• Title/Summary/Keyword: On-Site Process

Search Result 2,493, Processing Time 0.033 seconds

MES system based on real-time process capability management

  • Han, Jin-Su
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.11
    • /
    • pp.115-122
    • /
    • 2020
  • In this paper, we propose an MES system based on real-time process capability management and how to manage the manufacturing process using the system. The current MES system presents a KPI report that makes it easy to recognize the manufacturing site, but has not been able to derive an improvement method to improve the actual manufacturing site KPI. In other words, it is difficult to extract the cause of the increase in defective rate, decrease in yield, and increase in production lead-time, and to draw an improvement plan and apply it to the manufacturing site. The purpose of the MES system based on real-time process capability management proposed in this paper is to establish an manufacturing operation management system that overcomes the limitations of the existing MES by managing the distribution of major factors of the equipment that determines the process capability. In addition, by presenting a speed improvement method for real-time large-capacity data processing, it is intended to be applied so that the system can operate well.

Exergy Analysis and Heat Exchanger Network Synthesis for Improvement of a Hydrogen Production Process: Practical Application to On-Site Hydrogen Refueling Stations (수소 생산 공정 개선을 위한 엑서지 분석과 열 교환망 합성: 분산형 수소 충전소에 대한 실용적 적용)

  • YUN, SEUNGGWAN;CHO, HYUNGTAE;KIM, MYUNGJUN;LEE, JAEWON;KIM, JUNGHWAN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.5
    • /
    • pp.515-524
    • /
    • 2022
  • In this study, the on-site hydrogen production process for refueling stations that were not energy-optimized was improved through exergy analysis and heat exchange network synthesis. Furthermore, the process was scaled up from 30 Nm3/h to 150 Nm3/h to improve hydrogen production capacity. Exergy analysis results show that exergy destruction in the SMR reactor and the heat exchanger accounts for 58.1 and 19.8%, respectively. Thus, the process is improved by modifying the heat exchange network to reduce the exergy loss in these units. As a result of the process simulation analysis, thermal and exergy efficiency is improved from 75.7 to 78.6% and 68.1 to 70.4%, respectively. In conclusion, it is expected to improve the process efficiency when installing on-site hydrogen refueling stations.

Landscape Design for the National Athlete Training Camp (국가대표 선수 훈련원 마스터플랜 설계경기 조경계획)

  • Kim Ah-Yeon;Yoo Seon-Keun;Oh Hyung-Seok
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.6 s.113
    • /
    • pp.109-126
    • /
    • 2006
  • As the national interest in sports has been increased over time, sports facilities and sports complex are considered more than just physical environments for training athletes or watching games. Sports facilities now become symbolic spatial devices to represent the national and cultural pride of any countries. The existing national training camp located in Taenung, Seoul is gotting outdated and degraded. The polluted air in the city risks athletes' health condition. The government planned to construct the second training camp at Jincheon, Chungbuk at the area of $2,171,910m^2$. The Korea Sports Council called for proposals to envision the future training camp, and they held a design competition from August to November, 2005. The first phase was to present the masterplan for the entire site including training buildings, outdoor training facilities, dormitories, a visitor center, a research center, education and administration buildings. Considering the size of the site, the planning process required a strong relationship between landscape and architecture. This study tries to provide general explanations on the winning proposal focused on the landscape-related issues. It also attempts to have reference points for contemporary planning and design issues to situate the project in the stream of continuing design effort to avoid the dichotomy between nature and culture. The landscape proposal for the new national taming camp suggests four main strategies; 1) The camp has two intersecting and interweaving parks which represent the natural and urban order. 2) The entire site is organized and networked by the flow of landscape called landscape ribbon in terms of topography, vegetation, and water flow. 3) The landscape is choreographed through the time and process. 4) The ecological process and the digital contents are juxtaposed in the landscape. This winning proposal is the first step to portray the national vision for the sustainable environment coexisting with sports industry. Landscape in this proposal is an active agent to network various parts of the site which enables landscape to be infrastructure. Landscape design in this proposal should be considered open-ended strategies rather than determined concrete forms and its engaging further development will be tested in following Design-Build phase.

Survey on Transition Process of Construction Sites in Left and Right of Lecture Hall in the Temple of Baekje During the 6~7th Century (6~7세기 백제 사찰 내 강당 좌우 건물지의 변천과정 고찰)

  • Jung, Ja-Young
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.137-153
    • /
    • 2010
  • Jeongrimsaji as temple remains of Baekje Sabi period, its re-excavation has been carried three times in full scale. As a result, the buildings in left and right of lecture hall was largely identified in 3 forms. First, layout of small buildings in left and right of lecture hall. Second, layput of corridor in left and right of lecture hall. Third, layout of construction site in the north of corridor in left and right of lecture hall. Above second is included into remains of Gorye, the third is included into remains of Baekje - the remains were almost ruined then. The first form and third form in above is different each other in size of buildings, form of layout, and location. It is important to investigate these points: the time of constructing the buildings; what position have the use and function of the buildings in the temple? ; transition process of layout of the Buddhist temple. In this context, of temple remains in Baekje during the 5~7th century, the cases where construction sites in left and right of lecture hall and construction site in the north of corridor are identified, have been reviewed. Based on this review, the use and function of buildings, their transition process were investigated. The survey results show that small buildings in left and right of lecture hall existed in the middle and later period of the 6th century. During the later 6th century ~ the 7th century, construction site in narrow and long square shape was located in left and right of lecture hall instead of small buildings in the north of corridor. Therefore, it is identified that the aforementioned thing is earlier stage and the latter thing is later stage.

Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach (건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축)

  • Ko, Yong-Ho;Park, Min-Ha;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

Augmented Reality Framework for Efficient Access to Schedule Information on Construction Sites (증강현실 기술을 통한 건설 현장에서의 공정 정보 활용도 제고 방안)

  • Lee, Yong-Ju;Kim, Jin-Young;Pham, Hung;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.60-69
    • /
    • 2020
  • Allowing on-site workers to access information of the construction process can enable task control, data integration, material and resource control. However, in the current practice of the construction industry, the existing methods and scope is quite limited, leading to inefficient management during the construction process. In this research, by adopting cutting edge technologies such as Augmented Reality(AR), digital twins, deep learning and computer vision with wearable AR devices, the authors proposed an AR visualization framework made of virtual components to help on-site workers to obtain information of the construction process with ease of use. Also, this paper investigates wearable AR devices and object detection algorithms, which are critical factors in the proposed framework, to test their suitability.

Analysis on Vegetation Change of Forest Fire Damaged Area in Sogeumgang District, Gyeongju National Park (경주국립공원 소금강지구 산불피해지의 식생변화 분석)

  • You, Ju-Han;Kwon, Soon-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.47-64
    • /
    • 2019
  • The purpose of this study is to present the basic data for the management of National Park by surveying and analysing the change of vegetation of forest fire damaged area in Sogeumgang District, Gyeongju National Park. The covergae ratio, a number of species and dominant species changed overall in forest fire damaged area. The final result of the change is as follows. In case of coverage ratio in the shrub layer, Site 1 was 30%, 40% in Site 2, 50% in Site 3, 60% in Site 4 and 30% in Site 5. In the herb layer, Site 1 was 90%, 80% in Site 2, 90% in Site 3, 60% in Site 4 and 20% in Site 5. In case of the number of species in the shrub layer, Site 1 was 11 species, 8 species in Site 2, 6 species in Site 3, 10 species in Site 4, 7 species in Site 5, and in the herb layer, Site 1 was 22 species, 25 species in Site 2, 12 species in Site 3 and Site 4 each and 11 species in Site 5. In the dominant species, the shrub layer was Lespedeza maritima(Site 1, 2), Quercus serrata(Site 3), Quercus serrata and Lespedeza bicolor(Site 4) and Styrax japonicus(Site 5), the herb layer was Miscanthus sinensis var. purpurascens(Site 1, 3), Pteridium aquilinum var. latiusculum and Carex humilis var. nana(Site 2), Quercus serrata(Site 4) and Carex humilis var. nana andS tyrax japonicus(Site 5). The number of vascular plants was summarized as 91 taxa including 35 families, 69 genera, 78 species, 2 subspecies, 10 varieties and 1 form.

The Quantitative Analysis of Alternative-Decision in Missile Test: Focusing on Selecting a Foreign Test Site through Data Envelopment Analysis (미사일 시험을 위한 대안결정의 정량적 분석: 자료포락분석을 이용한 국외 시험장 선정을 중심으로)

  • Han, Seung Jo
    • Convergence Security Journal
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2020
  • Although the related regulations or guidelines are not specified in the defense weapon system R&D process, R&D authorities frequently encounter problems that require rational decision-making. If the rational process is not applied in the matter of alternative choice, the project could be disrupted, which can result in longer project periods or more resource provision. In particular, a variety of decision-making methods are needed for test&evaluation of missile R&D. The issue of selecting a test site is one of the representative decision-making problems. If it is needed to determine the priority of multiple sites, Delphi Method and Analytic Hierarchy Process(AHP) will be applied. However, if the input of cost is to be considered, Data Envelopment Analysis(DEA) is more valuable to solve the problem. This paper proposes a solution to handle quantitatively various decision-making problems that can occur in missile flight test, and shows how DEA is applied through a simulated case study of selecting a foreign test site.

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

A Study on the Development of Suitability Site Indicator for Urban-Rural Migration/Return to Fishing (귀어·귀촌 적지지표 개발에 관한 연구)

  • Jang, Young-Soo;Lee, Jung-Phil;Kim, Ji-Ung;Song, Young-Taek
    • The Journal of Fisheries Business Administration
    • /
    • v.49 no.2
    • /
    • pp.49-65
    • /
    • 2018
  • The aim of this study is to develop suitability site indicator of urban-rural return to fishing and to analysis priority of the indicators. The study is based on literature review, expert survey and AHP(Analytic Hierarchy Process) methods. This study found 5 factors(natural environment, acceptance environment, social overhead capital, economy, fishing environment) and 21 detail variables. as a result of AHP, fisheries resources, acquisition convenience of fishing license, income(except fishing), attitude of local resident, one-person household income, high income fishing were showed high priority. This result indicate that economic foundation is most important factor for suitable site of the returning.