조선 및 해운·물류 분야의 디지털 전환은 자율운항선박의 도입 및 선박의 운항방식의 변화를 이끌 것으로 예상된다. 기존 운항방식과 함께 자율운항, 원격운항 등 다양한 운항형태가 공존하며, 선박 운용 프로세스의 전환과 새로운 이해관계자의 등장이 전망된다. 본 논문에서는 선박 운항방식 변화에 따른 미래 선박 운항 프로세스를 분석하고, 미래 선박의 운항환경 변화를 예측하여 주요 업무별·이해관계자별 기능요건을 도출하고자 한다. 델파이 기법을 활용하여 항해 및 화물운송 계획 수립단계부터 최종 목적항 입항 및 화물 하역단계까지 선박 운항 시나리오를 구성하고, 업무별, 수행 주체별 미래 업무 변화를 예측했다. 원격운항, 자율운항 등으로 선원의 개입이 최소화될 것이며, 각 분야의 전문가가 선박 운항의 다양한 측면에서 책임과 의무를 갖게 될 것으로 예상된다.
This study was attempted to provide us with basic information on how to improve understanding with patients for operation, and to offer then better nursing and treatment. This kind of study will help scientific application to nursing practice and operating room. The data was collected by interviewing 29 patients who underwent the elective surgery under the general anesthesia at Y hospital in Seoul. The interview ran from October 15 to December 15, 1989. The research instrument was a anxiety measurement device (SAAI) originally developed by Spielberger, et al and modified by Jung-Tack Kim. 1. Hypothesis Testing Hypothesis one was that there would be a difference in state anxiety level according to a time difference in watiting for operation. This hypothesis was rejected(state.anxiety level one hour before operation P>.05, r-.747, State anxiety level half an hour before operation P>.05, r-.1550, state anxiety level just before operation, P>.05, r=.1099). However, state anxiety, evel appeared to be associated with a longer watiting period, like one day before operation (P<.05, r-.4628). Hypothesis two was that there would be a difference according to state anxiety level of patients for operation. This was rejected. (Change of blood perssure in systolie P>.05 r=.1082, Change of blood pressure in diastolic P>.05, r=.088, Change of pulse rate, P>.05, r-1.909) 2. Examining trait anxiety and state anxiety levels, the average level of trait anxiety was 42.034, and the average level of state anxiety one day before operation was 43,000. The average level of state anxiety was averaged 42.356 in a waiting room for operation. 3. Examining the state anxiety level by time period, the one hour before was 42.379 the level half an hour before 42.276, and the level just before operation 42.414. The low level of state anxiety was due to the fact that premedication was not eliminated. 4. Age and time period like one day before operation was related to state anxiety level (F=5.271, P<.0.01) and blood pressure in waiting room for operation. That is, state anxiety level and blood pressure of patients one day before operation appeared high. Sex was relation to changes of blood pressure ; the blood pressure of male patients appeard higer than of female patients. A marital status was also related anxiety level one hour before operation the married patient for operation showed a higher state anxiety level than that of the unmarried patient for operation. Education was similarily related to trait anxiety level in which highly educated patients show lower levels of trait anxiety than poorly educated ones. Motive for hospitalization was related to state anxiety level for patient one hour before operation (F=6.464, P<.05) likewise, patients who are supposed to undergo operation hastily showed higher levels of anxiety than patients who expect elective surgeries.
최근 컨테이너선의 대형화 추세와 항만간의 경쟁 가속화로 인해 컨테이너터미널의 효율적 운영과 생산성 향상에 대한 관심과 노력이 증대되고 있다. 특히 YT를 이용한 이송방식을 채택하고 있는 터미널의 경우 AGV(Automated Guided Vehicle)를 이용하고 있는 자동화터미널에 비해 상대적으로 경제성 및 운용효율성 측면에서 불리한 것이 사실이다. 최근 10여 년간 이와 같은 YT운용의 비효율성을 보완하기 위해 YT Pooling Operation 도입과 같은 노력이 계속되어 왔으나 개별 YT의 위치인식기능부재로 인한 제약으로 실질적인 효과는 미미한 수준이었다. 본 연구에서는 최근 주목받고 있는 RTLS(Real Time Location System) 기술을 활용하여 기존 YT Pooling Operation의 제약사항을 해결하는 새로운 개념의 YT Dynamic Operation 모델을 세안한다.
