• Title/Summary/Keyword: Off-design performance

Search Result 908, Processing Time 1.493 seconds

Characteristics of MHEMT Devices Having T-Shaped Gate Structure for W-Band MMIC (W-Band MMIC를 위한 T-형태 게이트 구조를 갖는 MHMET 소자 특성)

  • Lee, Jong-Min;Min, Byoung-Gue;Chang, Sung-Jae;Chang, Woo-Jin;Yoon, Hyung Sup;Jung, Hyun-Wook;Kim, Seong-Il;Kang, Dong Min;Kim, Wansik;Jung, Jooyong;Kim, Jongpil;Seo, Mihui;Kim, Sosu
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.33 no.2
    • /
    • pp.99-104
    • /
    • 2020
  • In this study, we fabricated a metamorphic high-electron-mobility transistor (mHEMT) device with a T-type gate structure for the implementation of W-band monolithic microwave integrated circuits (MMICs) and investigated its characteristics. To fabricate the mHEMT device, a recess process for etching of its Schottky layer was applied before gate metal deposition, and an e-beam lithography using a triple photoresist film for the T-gate structure was employed. We measured DC and RF characteristics of the fabricated device to verify the characteristics that can be used in W-band MMIC design. The mHEMT device exhibited DC characteristics such as a drain current density of 747 mA/mm, maximum transconductance of 1.354 S/mm, and pinch-off voltage of -0.42 V. Concerning the frequency characteristics, the device showed a cutoff frequency of 215 GHz and maximum oscillation frequency of 260 GHz, which provide sufficient performance for W-band MMIC design and fabrication. In addition, active and passive modeling was performed and its accuracy was evaluated by comparing the measured results. The developed mHEMT and device models could be used for the fabrication of W-band MMICs.

A Study on Validation for Mapping of Gas Detectors at a BTX Plant (BTX 공정에서 Gas Detector Mapping 적정성 검토에 관한 연구)

  • Seo, Ji Hye;Han, Man Hyoeng;Kim, Il Kwon;Chon, Young Woo
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.168-178
    • /
    • 2017
  • In order to prevent major and chemical accidents, some of the plants which would like to install and operate hazard chemicals handling facilities must submit Off-site Consequence Analysis due to recent arisen leak accidents since 2015. A lot of chemical industrials choose gas detectors as mitigation equipment to early detect gas vapor. The way of placement of gas detectors has two methods; Code-based Design(CBD) and Performance-based Design. The CBD has principles for gas detectors to be installed with consideration for the place that is expected to accumulate gas, and the leak locations according to legal standards and technical guidelines, and has a possibility to be unable to detect by these rules to locate gas detectors by vapor density information. The PBD has two methods; a Geographic Method and Scenario based Method. The Scenario-based Method has been suggested to make up for the Geographic Coverage Method. This Scenario-based Method draw the best optimum placement of gas detectors by considering leak locations, leak speed information, leak directions and etc. However, the domestic placement guidelines just refers to the CBD. Therefore, this study is to compare existing placement location of gas detectors by the domestic CBD with placement locations, coverages and the number of gas detectors in accordance with the Scenario-based Method. Also this study has measures for early detecting interest of Vapor Cloud and suitable placement of gas detectors to prevent chemical accidents. The Phast software was selected to simulate vapor cloud dispersion to predict the consequence. There are two cases; an accident hole size of leak(8 mm) from API which is the highst accident hole size less than 24.5 mm, and a normal leak hole size from KOSHA Guide (1.8 mm). Detect3D was also selected to locate gas detectors efficiently and compare CBD results and PBD results. Currently, domestic methods of gas detectors do not consider any risk, but just depend on domestic code methods which lead to placement of gas detectors not to make personnels recognize tolerable or intolerable risks. The results of the Scenario-based Method, however, analyze the leak estimated range by simulating leak dispersion, and then it is able to tell tolerable risks. Thus it is considered that individuals will be able to place gas detectors reasonably by making objectives and roles flexibly according to situations in a specific plant.

