• Title/Summary/Keyword: Number of railway

Search Result 582, Processing Time 0.026 seconds

Development of a Time-Based Railway Crossing Control System and Evaluation (철도건널목 정시간 제어방식 개발 밑 효과분석에 관한 연구)

  • Park Dongjoo;Oh Ju-Taek;Lee Sun-Ha;Jung Chun-Hee;Shin Seong-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.2
    • /
    • pp.145-154
    • /
    • 2005
  • Traffic accidents at highway-rail crossing result in larger social and economic damages than the accidents at the typical highway intersections. The traditional control and warning systems of the highway-rail crossing have limitations in that 1) they do not recognize the differences of the trains' arrival times because they rely on the distance-based control system, rather than the time-based one, and 2) thereby they usually cause longer delays of vehicles and pedestrians at the highway-rail crossings. The objective of this study is to develop a time-based railroad crossing control system which takes into account the speed and expected arrival time of trains. using the spot speeds and acceleration rates of trains measured at three points, the developed system was found to be able to accurately estimate the arrival time of train. VISSIM simulation package was utilized to compare system effect of the developed time-based railroad crossing control system with that of the conventional distance-based one. It was found that the developed time-based railroad crossing control system reduced the average travel time, maximum delay length, average delay time, and average number of stop-experienced vehicles as much as 7.0$\%$, 75.6$\%$, 12.7$\%$, and 60.0$\%$, respectively, compared with those from the conventional distance-based one.

On the Needs of Vertical and Horizontal Transportation Machines for Freight Transportation Standard Containers to Derive Design Requirements Optimized for the Urban Railway Platform Environment

  • Lee, Sang Min;Park, Jae Min;Kim, Young Min;Kim, Joo Uk
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.4
    • /
    • pp.112-120
    • /
    • 2021
  • Recently, the number of consumers using digital online distribution platforms is increasing. This caused the rapid growth of the e-commerce market and increased delivery volume in urban areas. The logistics system, designed ar006Fund the city center to handle the delivery volume, operates a delivery system from the outskirts of the city to the urban area using cargo trucks. This maintains an ecosystem of high-cost and inefficient structures that increase social costs such as road traffic congestion and environmental problems. To solve this problem, research is being conducted worldwide to establish a high-efficiency urban joint logistics system using urban railway facilities and underground space infrastructure existing in existing cities. The joint logistics system begins with linking unmanned delivery automation services that link terminal delivery such as cargo classification and stacking, infrastructure construction that performs cargo transfer function by separating from passengers such as using cargo platform. To this end, it is necessary to apply the device to the vertical and horizontal transportation machine supporting the vertical transfer in the flat space of the joint logistics terminal, which is the base technology for transporting cargo using the transfer robot to the destination designated as a freight-only urban railway vehicle. Therefore, this paper aims to derive holistic viewpoints needs for design requirements for vertical and vertical transportation machines and freight transportation standard containers, which are underground railway logistics transport devices to be constructed by urban logistics ecosystem changes.

Mixed Operation with Express Train for Urban Railways in Seoul Metropolitan Area (대피선 설치를 통한 수도권 광역철도 급행화 방안)

  • Son, Gi-Min
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.195-207
    • /
    • 2007
  • The urban railways connecting between the inner city and suburb of Seoul metropolitan area, has lost the competitiveness against cars because too many stops deteriorated operating speed and passenger's level of service. This paper suggests that an express train should be introduced into the urban railway system in order to sort out such a complication. There are two considerations in the present study. Firstly, train schedule problem should be taken into account. In this regard, a new model for urban railway system was developed by revising the existing models dealing with single line freight railway. Approximate branch and bound algorithm based on conflict group rather than a single conflict was adopted. Consequently, it was found that the time saving in calculating the optimal schedule is the most meaningful contribution of the algorithm. The second consideration is associated with the application of the model. A case study was carried out using the actual operation data from Ansan line. In conclusion, the operation speed of the line can increase considerably with minimal number of new sidings.

Systemization Setting of Various Improvement Plans in Railway Bridges (철도교량에서 다양한 개량계획의 체계화 설정)

  • Baek, Jae-Wook;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.354-363
    • /
    • 2011
  • Existing railway bridges have been going through various improvements since the past, with new improvement plans being formed based on social and technological demands. However, there is the need, above all, for an efficient execution plan due to the great number of sites and excessive amount of required expenses contrary to limited assets. The system itself must be held in question in order to systemize various improvement plans, to define and describe factors while utilizing evaluation methods for significance and correlation to achieve generalization. This paper is focused on determining the priority of various improvement plans through the optimization selection process of mutually evaluating alternative plans under various evaluation standards, thus corresponding to the decision-making purpose. The AHP analysis technique was applied for systemization setting and preference evaluation, while the HPT procedure was applied to develop and select appropriate improvement plan factors.

Fundamental Design 8t Integration of TestCar for Korea High Speed Train (한국형 고속전철 시제차량 기본설계통합)

  • 한상훈;이병현;김경택;정경렬
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.202-208
    • /
    • 1999
  • Train system like high speed train is assemble by a number of subsystem. Therefore, the Integration of train system needs the process that investigates the interface and influence between subsystems. In this paper, It studied the Design & Integration and major process of Korea High Speed Tram Project,

  • PDF

A Study on Model of Train Slot Allocation for Railway Network with Multi Operating System (복수 운영체제에서의 철도네트워크 열차슬롯배분 모형 연구)

  • Choi, Jong-Bin;Lee, Jinsun
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.142-155
    • /
    • 2017
  • It is anticipated that, in cases in which different train operators share railway network, conflicts may occur among train operators with regard to train operation rate, train priorities, and arrival and departure time; besides this, during times when there is high demand for trains, operators will request train operations intensively, steadily increasing train conflict phenomena. In the present study, train operation sequence, minimum headway, arrival and departure time, train priorities, etc., were analyzed, and while using train departure times as decision variables in variably given train schedules, by adjusting train time requested by train operators, and finally rejecting the train times in cases in which conflict resolution is impossible, so that various constraints can be satisfied, a train slot allocation model was suggested to find the objective function, that is, the maximum number of train slots that can be practically applicable to railway operation.

