As offshore wind farms are developed, the importance of cooperation with stakeholders such as fishermen from the initial phase is gradually increasing. This study developed a methodology that can promote the involvement of fishermen in the site feasibility review process. The spatial scope is Gunsan City, which is establishing an initial offshore wind project strategy. A survey was conducted for representatives of 12 fishing villages on the location preference for offshore wind farms. As a result, fishermen suggested negotiable or absolute opposite locations by examining a local sea map. Location preference seems to depend on the degrees of vitalization of fisheries using vessels. This study shows that fishermen can have reasonable opinions according to the location, not unconditionally, in initial discussions on offshore wind power. Investigating stakeholders with various positions is essential, and adjustments are needed for conflicting points in the future.
This paper has represented about the activated scheme the Honam regional wind power industry favorable products. The favorable products are the MW offshore wind system with Outer-rotor type PMSG-6 products, the 3MW offshore wind system with adatation type of west-south sea, and the hybrid generator system with wind turbine technology basis-2 products.
Kim, Gui-Young;Lee, Dae-In;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun
Journal of Environmental Impact Assessment
/
v.21
no.1
/
pp.1-13
/
2012
We diagnosed on status and problems of environmental assessment regarding development of offshore wind power, and also on reasonable core assessment items. Most of the coastal wind power are located on the western coastline of Korea and Jeju Island. In the selections of the site for the offshore wind farms, a previous investigations should be conducted with regard to distances from the land, stabilities from external forces (tide, wave, etc.) and topographical changes, and characteristics of the surroundings (distributions of protected area, fishing ground, artificial seagrasses, and shipping traffic). It is needed to assess dispersion of suspended solids, changes of the sea bottom, and impacts on fisheries resources and fishing activities under construction of offshore wind power. Furthermore, the responses of marine organisms to noise and vibration, impacts by electromagnetic fields, impacts on sea birds, hindrances to sea lane routes, and damaged scenery and marine protection areas are thoroughly assessed during operation processes. The consultation criteria in case of development of offshore wind farm is adjusted by focusing marine environmental impact assessment.
International Journal of Naval Architecture and Ocean Engineering
/
v.9
no.1
/
pp.45-54
/
2017
The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.
To clarify the characteristics of TKE (Turbulence Kinetic Energy) variation for offshore wind power development, several numerical experiments using WRF were carried out in three different coastal area of the Korean Peninsula. Buoyancy, mechanical and shear production term of the TKE budget are fundamental elements in the production or dissipation of turbulence. Turbulent kinetic energy of the south coast region was higher than in other sea areas due to the higher sea surface temperature and strong wind speed. In south coast region, strong wind passing through the Korea Strait is caused by channelling effect of the terrain of the Geoje Island. Although wind speed is weak in east coast, because of large difference in wind speed between the upper and lower layer, the development of mechanical turbulence tend to be predominant. Since lower sea surface temperature and smaller wind shear were detected in west coastal region, the possibility of turbulence production not so great in comparison with other regions. The understanding of the characteristics of turbulence in three different coastal region can be reduced the uncertainty of offshore wind construction.
Offshore wind power is a representative renewable energy source and a rapidly growing industry. In Gyeongsangnam-do, offshore wind farms of 461.9MW are being pushed for in the Yokji island and are expected to expand further to over 1GW in the future. Accordingly, ports supporting the storage, assembly, transportation, and installation of offshore wind power equipment are expected to play an important role in the smooth progress of the offshore wind farm development project. Based on previous research and cases in major countries,this study prepared criteria for assessment of ports supporting offshore wind farmsand evaluated ports in Gyeongsangnam-do, which are linked to Yokji island offshore wind farms. The assessment criteria have been subdivided into distance from the offshore wind farm, port entry and exit restrictions, navigational areas, fishery rights factors, additional costs, berth length, depth of berth, size of the port yard, port berth bearing pressure, interference with other cargo, a civil appeal, and relevant industrial aggregation. The ports of Tongyeong, Samcheonpo, Kohyun, Masan, and Jinhae in Gyeongsangnam-do were selected and evaluated. As a result, the port of Tongyoung was superior in terms of distance from the Yokji island offshore wind farm. The ports of Samcheonpo, Masan, and Jinhae were evaluated as excellent in other criteria such as berth length, depth of berth, and so on. This study is expected to be used as a source of basic data for offshore wind power companies and policymakers to select and evaluate the supporting ports of offshore wind farms.