A Decade's Experiences on the Hydrofracturing In-Situ Stress Measurement for Tunnel Construction in Korea (암반터널 설계를 위한 수압파쇄 초기지압 측정의 10여년 간의 경험)

  • Choe, Seong-Ung;Park, Chan;Sin, Jung-Ho;Sin, Hui-Sun
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.03a
    • /
    • pp.79-88
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, so it was not easy to handle. It had been modified to a wire-line system at their second generation. It was more compact one but it also needed an additional air-compressor. Our current system is much more compact and operated by all-in-one system, so it doesn't need an additional air-compressor. With a progress in a hardware system, the software for analyzing the in-situ stress regime has also been progressed. For example, the shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

Design of Wind Turbines for Reducing Interference to Radar Signals (레이더 신호 간섭의 최소화를 위한 풍력 발전기 설계)

  • Park, Kang-Kook;Chin, Hui-Cheol;Kim, Kyung-Tae;Kim, Hyo-Tae;Kim, Jin-Bong
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.23 no.4
    • /
    • pp.533-540
    • /
    • 2012
  • The use of wind energy is gaining importance because of its many advantages. Nations worldwide are promoting the installation of wind farms to produce electricity in an attempt to tackle climate change and increasing oil costs. But, wind turbines can generate undesired signals which disturb the performance of military radar systems. Because the current generation of on and off-shore three bladed wind turbines have radar signatures consistent with their very large physical size. So this study considers the options available for the reduction of wind turbine radar signature and presents solutions for each of the main external turbine components. The radar signature reduction approaches are based on existing technologies developed for aerospaces stealth applications. However, the realization of these for the purposes of reduction wind turbine radar signatures is a novel development, particularly in the solutions proposed. This paper is presented techniques which reduce radar signatures of wind turbine. We know that radar signatures of wind turbine reduce by using these techniques.

Progress Report on NISS onboard NEXTSat-1

  • Jeong, Woong-Seob;Park, Sung-Joon;Park, Kwijong;Moon, Bongkon;Lee, Dae-Hee;Pyo, Jeonghyun;Park, Youngsik;Kim, Il-Joong;Park, Won-Kee;Lee, Duk-Hang;Park, Chan;Ko, Kyeongyeon;Nam, Ukwon;Han, Wonyong;Im, Myungshin;Lee, Hyung Mok;Lee, Jeong-Eun;Shin, Goo-Hwan;Chae, Jangsoo;Matsumoto, Toshio
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.39 no.1
    • /
    • pp.49.1-49.1
    • /
    • 2014
  • The NISS (Near-infrared Imaging Spectrometer for Star formation history) onboard NEXTSat-1 is the near-infrared instrument onboard NEXTSat-1 which is being developed by KASI. The imaging low-resolution spectroscopic observation in the near-infrared range for nearby galaxies, low background regions, star-forming regions and so on will be performed on orbit. After the System Requirement Review, the optical design is changed from on-axis to the off-axis telescope which has a wide field of view (2 deg. ${\times}$ 2 deg.) as well as the wide wavelength range from 0.95 to $3.8{\mu}m$. The mechanical structure is considered to endure the launching condition as well as the space environment. The design of relay optics is optimized to maintain the uniform optical performance in the required wavelength range. The stray light analysis is being made to evade a light outside a field of view. The dewar is designed to operate the infrared detector at 80K stage. From the thermal analysis, we confirmed that the telescope can be cooled down to around 200K in order to reduce the large amount of thermal noise. Here, we report the current status of the NISS development.

