The Journal of The Korea Institute of Intelligent Transport Systems
/
v.10
no.2
/
pp.35-41
/
2011
The national police agency has executed the project for the advancement of traffic control and operation systems in order to mitigate chronic traffic problems and to meet the global standards regarding the traffic control and operation systems. This study effort was initiated to evaluate the effects of various policies proposed for the advancement of traffic control and operation systems. The evaluation results indicated that the policies proposed for the advancement of traffic control and operation systems showed apparent and positive effects in terms of transportation mobility and safety. However, there have been many difficulties to overcome in order to settle down the policies proposed for the advancement of traffic control and operation systems as smooth as possible. For example, the violation of intersection passing method has been increased after the implementation of the advancement of traffic control and operation systems in majority of evaluation sites. In addition, lacks of awareness as well as improper operations of the advancement of traffic control and operation systems have caused drivers' confusions, which generated more traffic congestion and risks. Currently, the policies for the advancement of traffic control and operation systems focused on the improvements of traffic signal operations, including leading through movements and permissive left-turns. However, synergy effects may be expected if all of the policies including the improvements of traffic signal operations are executed together.
Conventional treatment of Hirschsprung's disease consists of initial colostomy followed by pull-through operation. But, the treatment of Hirschsprung's disease has been changed along with the development of new surgical technique. Since 1995, endo-GIA has been available at our hospital and one stage Duhamel operation has been performed for neonatal Hirschsprung's disease. Between May 1995 and April 2006, 26 neonates have been treated with one stage pull-through operation by one pediatric surgeon at HanYang University Hospital. The sex ratio was 4.2:1 with male predominance. Clinical findings included abdominal distension (96.2 %), vomiting (50.0 %), delayed passage of meconium (46.2 %), constipation (23.1 %), and enterocolitis (15.4 %). Twenty two cases (84.6 %) were short-segment and 4 cases (15.4 %) were long-segment disease, of which 2 cases were total colon aganglionosis. One of the two patients with total colonic aganglionosis had double transition zones - distal ileum and hepatic flexure of the colon. The average age at operation was $14.56{\pm}8.77$ days and the average weight at operation was $3.26{\pm}0.66kg$. Primary Duhamel operations were performed in 25 patients and Soave-Boley operations was performed in one patient. The endo-GIA 35 (Ethicon, USA) was used from 1995 until 1997, and after that endo-GIA 60 (USSC, USA) was used. The average Duhamel operation time was $88.57{\pm}22.80$ minutes. Wound abscess (n = 2) and septum formation (n =1) occurred after Duhamel operation. Bowel function was normalized in 59 % within 3 months and in 95% within 1 year after operation. There was no mortality after one stage pull-through operation in neonate.
For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.
This study aimed to obtain quantitative data for WWTP operators in phosphorus removal process. This was done by reviewing and comparing phosphorus removal efficiency(%), coagulants dosage(Al/P and $Al_2O_3$(mg/L)), sludge production($kg/m^3$), and operation cost($won/m^3$) of start-up and normal operation data. Phosphorus removal efficiency of all tertiary treatment process was up to 70 ~ 89 % in start-up and normal operation. Average molar ratio(Al/P) was similar as 5 in both operations, but average coagulants dosage (mg/L) of start-up (8.5 mg/L) was higher than normal operation (6.2 mg/L). Average operation cost was higher for start-up ($33.6won/m^3$) than normal operation ($28.4won/m^3$), while electricity cost required for the normal operation ($9.0won/m^3$) was higher by $3.5won/m^3$.
Kim, Hee-Wan;Jung, Jun;Kim, Dong-Soo;Rhee, Hae-Kyung;Han, Ki-Joon
Journal of Digital Convergence
/
v.10
no.11
/
pp.185-196
/
2012
Information system operation principles were recently established in order to provide high quality service and efficient operation audit of IT outsourcing. Operation managements are done based on these principles. Therefore, information operating management process, which refers to itself, is established. Information system operation audit requires a constant audit regularly, which is different from construction/development audit that is done only once. As operating management process changes, operation audit guidelines should be updated and improved. Therefore, this paper proposes IT outsourcing operation audit model with IT outsourcing achievement management as a focus. IT service domain was referred in order to propose information system operation audit model and check lists, which are based on IT outsourcing operation managements such as planning, making strategies, contract, service, and management. The deduced audit model and check lists verified suitability of the proposed model by experts' survey.