Path planning for field operation of agricultural machinery is an indispensible part for precision farming or autonomous field operation. In this study, two algorithms (I, II) of generating a time-based shortest operation path were suggested to plan an optimal operation of an agricultural tractor-implement in a rectangular shaped field. The algorithms were based on modification of a minimum spanning tree algorithm, and applied for tractor-implement operations. the generated path was consisted of round operation and returning operation sections. The number of round operation was determined from the condition that a tractor can turn smoothly at headlands. The performance of the algorithms was evaluated by the calculation number for path generation and the total path length generated. Their stability was affected by the number of returning operation, but the algorithm II was considered to be more stable. In addition, the performances of the developed algorithms were compared with those of the conventional field operations at selected field sizes and shapes. The results showed that the algorithms could reduce field operation time greatly. For a 100m$\times$40m field, the reduced path length was 78m. The study also included an user interface program for implementing the algorithms and generating GPS coordinates that could be used in GIS softwares for precision farming.
The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.
A analysis of CPK & LDH Isoenzyme was done on the consecutive patients undergoing thoracic operations from July 1982 to October 1982 in the Department of Thoracic and Cardiovascular Surgery, Capital Armed Forces General Hospital. Eighteen patients were analysed by three groups, such as open heart surgery [group A], major thoracic operation [group B] , minor thoracic operation group [group C]. In all patients serial determination of total level and Isoenzyme of CPK, LDH wad done on preoperative operative and up to 8th post-operative day, The results obtained are as follows. 1. The average value of serum CPK before the operation was 61 IU/L. The value of serum CPK was increased following the operation mainly MM portion and reached to the maximal level of 536107 IU/L in A group 1200191 IU/L in B group, 306150 IU/L in C group on the first postoperative day. The enzyme activity was gradually decreased thereafter and returned to the normal range on the 3rd or 4th day after the operation. 2. The average value of serum LDH before the operation was found to be 83 IU/L. The value was increased during the operation and reached to the maximal level of 481108 IU/L in group A, 14827 I U/L in group B, 10035 IU/L in group C on the second day after the operation. The enzyme activity was gradually decreased thereafter and returned to the normal range on the seventh day after the operation. The enzyme activity was dependent to the duration of operation, severity of muscle damage, type of thoracotomy, effect of extracorporeal circulation, state of disease.
버스 운행 정시성은 운행계획에 따라 정시에 운행하는 정도를 나타낸다. 이용자의 대기시간은 버스 운행의 정시성에 직접적으로 영향을 받기 때문에 정시성지표는 이용자 관점에서 버스 운행의 신뢰성을 평가하는 지료로 가장 널리 사용되는 평가척도 중 하나이다. 그러나 실제 버스 운행은 도로여건, 교통상황, 승객수요 등 여러 가지 상황에 의해 사전에 작성된 운행 계획을 준수하지 못하게 된다. 따라서 여러 가지 상황에 따라 버스 운행의 정시성을 평가할 수 있는 정시성 지표를 개발하여 제시한다. 또한 서울시에서 운행하는 여러 버스 노선의 운행 자료를 분석하여 정시성 지표를 산출하였으며 이를 통해 여러 가지 운행 여건에 따른 정시성지표의 변화 특성을 분석하였다.
This study was conducted to propose an effective port operation method in terms of the design capacity of waiting anchorage by comparing the ratio and the number of waiting anchorage according to the port operation method of Busan New Port. For this, the Arena simulation program compared the rates of waiting vessels according to the application of the multi-user terminal, liner terminal and hybrid liner terminal operation methods. As a result, analysis suggested the necessary anchorage space can be reduced to about 18 % when using the multi-user terminal operation method and about 15.6 % when using the hybrid liner terminal operation method, as compared with the liner terminal operation method. Specifically, it was effective to apply the multi-user terminal operation method in terms of the anchorage capacity to be designated to Busan New Port. This study can apply to the designation of the new anchorage in the Busan New Port by reflecting the contents of the design of the anchorage in accordance with the port operation method.
This paper describes the result of endurance test on the Sangju test track. The purpose of the test is to prove the endurance of the Korean EMU for the commercial operation. Test conditions are more severe than actual operation on the commercial line. As of October, test result is good without severe problems. After 100,000km of test operation, the EMU will be delivered to operation cooperation for th commercial operation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.