  • PDF

The Clinical Utility of Korean Bayley Scales of Infant and Toddler Development-III - Focusing on using of the US norm - (베일리영유아발달검사 제3판(Bayley-III)의 미국 규준 적용의 문제: 미숙아 집단을 대상으로)

  • Lim, Yoo Jin;Bang, Hee Jeong;Lee, Soonhang
    • Korean journal of psychology:General
    • /
    • v.36 no.1
    • /
    • pp.81-107
    • /
    • 2017
  • The study aims to investigate the clinical utility of Bayley-III using US norm in Korea. A total of 98 preterm infants and 93 term infants were assessed with the K-Bayley-III. The performance pattern of preterm infants was analyzed with mixed design ANOVA which examined the differences of scaled scores and composite scores of Bayley-III between full term- and preterm- infant group and within preterm infants group. Then, We have investigated agreement between classifications of delay made using the BSID-II and Bayley-III. In addition, ROC plots were constructed to identify a Bayley-III cut-off score with optimum diagnostic utility in this sample. The results were as follows. (1) Preterm infants have significantly lower function levels in areas of 5 scaled scores and 3 developmental indexes compared with infants born at term. Significant differences among scores within preterm infant group were also found. (2) Bayley-III had the higher scores of the Mental Development Index and Psychomotor Developmental Index comparing to the scores of K-BSID-II, and had the lower rates of developmental delay. (3) All scales of Bayley-III, Cognitive, Language and Motor scale had the appropriate level of discrimination, but the cut-off composite scores of Bayley-III were adjusted 13~28 points higher than 69 for prediction of delay, as defined by the K-BSID-II. It explains the lower rates of developmental delay using the standard of two standard deviation. This study has provided empirical data to inform that we must careful when interpreting the score for clinical applications, identified the discriminating power, and proposed more appropriate cut-off scores. In addition, discussion about the sampling for making the Korean norm of Bayley-III was provided. It is preferable that infants in Korea should use our own validated norms. The standardization process to get Korean normative data must be performed carefully.

A Study on a Calculation Method of Economical Intake Water Depth in the Design of Head Works (취입모의 경제적 계획취입수심 산정방법에 대한 연구)

  • 김철기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.20 no.1
    • /
    • pp.4592-4598
    • /
    • 1978
  • The purpose of this research is to find out mathemetically an economical intake water depth in the design of head works through the derivation of some formulas. For the performance of the purpose the following formulas were found out for the design intake water depth in each flow type of intake sluice, such as overflow type and orifice type. (1) The conditional equations of !he economical intake water depth in .case that weir body is placed on permeable soil layer ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } { Cp}_{3 }L(0.67 SQRT { q} -0.61) { ( { d}_{0 }+ { h}_{1 }+ { h}_{0 } )}^{- { 1} over {2 } }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { dcp}_{3 }L+ { nkp}_{5 }+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ] =0}}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } C { p}_{3 }L(0.67 SQRT { q} -0.61)}}}} {{{{ { ({d }_{0 }+ { h}_{1 }+ { h}_{0 } )}^{ - { 1} over {2 } }- { { 3Q}_{1 } { p}_{ 6} { { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{ 2}m' SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L }}}} {{{{+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 } L+dC { p}_{4 }L+(2 { z}_{0 }+m )(1-s) { L}_{d } { p}_{7 }]=0 }}}} where, z=outer slope of weir body (value of cotangent), h1=intake water depth (m), L=total length of weir (m), C=Bligh's creep ratio, q=flood discharge overflowing weir crest per unit length of weir (m3/sec/m), d0=average height to intake sill elevation in weir (m), h0=freeboard of weir (m), Q1=design irrigation requirements (m3/sec), m1=coefficient of head loss (0.9∼0.95) s=(h1-h2)/h1, h2=flow water depth outside intake sluice gate (m), b=width of weir crest (m), r=specific weight of weir materials, d=depth of cutting along seepage length under the weir (m), n=number of side contraction, k=coefficient of side contraction loss (0.02∼0.04), m2=coefficient of discharge (0.7∼0.9) m'=h0/h1, h0=open height of gate (m), p1 and p4=unit price of weir body and of excavation of weir site, respectively (won/㎥), p2 and p3=unit price of construction form and of revetment for protection of downstream riverbed, respectively (won/㎡), p5 and p6=average cost per unit width of intake sluice including cost of intake canal having the same one as width of the sluice in case of overflow type and orifice type respectively (won/m), zo : inner slope of section area in intake canal from its beginning point to its changing point to ordinary flow section, m: coefficient concerning the mean width of intak canal site,a : freeboard of intake canal. (2) The conditional equations of the economical intake water depth in case that weir body is built on the foundation of rock bed ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { nkp}_{5 }}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0 }}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{6 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{2 }m' SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0}}}} The construction cost of weir cut-off and revetment on outside slope of leeve, and the damages suffered from inundation in upstream area were not included in the process of deriving the above conditional equations, but it is true that magnitude of intake water depth influences somewhat on the cost and damages. Therefore, in applying the above equations the fact that should not be over looked is that the design value of intake water depth to be adopted should not be more largely determined than the value of h1 satisfying the above formulas.