The goal of this study is the comparison of upper airway size and change of skeletal Class I group and skeletal Class III group (before operation, within 2 weeks after operation, 6 months after operation) respectively. At first, we measured the lines between selected upper air way landmarks on lateral cephalometric x-ray film of skeletal Class I 40 persons whoes age were 23-26 years old, ,and did the same lines of landmarks of skeletal Class III 44 persons who had not been operated yet, were within 2 weeks after operation, were 6 months after operation. And we compared it respectively and analyzed it with paired t-test. We studied the relationship of those on produced data. 1. Skeletal Class III group was narrower in nasopharyngeal air way space than that of skeletal Class I group, and increased in thickness of oropharyngeal, hypopharyngeal wall within 2 weeks after operation, and reduced in nasopharyngeal, oropharyngeal air way space, and did in thickness of nasopharngeal, hypopharyngeal wall 6 months after operation. 2. Skeletal Class III group reduced in nasopharyngeal, oropharyngeal air way space, and increased in thickness of nasopharyngeal, oropharyngeal, hypopharyngeal wall within 2 weeks after operation, restored the thickness of nasopharyngeal, oropharyngeal wall, but did not restored nasopharyngeal, oropharyngeal, hypopharyngeal air way space. 3. Vertical length from hyoid bone to mandibular plane did not have signifacant difference from Class I group but after operation, it increased more than Class I group significantly. 4. The size of airway reduced after operation. Among this, oropharyngeal airway most reduced.
The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.
In this study, the efficient reservoir operation is studied by comparing results from reservoir operation using a basin drought forecasting and warning system with an existing reservoir operation rule. As a result, it is found that the reliability and average annual storage of reservoir operation using a basin drought forecasting and warning system and release coefficients is better than those of reservoir operation using the existing operation rule. The release coefficients for Yongdam dam located in the Geum river basin selected as a case study are found to be the most effective for the value of 0.95 for the drought watch, 0.9 for the drought warning and 0.85 for the drought emergency. The reservoir operation using a drought forecasting and warning enables the use of the limited water resources effectively during drought and will contribute the national water resources management.
Because of the limitation of controllable operation variables for the wastewater treatment process with variable hydrodynamic flow patterns, it may preclude the use of this type of nutrient removal activated sludge process. As the operation variables, only temperature and dissolved oxygen (DO) have been used to operate the process. This study made an effort to improve treatment efficiency and operability of the process by the following methodologies: 1) process and operation data analysis using process simulation, 2) determination of optimal control logic or algorithm using a pilot-scaled experimental apparatus and its operations, and 3) application of experimental and simulation results to find the optimal process operation modes. In this study, it was found that the optimal operation mode named 'save mode' in the basis of process variables, such as the ammonia-nitrogen concentration of inlet flow, temperature and flow rate, can reduce the operation cost comparing with the present normal operation mode. And the stable conditions in nitrification were also shown by the proportional control of DO with the inlet air flow rate of blower and the mixing rate of mechanical aeration.
Purpose: Generally, since the population density is lower in suburban areas, the distance to school is inevitably long. Therefore, schools in suburban areas often operate school buses to improve student welfare. However, since school buses are usually used only during going to and from school, the utilization rates are relatively low. Therefore, this study aims to establish integrated operation plan of public school bus covering all schools. Methods: It is necessary to decide which school buses will serve the specific demand node which want to go to certain school in order to design an integrated operation plan for school buses. Therefore, a mathematical model is developed for minimizing the total number of vehicles and the distance of transportation by reflecting the characteristics of school buses and students as constraints. To solve the proposed mathematical model, CPLEX, a commercial solver, is applied. Results: To validate and to confirm the proposed process, numerical example is designed with the comparison between before and after integrated operations of school buses in terms of total operation cost. The result shows that the integrated operation can lead the reduction of the number of school buses as well as the decreasing of the fuel cost. Conclusion: This study provides the quantitative method to perform the integrated operation of school buses in suburban areas. The optimal operation strategy is required because there are more complex decision-making elements considering the integrated operation. It is expected to apply this research result at real situation to expand this services based on an optimal operation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.