A Case Study on Malfunction of OCGR and Inaccuracy of Watt-hour Meter in Distributed Generation System (분산형 발전고객의 OCGR오동작 및 과부족 계량에 대한 사례연구)

  • Shin, Dong-Yeol;Park, Yong-Woo;Cha, Han-Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1349-1355
    • /
    • 2008
  • The paper shows the analysis of operating conflict of OCGR trip events and metering errors in the photovoltaic generation, wind generation distributed generation customers with no defect of the distributed generation facilities, which are connected to 22.9kV distribution lines. To analyze problems with metering errors and OCGR fault event, a power quality analyzer and PSIM program were used to test the field and to simulate in Sun-Cheon photovoltaic generation and Seo-Cheon photovoltaic generation customers. With the trial distribution line, the result of analysis was verified to prove with the same situation of the actual field. This paper suggests short term and long term countermeasures of OCGR fault events, analysis of over and shortage of metering errors in distributed generation customers.

A Study on the Over Current Relay Misoperation in Power System with Distributed Generations (분산전원 연계 계통에서의 과전류계전기 오동작에 관한 연구)

  • Park, Jong-Il;Lee, Kyebyung;Park, Chang-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.12
    • /
    • pp.1705-1710
    • /
    • 2018
  • This paper deals with an analysis of the causes of over current relay(OCR) misoperation in power system with distributed generations(DG). In general, Y-D and Y-Y-D transformer connections are used for grid interconnection of DG. According to the interconnection guideline, the neutral point on Y side should be grounded. However, these transformer connections can lead to OCR misoperation as well as over current ground relay(OCGR) misoperation. Several researches have addressed the OCGR misoperation due to the interaction between transformer connections and zero-sequence voltage of distribution system. Recently, a misoperation of OCR at the point of DG interconnection to the utility system has been also reported. With increasing the interconnections of DG, such OCR as well as OCGR misoperations are expected to increase. In this paper, PSCAD/EMTDC modeling including DG interconnection transformer was performed and various case studies was carried out for identifying the cause of OCR misoperation.

A Study on Fault Characteristics of DFIG in Distribution Systems Based on the PSCAD/EMTDC (PSCAD/EMTDC를 이용한 풍력발전의 배전계통 사고특성에 관한 연구)

  • Son, Joon-Ho;Kim, Byung-Ki;Jeon, Jin-Taek;Rho, Dae-Seok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.2
    • /
    • pp.47-56
    • /
    • 2011
  • Korea Ministry of Knowledge Economy has estimated that wind power (WP) will be occupied 37% in 2020 and 42% in 2030 of the new energy sources, and also green energies such as photovoltaic (PV) and WP are expected to be interconnected with the distribution system because of Renewable Portfolio Standard (RPS) starting from 2012. However, when a large scale wind power plant (over 3[MW]) is connected to the traditional distribution system, protective devices (mainly OCR and OCGR of re-closer) will be occurred mal-function problems due to changed fault currents it be caused by Wye-grounded/Delta winding of interconnection transformer and %impedance of WP's turbine. Therefore, when Double-Fed Induction Generator (DFIG) of typical WP's Generator is connected into distribution system, this paper deals with analysis three-phase short, line to line short and a single line ground faults current by using the symmetrical components of fault analysis and PSCAD/EMTDC modeling.

A Study on the Integrated Monitoring of a Leakage Current of the Grounding Wire of Neutral Point of the Low Voltage Side of Transformer (변압기 저압측 중성점 접지선의 누설전류 통합 감시에 관한 연구)

  • Hong, Soon-Seuk;Park, Joon-Yeol;Lee, Jung-Eun;Choi, Kyung-Han
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.5
    • /
    • pp.106-113
    • /
    • 2010
  • If leakage current is neglected, it can become a cause for disasters such as electric shock and fire, therefore a continuous monitoring is necessary. However in most cases, because management of substations is performed by unmanned systems, or walk-around inspections, continuous monitor is difficult. So when an accident occurs and the cause is not immediately resolved causing the emergency generator's OCGR getting activated by the leakage current that in turn cut off the ACB, the emergency generator may stop working. To prevent such a problem, a real-time integrated monitoring system for monitoring the leakage current returning to the grounding wire of neutral point of the low voltage side of transformer is proposed. Therefore in this paper, the effects of flow of leakage current, which is caused by insulation degradation phenomena or insulation destroy phenomena, were identified by simulation. And through cases studies; the excellence of integrated monitoring system was verified.

Calculation of the Harmonic Emission Limit for low-Voltage Electrical Equipment (국내 저압 전기기기의 고조파 유출 제한값 산정)

  • Kang, Moon-Ho;Song, Yang-Hoi;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.56-61
    • /
    • 2008
  • Because the harmonic disturbance characteristic which makes voltage drop and the deterioration of instantaneous power quality in electrical power system overheats the NGR and the customer capacitor and malfunctions the OCGR and AMR, it is necessary for electric power company to take active measures to reduce this disturbance. International Electrotechnical Commission(IEC) 61000-3-2 specifies limits for harmonic current emissions generated by low voltage(LV) electrical equipment whose input current $\leq$ 16(A) per phase. Analysis shows that limits for Class A equipment in IEC are calculated using the reference impedance of LV system and maximum permissible voltage and limits for other Classes are also calculated based on limits for Class A. Therefore we have calculated four(4) internal limits for LV electrical equipment using the korea reference impedance and maximum permissible voltage in this paper.

A Study on the Reverse-Power-Flow Phenomenon due to Transformer Wiring Types in Distribution System (배전계통에서 변압기 결선에 의한 역 조류현상에 관한 연구)

  • Shin, Dong-Yeol;Ha, Bok-Nam;Jung, Won-Wook;Cha, Han-Ju
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.111-119
    • /
    • 2008
  • As the penetration of distributed generation systems is recently high, there have been metering errors, trips of protective devices in KEPCO distribution systems including an occurrence of false fault-indicator in distribution automation system. The cause of malfunctions was the reverse-power-flow phenomenon due to transformer wiring types. By the effect of the reverse-power-flow, each of phase's fundamental currents was added by about 3 times on the neutral line. A new method based on the analysis of the reverse-power-flow is proposed in this paper. Fault currents on each section were analyzed by the proposed method, and the effect of types of transformer wiring was examined experimentally. In order to reduce the malfunctions due to the reverse-power-flow, controlling the zero-sequence impedance of transformer was designed and verified by using PSCAD/EMTDC software.

A Study of Verification on Application of Directional OCR and OCGR for Power System with Small Scale Cogeneration (소형 열병합 발전소의 계통연계시 방향성 과전류 및 지락과전류 계전기의 적용 검증 연구)

  • Lee, Hee-Tae;Cho, Man-Young;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.6
    • /
    • pp.944-950
    • /
    • 2008
  • When small cogenerators are operated in connected with power system, there are many positive aspects such as the reduction of power plant construction, making a improvement of power security etc. At the same time, there are some negative effects or difficulties such as we should make sure of protective coordination, especially, Actually these are not fault, but it is likely to consider the current as the fault. This is one of major causes of malfunctions for protective relays in power distribution system which is including interconnection point. Thus, in this paper, We showed that the directional protection is necessary to the dispersed generation system which is including connection point. We also executed contingency analysis to find out the magnitude of fault current and direction which are classified by fault points, length of line and kinds of faults using ETAP power system analysis program.