• Title/Summary/Keyword: ODBC technique

Search Result 4, Processing Time 0.018 seconds

Development of a Management System for Image and Personal Information for the Development of a Standard Brain for Diverse Koreans (다양한 한국인의 표준뇌를 개발하기 위한 영상 및 개인정보 관리 시스템의 개발)

  • 정순철;최도영;이정미;박현욱;손진훈
    • Journal of Biomedical Engineering Research
    • /
    • v.25 no.1
    • /
    • pp.77-82
    • /
    • 2004
  • The purpose of this study is to establish a reference for image acquisition for completion of a standard brain for diverse Korean population, and to develop a management system that saves and manage database of the acquired brain image and personal information of those who were tested. 3D MP-RAGE technique, which has excellent SNR and CNR and reduces the times for image acquisition, was selected for anatomical Image acquisition, and parameter values were obtained for the optimal image acquisition. The database management system was devised to obtain not only anatomical image data but also subjects' basic demographic factors, medical history, handedness inventory state-trait anxiety inventory, A-type personality inventory, self-assessment depression inventory questionnaires of Sasang Constitution Mini-Mental State Examination, intelligence test, and personality test via a survey questionnaire and to save and manage the results of the tests. In addition, this system was designed to have functions of saving, inserting, deleting, searching, and Printing of image da a and personal information of subjects, and to have accessibility to them as well as automatic connection setup with ODBC. This newly developed system may have major contribution to the completion of a standard brain of diverse Korean population in that it can save and manage their image date and personal information.

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

Integrated Communication and Control System for Cranes (크레인 제어를 위한 통합 네트워크 및 제어 시스템)

  • Kim, Eung-Seok;Kim, Moon-Cheol;Huh, Woo-Jung;Shin, Kyung-Bong;Park, Jung-Min;You, Bum-Jae;Cho, Young-Jo;Kim, Kwang-Bae;Ryu, Hae-Young;Ahn, Byung-Gyu
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1257-1259
    • /
    • 1996
  • In this paper, we introduce an integrated communication and control system(ICCS) for control of a crane. The system is integrated with a compasite technique as a network interfacing, a user interfacing and a system control for continuous process like as a container crane. The field-bus(Profibus) network module is used to interconnect each input/output module with main control unit. The MMI system for user interfacing is integrated with an ODBC-based data management tool and IECl131-based control logic design tool(Soft-Logic Designer:SLD). The each programmed control task in the main Controller is executed using a petri-net based scheduler.

  • PDF

Development of a Monitoring System for Batch Gas Manufacturing Processes (회분식 가스 제조 공정용 실시간 감시 시스템의 개발)

  • Lee Young-Hak;Lee Don-Yong;Han Chong-hun
    • Journal of the Korean Institute of Gas
    • /
    • v.2 no.3
    • /
    • pp.54-59
    • /
    • 1998
  • As distributed control systems (DCS) and plant information systems (PIS) are introduced into gas industries, process monitoring systems based on process data have attracted significant interests. However, these technologies have not been fully due to strong nonlinearities of batch processes. The multiway principal component analysis, which has been recently developed, has solved these problems and has been widely used in the industries. However, the lack of statistical background of process operators has been one of major obstacles for maximum utilization of the technology This paper introduces a real time monitoring system for batch gas manufacturing processes that offers a variety of tools that operators can understand and use without serious difficulties. The proposed integrated system covers the whole spectrum of monitoring and diagnosis that include data collection, monitoring and diagnosis. The developed system has been verified to be very effective for monitoring and diagnosis using its application to the construction of monitoring system for a typical industrial batch reactor.

  • PDF