The High Temperature Gas-cooled Reactor (HTGR) possesses inherent safety features and is recognized as a representative advanced nuclear system for the future. Based on the success of the HTR-10, the long-time operation test and safety demonstration tests were carried out. The long-time operation test verifies that the operation procedure and control method are appropriate for the HTR-10 and the safety demonstration test shows that the HTR-10 possesses inherent safety features with a great margin. Meanwhile, two new projects have been recently launched to further develop HTGR technology. One is a prototype modular plant, denoted as HTR-PM, to demonstrate the commercial capability of the HTGR power plant. The HTR-PM is designed as $2{\times}250$ MWt, pebble bed core with a steam turbine generator that serves as an energy conversion system. The other is a gas turbine generator system coupled with the HTR-10, denoted as HTR-10GT, built to demonstrate the feasibility of the HTGR gas turbine technology. The gas turbine generator system is designed in a single shaft configuration supported by active magnetic bearings (AMB). The HTR-10GT project is now in the stage of engineering design and component fabrication. R&D on the helium turbocompressor, a key component, and the key technology of AMB are in progress.
HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
Nuclear Engineering and Technology
/
제47권3호
/
pp.362-379
/
2015
In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.
세계에서는 지구온난화 등에 따른 기후 변화에 대응하여 원전 건설을 금지해오던 국가들도 점점 허용하는 추세이다. 따라서 앞으로의 원전 건설이 늘어날 것이며 이에 대한 경쟁 또한 심화될 것이다. 원전 프로젝트는 일반 건설 공사와 비교하여 공사 기간이 매우 길다. 원전 건설 프로젝트에서 경쟁 우위를 확보하기 위해 원전 공사 기간을 줄일 수 있는 기술을 개발하는 것이 필요하다. 따라서 본 연구의 목적은 원자로 건물 외벽 거푸집의 높이를 3m에서 4m로 증가시킴으로써 공사 기간을 감소시키기 위한 원자로 건물 외벽 거푸집을 개발하는 것이다. 개발된 거푸집을 원전 프로젝트에 적용하기 위해 구조적 안전성과 시공성 및 경제성을 분석하였다. 현장 적용 가능성을 평가한 결과 개발된 거푸집은 구조적으로 안전했다. 그리고 시공 단수가 감소함으로써 공사 기간이 단축되고 공사비 또한 절감되는 효과를 확인하였다. 본 연구의 결과는 향후 원자로 건물의 공사 기간 단축을 위한 지속적인 기술 개발을 위한 자료로 활용하여 한국의 세계 원전시장에서의 경쟁력 확보에 기여할 수 있을 것으로 사료된다.
1978년에 고리 1호기의 건설이 완공된 이래로 원자력 발전 플랜트의 건설 프로젝트는 국내 외로 점차 확대되고 있다. 그러나 일부 원자력 발전 플랜트의 건설 현장에서는 리스크 관리 능력의 부족으로 인하여 공기 지연과 공사비 손실의 문제점들을 가지고 있다. 특히, 원자력 발전 플랜트 내 원자로격납건물의 시공은 타 시공 단계에 비해 긴 공정기간으로 인하여 전문기술과 대규모 자원이 요구됨에 따라 많은 리스크 요인들이 산재될 수 있다. 따라서 원자로격납 건물의 시공에서 예상되는 리스크 요인들을 분석하여 전체 프로젝트의 안정적인 수행 방향을 제시하는 연구가 필요하다. 그러므로 본 연구는 원자로격납건물 시공의 리스크 요인들을 평가하고자 한다. 이를 위하여 본 연구는 36명의 소수 전문가 집단을 대상으로 하는 설문조사방법을 활용하였다. 24개의 리스크 요인들은 공정, 원가, 안전, 품질을 기준으로 분류되었으며, 이에 대한 평가 결과는 계층 분석방법을 활용하여 분석하였다. 이를 바탕으로 각 기준별로 분류된 리스크 요인들은 중요도와 우선순위를 산정하고 원자력 발전 플랜트의 시공 리스크 요인을 분석하는데 계층분석 방법의 적용성을 확인하였다. 본 연구의 결과는 원자로격납건물의 시공 단계에서 리스크 관리를 위한 기초 자료로 활용될 수 있을 것이다.