Concept Design of an Active Steering Bogie for Urban Railway Vehicles (도시형 전동차용 능동조향대차의 개념설계)

  • Park, Joon-Hyuk;Hur, Hyun-Moo;Koh, Hyo-In;You, Won-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.709-716
    • /
    • 2007
  • An active steering bogie has been theoretically proved to improve both stability and steering performance remarkably. However, It has not been commercialized yet even though many researchers have been trying to develop it because some technical difficulties still exist such as information acquisition fer active control, increasing mechanical components, high energy consumption, fail-safe problem and so on. To solve those problems, an advanced active steering mechanism is proposed in this paper. With this mechanism, required control force is small enough to use direct drives. Therefore, the number of additional mechanical components can be minimized since mechanical transducers like gears are not necessary. Fail-safe function can be also inserted easily. In this paper, concept design of the proposed active steering bogie is introduced and the possibility is verified through computer simulation using linear dynamic model.

Development of Optimal Train Operation System in Bottle-neck Section According to the Opening of High Speed Railway in Seoul Metropolitan Area (수도권 고속철도개통에 따른 고속선 병목구간 최적열차운행 체계 연구)

  • Chun, Chunggeun;Chung, Sungbong;NamKung, Baekkyu
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.631-637
    • /
    • 2012
  • New Opening of Suseo-Pyeongteak High Speed Railway (HSR) will be a new leap in the Korean railway history. However if this section of HSR line around Seoul Metropolitan Area opens, the confluence of new HSR and existing HSR line in Pyeongteak-Osong section will cause a bottle neck problem. In other words, the opening of Suseo-Pyeongteak HSR line will make the capacity of track reach the limit and the section of railroad between Pyeongteak and Osong will be saturated. This will also make such troubles as restricting the number of train which stops at Cheonan-Asan station. In this study, based on the train assignment theory of TVM430 signal system, the methods of calculating headway and number of train are reviewed and the plan for application of optimal operation pattern during peak hour between Pyeongteak-Osong section is also suggested. To remove the bottle neck problem in this HSR section, 3 alternatives are suggested and the expected effects and problems of each alternative are also analyzed. The results show that the troubles caused by excess of track capacity can be removed without any additional cost if the minimum headway in operating system for HSR is adopted in this section. In the future, if these alternatives are considered to the long-term plan for operating train and signal systems, this will improve the efficiency of train operation, which can remove the bottle neck in the HSR line.

An analytical solution to the vibration characteristics for continuous girder bridge-track coupling system and its application

  • Feng, Yulin;Jiang, Lizhong;Zhou, Wangbao;Zhang, Yuntai;Liu, Xiang
    • Structural Engineering and Mechanics
    • /
    • v.77 no.5
    • /
    • pp.601-612
    • /
    • 2021
  • To study the vibration characteristics of a high-speed railway continuous girder bridge-track coupling system (HSRCBT), a coupling vibration analysis model of an m-span continuous girder bridge-subgrade-track system with n-span approach bridge was established. The model was based on the energy and its variational method, where both the interlaminar slip and shear deformation effects were considered. In addition, the free vibration equations and natural boundary conditions of the HSRCBT were derived. Further, according to the coordination principle of deformation and mechanics, an analytical method for calculating the natural vibration frequencies of the HSRCBT was obtained. Three typical bridge-subgrade-track coupling systems of high-speed railway were taken and the results of finite element analysis were compared to those of the analytical method. The errors between the simulation results and calculated values of the analytical method were less than 3%, thus verifying the analytical method proposed in this paper. Finally, the analytical method was used to investigate the influence of the number of the approach bridge spans and the interlaminar stiffness on the natural vibration characteristics of the HSRCBT based on the degree of sensitivity. The results suggest the approach bridges have a critical number of spans and in general, the precision requirements of the analysis could be met by using 6-span approach bridges. The interlaminar vertical compressive stiffness has very little influence on the low-order natural vibration frequency of HSRCBT, but does have a significant influence on higher-order natural vibration frequency. As the interlaminar vertical compressive stiffness increases, the degree of sensitivity to interlaminar stiffness of each of the HSRCBT natural vibration characteristics decrease and gradually approach zero.

Wetting-Induced Collapse in Rock Fill Materials for Embankment (토공구간 성토체의 Wetting Collapse에 관한 연구)

  • Lee, Sung-Jin;Lee, Il-Wha;Im, Eun-Sang;Shin, Dong-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1287-1296
    • /
    • 2007
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. In spite of little study for this wetting collapse problem, it has been recognized that the compressibility of compacted sands, gravels and rockfills exhibit low compressibility at low pressures, but there can be significant compression at high pressures due to grain crushing by several researchers(Marachi et al. 1969, Nobari and Duncan 1972, Noorany et al. 1994, Houston et al. 1993, Wu 2004). The characteristics of compression of fill materials depend on a number of factors such as soil/rock type, as-compacted moisture, density, stress level and wetting condition. Because of the complexity of these factors, it is not easy to predict quantitatively the amount of compression without extensive tests. Therefore, in this research I carried out the wetting collapse tests, with focusing in various soil/rock type, stress levels, wetting condition more closely.

  • PDF