Soh, Joon-Young;Lee, Min-Woo;Kim, Su-Kyung;Kim, Do Hyung
KEPCO Journal on Electric Power and Energy
/
v.2
no.4
/
pp.615-618
/
2016
Electrochemical noise(EN) has been used to analyze the deterioration of coating films of offshore wind substructures. In this study, prototype sensors using EN have been developed to detect the corrosion rate. To verify the reliability of sensors, experiments were conducted both in the laboratory and offshore using probe and standard samples. New analysis and data processing techniques show that the sensor can provide useful information about the corrosion rate.
Kim, Dong-Ho;Jang, Won-Yil;Kim, Seong-Yun;Shin, Sung-Ryul;Lim, Jong-Se;Yoon, Ji-Ho
Journal of Advanced Marine Engineering and Technology
/
v.33
no.2
/
pp.355-361
/
2009
Onshore wind farms having several problems, difficult to secure a building site and incur the enmity of the people. Therefore, offshore wind farms are increasingly expected, because there are huge resource and large site in offshore. If huge wind turbines are constructed, the offshore wind power base is concerned about subsidence. In order to confirm the ground stability, estimation of subsidence is necessary. In this paper, the subsidence is predicted by continuity model when the gravity and the mono-pile base are constructed on soft ground. The FLAC 3D, three dimensional FDM program, was adopted to analysis subsidence. Input factors are yielded by geological information at the yeompo quay in ulsan and the results of laboratory experiments. It has been compared that the original ground with improved ground under the gravity base, and constructed mono-pile under the mono-pile base.
A multi-platform offshore wind farm is receiving the worldwide attention for the sake of maximizing the wind power capacity and the dynamic stability at sea. But, its wind power efficiency is inherently affected by the interference of wake disturbed by the rotating blades, so its layout should be appropriately designed to minimize such wake interference. In this context, the purpose of this paper is to introduce a layout optimization for multi-platform offshore wind farm consisted of 2.5MW spar-type floating wind turbines. The layout is characterized by the arrangement type of wind turbines, the spacing between wind turbines and the orientation of wind farm to the wind direction, but the current study is concerned with the spacing for a square-type wind farm oriented with the specific angle. The design variable and the objective function are defined by the platform length and the total material volume of the wind farm. The maximum torque loss and overlapping section area are taken as the constraints, and their meta-models expressed in terms of the design variable are approximated using the existing experimental data and the geometry interpretation of wake flow.
According to "The Renewable Energy 3020 Implementation Plan", offshore wind power accounts for 12 GW of the total new capacity of 48.7 GW. Like the south-west 2.5 GW offshore wind farm case, government-led development has had difficulty in securing the residents' acceptability. This study contributes to the study of local acceptance by analyzing the perceptions of Maldo residents. To this end, in-depth interviews were conducted with the head of a village and fishing village chief, and the entire contents of the interview were revised and analyzed. The cognitive structure of the stakeholders could be confirmed using semantic network analysis, which analyzes the network structure among words. Based on the analysis results, focusing on the identity frames related to the compensation process from previous national projects, gain vs. loss frames act as the dominant frame in terms of profits from offshore wind turbines. To invigorate offshore wind farms, the policy implications as follows. First, a negotiation organization should be organized to deal with strategic opposition by fishes. Second, installing offshore wind farms on a public water body will result in demands for compensation from various actors, and a licensed fishing territory as an offshore wind farm installation site should be considered.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.