about 520 million won of labor costs. Last, one integrated kitchen out of two was easier in sanitation control with pleasant restaurant space. Sharing kitchen facilities and equipments also saved about 30% of maintenance fee. Power, water, and gas were also saved and eventually curtailed overall expenses.

  • PDF

A Development of Maintenance Decision Support System for Gas Turbine Engine (가스터빈 엔진 정비 의사결정 지원시스템 개발)

  • Ki, Ja-Young;Kang, Myoung-Cheol;Lee, Myung-Kuk;Rho, Hong-Suk
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.586-591
    • /
    • 2012
  • The solution of maintenance decision support system for the gas turbine engine, which is currently operating in GUNSAN combined cycle power plant, was developed and is consist of online monitoring module, periodic performance trending module, optimal compressor washing interval analysis module and hot component management module. Also, GUI platform was applied to this solution for the user to monitoring the analyzed result of engine performance condition and then to make a decision of the consequent maintenance action. In online condition monitoring module, the performance degradation of engine is provided by the analysis of difference between the real time measurement data compared to exist engine performance. The optimal compressor washing interval module produced the washing interval of maximum net profit value by researching the maintenance expense and the loss profit value corresponds to the performance degradation with economic assessment algorithm. Thus, this solution support the user to enable the optimal maintenance and operation of gas turbine engine with overall analysis of engine condition and main information.

  • PDF

Deep-learning Sliding Window Based Object Detection and Tracking for Generating Trigger Signal of the LPR System (LPR 시스템 트리거 신호 생성을 위한 딥러닝 슬라이딩 윈도우 방식의 객체 탐지 및 추적)

  • Kim, Jinho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.17 no.4
    • /
    • pp.85-94
    • /
    • 2021
  • The LPR system's trigger sensor makes problem occasionally due to the heave weight of vehicle or the obsolescence equipment. If we replace the hardware sensor to the deep-learning based software sensor in order to generate the trigger signal, LPR system maintenance would be a lot easier. In this paper we proposed the deep-learning sliding window based object detection and tracking algorithm for the LPR system's trigger signal generation. The gate passing vehicle's license plate recognition results are combined into the normal tracking algorithm to catch the position of the vehicle on the trigger line. The experimental results show that the deep learning sliding window based trigger signal generating performance was 100% for the gate passing vehicles including the 5.5% trigger signal position errors due to the minimum bounding box location errors in the vehicle detection process.