  • PDF

Effect of Shift Interval for the Clinical Nurse on the Circadian Rhythm (임상 간호사의 교대근무 기간이 circadian rhythm 변화에 미치는 영향)

  • 황애란;정현숙;임영신;이혜원;김조자
    • Journal of Korean Academy of Nursing
    • /
    • v.21 no.2
    • /
    • pp.129-149
    • /
    • 1991
  • Circadian rhythm is entrained in the 24-hour time interval by periodic factors in the environment, known as zeitgeber. But most rotating work schedules are outside the range of the entrainment of the pacemaker timing the human circadian sleep - wake cycle. It has been postulated that physiological and emotional disturbances occur in most human functions when the circadian rhythm is disturbed. So application of circadian principles to the design of shift schedules can aid in maintaining the temporal integrity of the circadian system and thereby minimize for the shift worker any detrimental consequences of circadian disruption. This study was a quasi-experimental study to test the effect of shift intervals for the clinical nurse on the circadian rhythm. Twenty nurses newly employed in general units of two hospitals were selected as an experimental group and twelve college nursing students as a control group. Both groups were selected according to an established criteria using a purposive sampling technique. Ten subjects were assigned to a weekly shift group and another ten to a biweekly shift group engaged in a semi -continuous shift schedule(sunday off) with a backward direction, that is, morning -evening - night shift. The control group worked a morning shift for 42 days. Oral temperature rhythm, waking tim, sleep - wake cycle, fatigue, and mental performance were measured during the experimental period. The data collection period was from April 30, 1990 to June 10, 1990. MANOVA, paired t-test, ANOVA, and Student Newman Keuls method were used for statistical analysis. The results are summarized as follows. 1. Phase delay in the acrophase of temperature rhythm was shown according to the backward rotating shift. A complete adaptation to work on the night shift was achieved between the sixth and ninth day of the night shift. 2. There was no difference in either waking time or sleep- wake cycle according to the duration of the working day for every shift group. Significant difference was found in the waking time and the sleep -wake cycle for subjects on the morning, evening, and night shift in both of the shift groups(weekly shift group : λ=0.121, p<0.01, λ=0.112, p<0.01, biweekly shift group : λ=0.116, p<0.01, λ=0.084, p<0.01). 3. There was no difference in fatigue between the first working day and the last working day for the control group and for the biweekly shift group. In the weekly shift group, physical fatigue was significantly different for the first day and the sixth day of the night shift(t=-2.28, p<0.05). Physical fatigue and total fatigue on the first day of the night shift showed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=5.79, p<0.01, F=4.56, p<0.05). There was a significant difference between the shift groups and the control group(p<0.05), Physical fatigue, neurosensory fatigue and total fatigue on the last day of the night shift showed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=12.65, p<0.01, F=7.77, p<0.01, F=9.68, p<0.01). There was a significant difference between the shift groups and the control group(p<0.05). 4. No difference in mental performance was seen between the first day and the last day of work in each case. An arithmatic test on the first day of the night shift revealed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=3.79, p<0.05). There was a significant difference between the shift groups and the control group(p<0.05) . The digital symbol substitution test and the arithmetic test on the last day of the night shift showed a significant difference among the control group, the weekly shift group, and the biweekly shift group(F=3.68, p<0.05, F=5.55, p<0.01), and both showed a significant difference between the shift groups and the control group(p<0.05). Accordingly, this study showed that during night duty, the waking time, sleep- wake cycle, and fatigue increased and mental performance decreased compared with morning and evening duty. It was also found that the weekly shift group had a higher fatigue score on the sixth day of night duty as compared to the -first day, but the waking time, sleep- wake cycle, and mental performance revealed no difference for the duration of the night duty or between shift groups, and complete adaptation of temperature rhythm was achieved between the sixth and ninth day of night duty. It is possible to conclude from these results that for intermediate circadian type in a healthy young woman, a biweekly shift system is more compatible with the circadian timing system than weekly shift system.

