• Title/Summary/Keyword: Nuclear activities

Search Result 927, Processing Time 0.044 seconds

Nuclear Physics Methods for Determination of Radon in Water

  • Oyunchimeg, Ts.;Norov, N.;Khuukhenkhuu, G.
    • Progress in Medical Physics
    • /
    • v.13 no.1
    • /
    • pp.51-53
    • /
    • 2002
  • The results of the measured specific activities of Rn-222 in sewerage and drinking water of Ulaanbaatar City, Mongolia using the HP-Ge gamma-spectrometer, solid state nuclear track detector and liquid scintillator, are compared. The specific radioactivity for the Rn-222 in water of Ulaanbaatar City ranged 10-250 Bk/l, with an average of 110 Bk/l.

  • PDF

Safety Regulation of Enhanced In-Service Inspection(ISI) in Nuclear Power Plant (원자력발전소 강화 가동중검사 안전규제)

  • Shin, Ho-Sang
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.30 no.4
    • /
    • pp.380-385
    • /
    • 2010
  • The integrity of components and piping of operating nuclear power plants has been identified by in-service inspection(ISI) requirements and activities commensurate with standards and codes such as KEPIC MI or ASME Code Section XI. However, the other various degradation mechanisms not considered during design stage of nuclear power plants have been checked by enhanced ISI. The requirements of enhanced ISI have been voluntarily developed by the industry itself or strickly issued by regulatory body. Even though the requirements were developed by the industry, they should be reviewed by regulatory body for their application in nuclear power plants. The enhanced ISI activities and requirements of non-destructive examination(NDE) which reflect the degradation issues in nuclear power industry will be primarily discussed in this paper.

CURRENT STATUS AND PROSPECT FOR PERIODIC SAFETY REVIEW OF AGING NUCLEAR POWER PLANTS IN KOREA

  • Jin, Tae-Eun;Roh, Heui-Young;Kim, Tae-Ryong;Park, Young-Sheop
    • Nuclear Engineering and Technology
    • /
    • v.41 no.4
    • /
    • pp.545-548
    • /
    • 2009
  • Korean utility has utilized a Periodic Safety Review (PSR) that assesses the cumulative effects of plant aging, modifications, operating experience, technical developments, and site characteristics since 2000. In particular, the assessment and management of plant aging is one of the major areas in PSR. It includes identification of critical Systems, Structures, and Components (SSCs) for aging, assessment of aging effects, and implementation of aging management programs. Since the PSR system was introduced based on the atomic energy acts and related laws, PSRs of eight sets for 12 Nuclear Power Plants (NPPs) that have been operating more than 10 years have been completed. PSRs of two sets for 4 NPPs are currently being carried out. The utility has confirmed that domestic NPPs have been operated safely through these PSRs and have implemented the follow-up corrective activities to increase the nuclear safety. In this paper, the status of PSR implementation is discussed and improvement programs to conduct PSR follow-up corrective activities efficiently for NPPs are suggested based on experiences with aging assessments.

Development of a Leading Performance Indicator from Operational Experience and Resilience in a Nuclear Power Plant

  • Nelson, Pamela F.;Martin-Del-Campo, Cecilia;Hallbert, Bruce;Mosleh, Ali
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.114-128
    • /
    • 2016
  • The development of operational performance indicators is of utmost importance for nuclear power plants, since they measure, track, and trend plant operation. Leading indicators are ideal for reducing the likelihood of consequential events. This paper describes the operational data analysis of the information contained in the Corrective Action Program. The methodology considers human error and organizational factors because of their large contribution to consequential events. The results include a tool developed from the data to be used for the identification, prediction, and reduction of the likelihood of significant consequential events. This tool is based on the resilience curve that was built from the plant's operational data. The stress is described by the number of unresolved condition reports. The strain is represented by the number of preventive maintenance tasks and other periodic work activities (i.e., baseline activities), as well as, closing open corrective actions assigned to different departments to resolve the condition reports (i.e., corrective action workload). Beyond the identified resilience threshold, the stress exceeds the station's ability to operate successfully and there is an increased likelihood that a consequential event will occur. A performance indicator is proposed to reduce the likelihood of consequential events at nuclear power plants.