• Title/Summary/Keyword: On-Site Construction

Search Result 3,675, Processing Time 0.11 seconds

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

AUTOMATING SUPERVISORY MANPOWER ALLOCATION FOR CONSTRUCTION SITES

  • Jieh-Haur Chen;Li-Ren Yang;W. H. Chen;C. K. Chang
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.239-248
    • /
    • 2007
  • In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.

  • PDF

Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone

  • Kim, Seungho;Kim, Sangyong
    • Smart Structures and Systems
    • /
    • v.21 no.2
    • /
    • pp.139-149
    • /
    • 2018
  • Understanding the current status of a construction project is necessary to achieve successful on-site management. Real-time information delivery is a major concern for construction industry practitioners in order to expedite decisions and discussions. We propose the use of a first personal view (FPV) system of a quadcopter drone as a tool for monitoring on-site status and communicating between construction participants. The most important function of the drone FPV system is its ability to visually monitor construction site situations in real time. An on-site management system process is developed, verified, and applied to several construction work tasks after determining factors that affect efficient construction management. The proposed system is expected to assist the construction manager in achieving high efficiency.

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

DATA ACQUISITION METHOD USING A SMARTPHONE ON CONSTRUCTION SITE

  • Ahra Jo;Teahoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.231-234
    • /
    • 2013
  • According to the recent development of USN technology, it has been applied in various fields of construction management. In particular, the concrete curing management using the wireless measurement system is actively being conducted. However, the existing method has limitations such as the reinstallation of temperature sensors and repositioning of repeaters. It is also not easy to acquire the measured data. Thus, this study focuses on the concrete curing management. This study proposes data acquisition method using the smartphone on construction site and tests applicability of the data measuring device and the smartphone. The test allows us to suggest the actual communication distance on construction site and to determine the correction value that is applied to the measured temperature. The data acquisition method proposed in this study is intended to enable appropriate management on construction site and will be able to be applied effectively to a variable construction site. It can also be used in all fields of construction management.

  • PDF

Investigation of health and safety impact from the 'Site BIM' tools in the live construction sites

  • Shah, Raj;Edwards, Joel
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.1-7
    • /
    • 2016
  • Construction in the UK is the second most dangerous industry in terms of fatal and minor injuries according to the 2014 report of HSE. The use of mobile devices such as iPad, Tablets and Smart phones on the live construction projects is also on the increase in the UK due to the 2016 - Level 2 BIM (Building Information Modelling) implementation target, set by the UK Government. Hence, the use of such devices may become a distraction from work activities on the construction sites and will cause a major risk to the end users. The subject of improving safety of BIM use is widely researched, but there is a gap in knowledge about the actual use of the mobile devices and perception of 'Site BIM', on the construction site activities. The main gap identified in the 'Site BIM' is the health and safety aspect of using such devices on the construction sites. A safer way of working with such devices needs to be identified to avoid any potential site hazards and fatalities before the widespread use of the devices are found on the construction projects. In that context, the paper is aimed to highlight the safety issues that are required to address for the successful implementation of the mobile devices for safer use of the 'Site BIM'. Questionnaire survey was used to collect the site information among construction professionals in the UK. The survey findings suggested that a proactive approach may be helpful to stop potential hazards and risks causing by the use of mobile devices and potential measures need to be identified before any injuries and incidents occur. The paper concludes that training, changing size of mobile devices and ensuring a separate induction training for 'Site BIM' tools will improve the health and safety of the end users of the mobile devices at the live construction sites.

Deep learning platform architecture for monitoring image-based real-time construction site equipment and worker (이미지 기반 실시간 건설 현장 장비 및 작업자 모니터링을 위한 딥러닝 플랫폼 아키텍처 도출)

  • Kang, Tae-Wook;Kim, Byung-Kon;Jung, Yoo-Seok
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.24-32
    • /
    • 2021
  • Recently, starting with smart construction research, interest in technology that automates construction site management using artificial intelligence technology is increasing. In order to automate construction site management, it is necessary to recognize objects such as construction equipment or workers, and automatically analyze the relationship between them. For example, if the relationship between workers and construction equipment at a construction site can be known, various use cases of site management such as work productivity, equipment operation status monitoring, and safety management can be implemented. This study derives a real-time object detection platform architecture that is required when performing construction site management using deep learning technology, which has recently been increasingly used. To this end, deep learning models that support real-time object detection are investigated and analyzed. Based on this, a deep learning model development process required for real-time construction site object detection is defined. Based on the defined process, a prototype that learns and detects construction site objects is developed, and then platform development considerations and architecture are derived from the results.

A study on the Improvement Plan of Construction Site Management In Korea (국내 건설 현장관리업무의 개선방안에 관한 연구)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.