• 제목/요약/키워드: OVERSEAS CONSTRUCTION PROJECT

검색결과 222건 처리시간 0.022초

교통시설 상호연관성 분석방법론 개발 (Development of the Analysis Methodology for Interrelationship between Transportation Facilities)

  • 남궁백규;정성봉;장유진
    • 한국도로학회논문집
    • /
    • 제15권3호
    • /
    • pp.169-176
    • /
    • 2013
  • PURPOSES : Lots of criticism such as over/duplication investment, inconsistency of the policies among local governments and national plans etc. has been aroused due to the policy of supply-driven construction for transportation facilities. Recently, according to the environmental-friendly transportation policy, the investment of railroad has been expanded gradually, however the duplication with existing road facility makes it difficult to construct railroad. Thus it is necessary to evaluate the interrelationship between new project and existing facilities in the planning stage. However the method and the criteria for analyzing the duplication and over-investment of projects are not established in the manual, thus the feasibility of these projects are carried out from the economic point of view. METHODS: First, It reviewed about interrelationship criteria(domestic, overseas) and proposed implications and this study directions. Next, It developed the methods of evaluating independency, competitiveness and complementarity. RESULTS : In this study, the methods of evaluating independency, competitiveness and complementarity etc. are suggested to analyze the interrelationship between transportation facilities. The case study was carried out to examine the applicability of the methods. CONCLUSIONS: The methods raise rationality of decision-making compared to existing one. In the future, these methods are introduced into the manual of pre-feasibility study and feasibility study, more efficient decision-making and investment are expected.

Analysis of soil resistance on drilled shafts using proposed cyclic p-y curves in weathered soil

  • Jeong, Sangseom;Park, Jeongsik;Ko, Junyoung;Kim, Byungchul
    • Geomechanics and Engineering
    • /
    • 제12권3호
    • /
    • pp.505-522
    • /
    • 2017
  • A fundamental study of drilled shafts-soil systems subjected to lateral cyclic loading in weathered soil was conducted using numerical analyses. The emphasis was on quantifying the soil resistance of laterally cyclic loaded pile using 3D finite element analysis. The appropriate parametric studies needed for verifying the cyclic p-y characteristic are presented in this paper. A framework for determining the cyclic lateral load transfer curve (p-y curves) on the basis of numerical analyses is proposed. Through comparisons with results of field load tests, the three-dimensional numerical methodology in the present study is in good agreement with the general trend observed by in situ measurements and thus, represents a realistic soil-pile interaction for laterally loaded piles in soil than that of existing p-y method. It can be said that a rigorous present analysis can overcome the limitations of existing cyclic p-y methods to some extent by considering the effect of realistic three-dimensional combination of pile-soil forces. The proposed cyclic p-y curve is shown to be capable of predicting the behavior of the drilled shafts in weathered soil.

중소제조업의 협업공정관리시스템 구축 적용 사례 (A Case Study on the Construction e-Collaboration Process Control System of Middle and Small Manufacturing Industry)

  • 김종태
    • 산업경영시스템학회지
    • /
    • 제32권2호
    • /
    • pp.13-20
    • /
    • 2009
  • The purpose of this paper is to give information on e-CPC implementation in the manufacturing industry by studying and analyzing a small and medium sized manufacturing company. After analyzing Various factors on J's e-CPC implementation such as environmental factors, process management factor, and result factors, success factors on J's e-CPC implementation are analyzed. The results of this paper can be summarized as follows. First, the most leading role on J's ERP implementation is the will and support of CEO and team leaders. They led the implementation to be stability successfully by settling the different opinions among teams, showing their ability on process decision and communication with consultants. Second, J tried to prompt system stability by mapping out and conducting the long term change management strategy. Third, J organized ERP project team to implement ERP quickly, and it turned out to be successful Finally, J tried to get outside information from consultants and collaborative companies that have experience in implementing ERP. Especially J made full use of overseas consultants. In respect that this paper giver lots of information on e-CPC implementation in manufacturing industry by a case study of a small and medium sized manufacturing company which has not been carried out so far, it would be useful enough.