  • PDF

Development of Industrial Embedded System Platform (산업용 임베디드 시스템 플랫폼 개발)

  • Kim, Dae-Nam;Kim, Kyo-Sun
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.47 no.5
    • /
    • pp.50-60
    • /
    • 2010
  • For the last half a century, the personal computer and software industries have been prosperous due to the incessant evolution of computer systems. In the 21st century, the embedded system market has greatly increased as the market shifted to the mobile gadget field. While a lot of multimedia gadgets such as mobile phone, navigation system, PMP, etc. are pouring into the market, most industrial control systems still rely on 8-bit micro-controllers and simple application software techniques. Unfortunately, the technological barrier which requires additional investment and higher quality manpower to overcome, and the business risks which come from the uncertainty of the market growth and the competitiveness of the resulting products have prevented the companies in the industry from taking advantage of such fancy technologies. However, high performance, low-power and low-cost hardware and software platforms will enable their high-technology products to be developed and recognized by potential clients in the future. This paper presents such a platform for industrial embedded systems. The platform was designed based on Telechips TCC8300 multimedia processor which embedded a variety of parallel hardware for the implementation of multimedia functions. And open-source Embedded Linux, TinyX and GTK+ are used for implementation of GUI to minimize technology costs. In order to estimate the expected performance and power consumption, the performance improvement and the power consumption due to each of enabled hardware sub-systems including YUV2RGB frame converter are measured. An analytic model was devised to check the feasibility of a new application and trade off its performance and power consumption. The validity of the model has been confirmed by implementing a real target system. The cost can be further mitigated by using the hardware parts which are being used for mass production products mostly in the cell-phone market.

Development of the Teaching-Learning Process Plan for Process-Based Assessment in Home Economics of Middle School: Focusing on the Life Design Unit (과정 중심 평가를 위한 중학교 가정과 교수·학습과정안 개발: 생애설계 단원을 중심으로)

  • Ko, Eun Mi;Heo, Young Sun;Chae, Jung Hyun
    • Journal of Korean Home Economics Education Association
    • /
    • v.33 no.1
    • /
    • pp.101-127
    • /
    • 2021
  • The purpose of this study is to design and develop a teaching-learning process plan for process-based assessment, focusing on the unit related to life design in middle school home economics(HE: Home Economics part of 「Technology and Home Economics」), to propose a feedback plan after implementing it, and to evaluate the plan through participatory observation and interviews. The student reflection journals, teacher's class journals, participatory observation journals, interviews, and performance tasks, were collected and analyzed to provide foundational date to be utilized for feedback to students, and class improvement. The research results are as follows: First, the developed teaching-learning process plan consists of a total of 8 sessions, i.e. 2 sessions for each of the four learning themes, under the practical question of "What should I do to live the life I want?" The portfolio was composed of five evaluation topics and for evaluation, oral presentation, observational evaluation, self-assessment, and peer evaluation were considered. Second, during the class, feedback from teachers, feedback from fellow students, feedback through results, and a plan to record them were provided. Third, from the analysis of collected data including observation journals and interviews, it was apparent that the students recognized the necessity of process-based assessment after the class, and students acknowledged that through the process-based evaluation in which they are evaluated on the efforts they made and provided with feedbacks, they participated more in class, and it lead them to experience a sense of growth and a feeling that they took a step forward into their future. Teachers suggested that the class through feedback was suitable for the unit and the capacity of the class, but the difficulty they experienced in giving feedback was presented as a disadvantage. For the process-based assessment, follow-up research is needed on various ways to provide feedback on-line and off-line through changes in the perception of assessment.