The world began to search for new energy sources with increasing energy demand. Renewable energy sources are as hydropower important for alternative energy. Countries with high hydroelectric potentials continue to work to utilize hydroelectric power plants in the most efficient way. Pumped storage hydropower plants are an important investment to meet the growing energy needs at peak times and to store energy. Although it produces energy in many countries, pumped storage hydropower plants have not begun to be built in Turkey which has high hydroelectric potential. A new era will be opened for energy production in Turkey where a large number of pumped storage hydropower plants projects are in study phase with the construction of pumped storage hydropower plants and first nuclear power plant.
원자력발전은 기본적으로 공급의 안정성과 경제성을 갖추고 있는 에너지원으로서 전력생산에 관한 자원 및 환경문제의 한계를 극복한 에너지원으로 평가받고 있다. 그러나 최근 일본 후쿠시마 원전사고로 독일과 이탈리아 등은 원전의 단계적인 철폐와 도입을 취소하는 등 원전의 안정성에 대한 논의가 활발히 이루어지고 있다. 우리나라도 최근 원전부품 납품에 관한 비리가 발생하는 등 원전에 관한 크고 작은 안전사고가 발생하고 있다. 따라서 본 논문에서는 원전부품을 효율적이고 안전하게 관리하기 위해 RFID를 활용한 원전부품의 공급사슬관리시스템의 구축 방안을 제안한다.
Printed Circuit Heat Exchanger (PCHE) is a widely used heat exchanger in the supercritical carbon dioxide (sCO2) Brayton cycle because it can work under high temperature and pressure, and has been a hot topic in Next Generation Nuclear Plant (NGNP) projects for use as recuperators and condensers. Most previous studies focused on channel structures or shapes. However, no clear advancement has so far been seen in the allover size of the PCHE. In this paper, we proposed an optimal size of the PCHE with a fixed volume. Two boundary conditions of PCHE were simulated, respectively. When the volume of PCHE was fixed, the heat transfer rate and pressure loss were picked as the optimization objectives. The Pareto front was obtained by the Multi-objective optimization procedure. We got the optimized number of PCHE channels under two different boundary conditions from the Pareto front. The comprehensive performance can be increased by 5.3% while holding in the same volume. The numerical results from this study can be used to improve the design of PCHE with straight channels.
지난 2011년 일본 후쿠시마 원전 사고 이후 대내외적으로 방사능 피폭 가능성에 대한 우려가 확산되어 왔고, 국내 원전의 잦은 사고로 인해 원전 종사자들의 사고에 대한 불안감도 증폭되고 있다. 기존에는 원자력 발전소나 방폐장 주변 지역 주민들의 보상 문제가 주요 쟁점이었으나 본 연구에서는 원자력 기술 개발 관련 종사자를 대상으로 방사능 피폭 가능성에 대한 임금 프리미엄을 추정하는 데에 초점을 맞추었다. 방사능 피폭에 따른 산업재해 발생 시 근로자에게 입증 책임이 있어 적정한 보상을 받기 어렵다는 점에서 방사능 피폭에 대한 보상 문제를 민간부문에 맡길 경우 사회적으로 바람직한 결과가 도출되기 어렵다. 본 연구는 선택실험법에 의해 원자력 기술개발 종사자를 대상으로 방사능 위험에 대한 보상 수준, 방사능 노출도, 고용보장성, 회사 입지, 근무 강도가 다르게 주어질 경우 어떤 직장을 선호하는지를 설문하였다. 설문 결과 방사능 위험도가 고용 보장성이나 근무 강도, 회사 입지에 비해 더 중요한 요인임을 알 수 있었고, 추정 모형에 따라 방사능 피폭 가능성 감소에 대한 연간 지불용의액은 773~777만 원에 이르는 것으로 나타났다. 따라서 향후 정부는 원자력 기술개발 종사자가 방사능 피폭과 관련한 산업재해가 발생하는 경우 적절한 보상이 이루어질 수 있도록 법제도적 기반을 조성할 필요가 있다.
The Korean Peninsula, located at the southeastern tip of the Eurasian Plate, is known to be tectonically stable, and no critical evidence has yet been found that would override the safety design of nuclear facilities in South Korea. Because a nuclear power plant, like other major social overhead capital facilities, could cause great damage to both the environment and society through an unexpected tectonic event, even one of extremely low probability, like the Fukushima accident, a defense-in-depth safety approach is required in geological and geotechnical site safety evaluation for nuclear projects. This paper introduces the regulatory procedures that are in place to confirm nuclear site safety and site monitoring (e.g., earthquakes and groundwater) systems applied to nuclear facilities in order to reduce inherent uncertainties within the site safety review of geological and seismological issues related with a NPP project.
Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.