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • 한국암반공학회:학술대회논문집
    • /
    • 한국암반공학회 2008년도 국제학술회의
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF

하수처리시설 대수선비 자산화 영향분석 및 제도개선 방안 (Improvement for Asset Management of Sewage Treatment Facilities)

  • 박하진;안만선;조남호;김경주
    • 대한토목학회논문집
    • /
    • 제31권2D호
    • /
    • pp.285-293
    • /
    • 2011
  • 국내 하수처리시설의 발전으로 인해 최근 유지관리 측면에서의 중요성이 높아지고 있으나, 국내 여건의 부족으로 인해 하수처리 시설의 자산관리가 제대로 정착되지 못하고 있다. 현재 수많은 하수처리시설이 가동 중에 있음에도 불구하고 운영비용의 정확한 통계와 분석, 특히 대수선비와 보수비에 있어서는 대부분의 지방자치단체에서 일반 경상수선비 또는 보수비 하나로만 집계하고 있으며, 민간투자사업으로 시행되고 있는 사업들은 정부기관이나 어떠한 민간기관에서도 운영비용 산정에 있어 명확한 기준에 의해 분석이 이루어지지 못하고 있는 실정에 있다. 본 연구에서는 현재 수행된 하수처리시설 대수선비를 자산화 할 경우의 영향을 분석하여 자산관리의 효율성을 분석하였다. 또한 대수선비 산정에 있어서의 현행 문제점을 분석하고, 제도개선 방안을 제시하였다.

클라우드 기반의 인프라 엔지니어링 설계 플랫폼 프로토타입 개발 (Development of a Cloud-Based Infrastructure Engineering Design Platform Prototype)

  • 조명환;표길섭;윤승욱;정남정
    • 대한토목학회논문집
    • /
    • 제42권4호
    • /
    • pp.559-569
    • /
    • 2022
  • 건설 엔지니어링은 과학기술과 지식을 접목하여 고부가가치와 일자리를 창출하는 대표적인 산업이지만 그 중요성이 저평가 되고 있다. 국토교통부의 자료에 의하면 엔지니어링 산업의 부가가치율(65.3 %)과 고용유발계수(14명 고용/10억 원)은 제조업의 3배 이상이다. 특히 시공 이전의 프로젝트 관리·기본설계 등 전방가치사슬은 총사업비의 10~15 % 미만임에도 불구하고 인프라 시설의 전체 가격과 품질을 좌우한다. 본 연구에서는 인프라 엔지니어링 플랫폼을 프로젝트 단위가 아니라 엔터프라이즈 수준의 플랫폼으로 개발하기 위하여 필요한 프레임워크, 도로 설계 업무 분류, 설계 지원 모듈 및 데이터베이스 구축 방향에 대하여 제시하고, 이를 바탕으로 클라우드 기반의 설계 플랫폼의 초기 버전을 개발하였다. 개발된 설계 플랫폼은 시간/공간 제약 없는 웹 기반 설계 업무환경을 제공하고, 해외사업 수주 및 경쟁력 확보에 크게 기여할 수 있을 것으로 기대된다.

건설기계 시간당작업량(Q) 산정 개선방안 -펌프준설선 작업효율(E)을 중심으로- (The estimating method of construction workable-quantity per unit time - Focused on Pump-Dredge -)

  • 안방률;태용호;서상욱
    • 한국건설관리학회논문집
    • /
    • 제11권3호
    • /
    • pp.125-133
    • /
    • 2010
  • 국내 공공건설공사 예정가격작성기준에서 제시하는 건설기계의 시간당 작업량(Q)의 중요한 부분을 차지하는 작업효율(E)은 현장여건 등에 따라 차이가 발생하기 때문에 적용기준이 명확해야 한다. 그러나 국내 기준은 정성적인 표현이 사용되며, 이를 판단할 수 있는 기준 또한 포괄적이고 모호하여 설계자의 주관적이고 자의적인 판단에 따라 설계가 이루어지고 있는 실정이다. 본 연구에서는 펌프준설선을 대상으로 국내 외 관련 문헌조사 및 현장실사를 통하여 합리적인 작업효율(E) 제시방법을 제안하고 이로 인해 건설기계의 시간당 작업량 산정방법을 개선하고자 하였다. 문헌조사를 통해 국내기준 또한 일본기준의 형태로 작업효율(E)을 공사구분별, 흙두께, 평면형상, 단면형상, 해상조건 등으로 세분화 시킬 것을 제시하였으며, 이를 판단할 수 있는 기준도 객관화 시킬 수 있는 형태로 개선되어야 할 것을 제시하였다. 또한, 현장조사를 통해 얻어진 산출량을 일본의 예정가격작성기준을 적용하여 계산된 산출량과 비교하여 일본기준의 적정성을 검토하였다. 펌프준설선 (4,476kW)은 배송거리 3,600~6,000m의 시간당 준설량(Q)을 실측하여 표준값인 전동환산(q)을 비교하여, 일본대비 102.3% 수준으로 거의 유사한 결과값을 얻었다. 본 연구를 통해 제시된 각종 자료 및 수치들은 건설기계와 기술의 급속한 발전을 예정가격작성기준에 적용할 수 있는 기초가 될 수 있을 뿐 아니라, 관련 연구의 토대가 될 수 있으리라 기대한다.

터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석 (Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria)

  • 박광준;윤경렬
    • 한국터널지하공간학회 논문집
    • /
    • 제20권6호
    • /
    • pp.1073-1090
    • /
    • 2018
  • 국내 공동구는 주로 신도시 개발사업에 포함되어 건설되었기 때문에 모두 개착 BOX 형태를 이루고 있으나 기존 시가지를 대상으로 독자적 공동구를 건설 중인 해외의 경우 터널식 공동구 형태를 주로 채택하고 있다. 공동구의 사회적 요구가 큰 중심가 도심지는 교통량이 많아 장기적으로 차로를 차단하거나 우회 차로 설치가 곤란한 것이 일반적이므로 터널식 공동구 설치가 합리적이라 하겠다. 이러한 터널식 공동구 활성화를 위해 공동구 최적 설계용량 및 수용시설(전력, 통신, 상수도 등)별 상호 영향인자(열간섭 및 전식, 유지관리 효율성 등)를 고려한 최적화된 단면설계 기술력을 확보할 필요가 있다. 터널식 공동구의 최적단면 설계기술이란 결국 공동구내 수용시설의 최적 배치기법을 도출하는 것이라 할 수 있다. 이러한 설계기법 도출을 위해 우선적으로 해외의 터널식 공동구(Shield TBM, Conventional Tunneling) 내공단면 적용 사례를 조사하여, 단면 내 수용시설의 배치현황, 부대시설 설치 등의 특징을 분석하고, 또한 국내 외의 공동구 설계기준 및 지침서에서 제시하고 있는 내공단면 설계(배치)와 관련한 기준사항들을 정리 분석할 필요가 있다.

재난통신 체계에 따른 품질요건 재설계에 관한 연구 (A Study on Re-design of Quality Requirements for Disaster Communication Systems)

  • 양정모;김정호
    • 디지털융복합연구
    • /
    • 제13권10호
    • /
    • pp.327-335
    • /
    • 2015
  • 재난통신망은 TETRA(TErrestrial Trunked RAdio)에서 대용량 데이터 통신이 가능한 광대역 이동통신 기술인 Public Safety-LTE(Long Term Evolution) 자가망을 활용하는 방향으로 발전하고 있다. 국내에서는 재난재해 대응기관 간의 일원화된 통신체계 유지를 위해 재난안전통신망 구축사업을 추진하고 있으나, 재난재해 현장에 위치한 피해당사자와의 통신을 고려하지 않고 재난재해 대응기관 간 지휘통제를 중심으로 통신망을 구축하고 있다. 본 연구에서는 국내 재난통신망 구축동향과 해외 선진사례를 해석하여 전 범위 재난통신망 구축을 위한 쟁점을 도출하고 통신주체와 목적에 따라 재난통신 영역을 새롭게 정의하여 재난통신 영역을 통제통신, 대응통신, 현장통신, 당사자통신, 경보통신으로 세분화하였다. 본 연구를 통하여 재정의 된 재난통신 영역의 특성을 분석하고 이에 따른 핵심 품질요건을 재설계하여 영역별 음영지역 없는 전 범위 재난통신 체계 구축방안을 수립하였다.

도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석 (Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea)

  • 김태송;서용칠;이상범;구재동;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.216-221
    • /
    • 2008
  • 본 연구는 유럽, 미국, 일본 등 선진외국에서 시행하고 있는 성능보증계약제도 현황을 살펴보고 이 제도의 국내 도입을 위한 타당성 및 가능성을 검토하기 위해 수행되었다. 이를 위해 성능보증계약제도의 개념 및 필요성, 국내외 성능보증계약제도 현황을 조사, 분석하였다. 특히 이들 나라들의 하자담보책임제도의 보증업무, 설계시공일괄입찰 계약제도의 운영현황, 낙찰자 결정방식, 성능보증수단, 공사계약의 유지관리 업무, 성능보증시방서 및 계약조건을 비교 분석하였다. 그리고 성능보증계약제도를 도입하기 위한 방안으로서 하자담보책임제도 외에 성능보증계약제도 별도 운영, 설계시공일괄입찰계약제도의 수정 활용, 공사낙찰제도의 보완, 성능보증수단 확보, 유지관리업무를 포함하는 공사계약의 필요성을 제시하였다.

  • PDF