성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Display System Design Based On The Abstraction Hierarchy

  • Sohn, Kwang-Young;Shin, Hyun-Kook
    • Nuclear Engineering and Technology
    • /
    • 제28권3호
    • /
    • pp.339-348
    • /
    • 1996
  • Plant monitoring algorithm developments seem to be saturated which means that display system to show the results from the algorithm should be the well-defined and interactive tools for operator's diagnosing, controlling, restoring the abnormal plant situations. On the other hand, very little generalized display design concepts and evaluations are available. Events that are unfamiliar to operators and that has not been anticipated by designers may cause great threats to the nuclear power plant system safety operation. The abstraction hierarchy, considered most popular display design methodology but not generalized for nuclear power plant design space, has ken proposed as a representation frame work that can be adopted to design interfaces and supports operators in diagnosing overlooked events that should have been considered to operate plant safely. However most practical plant display systems do not fully stick to this design concept but partially rely on their philosophy from design experiences. Abstraction hierarchy display design concept will be do scribed and the trend of Advanced Control Room(ACR) CRT design will also be presented with the conventional display for the several type of plants. Consequently this complementary material should be of interest to designer and regulators concerned with nuclear power plant.

  • PDF

플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안 (Penetration of Korean EPC Companies into International Market for Nuclear Power Plant)

  • 조찬형;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권3호
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

원자력발전소 1차 계통 주요기기에 대한 웹기반 피로수명평가 시스템 개발 (Development of a Web-based Fatigue Life Evaluation System for Primary Components in a Nuclear Power Plant)

  • 서형원;이상민;최재붕;최성남;장기상;홍승렬;김영진
    • 대한기계학회논문집A
    • /
    • 제28권6호
    • /
    • pp.663-669
    • /
    • 2004
  • A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including regular in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage the integrity issues on a nuclear power plant. In this paper, a web-based fatigue life evaluation system for primary components in nuclear power plant is proposed. This system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant.

원자력발전소 1 차 계통 주요기기에 대한 웹기반 피로수명평가 시스템 개발 (Development of a Web-based Fatigue Life Evaluation System for Primary Components in a Nuclear Power Plant)

  • 서형원;이상민;최재붕;김영진;최성남;장기상;홍승렬
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 춘계학술대회
    • /
    • pp.279-284
    • /
    • 2003
  • A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including regular in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage the integrity issues on a nuclear power plant. In this paper, a web-based fatigue life evaluation system for primary components in nuclear power plant is proposed. This system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant.

  • PDF

Abnormal state diagnosis model tolerant to noise in plant data

  • Shin, Ji Hyeon;Kim, Jae Min;Lee, Seung Jun
    • Nuclear Engineering and Technology
    • /
    • 제53권4호
    • /
    • pp.1181-1188
    • /
    • 2021
  • When abnormal events occur in a nuclear power plant, operators must conduct appropriate abnormal operating procedures. It is burdensome though for operators to choose the appropriate procedure considering the numerous main plant parameters and hundreds of alarms that should be judged in a short time. Recently, various research has applied deep-learning algorithms to support this problem by classifying each abnormal condition with high accuracy. Most of these models are trained with simulator data because of a lack of plant data for abnormal states, and as such, developed models may not have tolerance for plant data in actual situations. In this study, two approaches are investigated for a deep-learning model trained with simulator data to overcome the performance degradation caused by noise in actual plant data. First, a preprocessing method using several filters was employed to smooth the test data noise, and second, a data augmentation method was applied to increase the acceptability of the untrained data. Results of this study confirm that the combination of these two approaches can enable high model performance even in the presence of noisy data as in real plants.

A new method for safety classification of structures, systems and components by reflecting nuclear reactor operating history into importance measures

  • Cheng, Jie;Liu, Jie;Chen, Shanqi;Li, Yazhou;Wang, Jin;Wang, Fang
    • Nuclear Engineering and Technology
    • /
    • 제54권4호
    • /
    • pp.1336-1342
    • /
    • 2022
  • Risk-informed safety classification of structures, systems and components (SSCs) is very important for ensuring the safety and economic efficiency of nuclear power plants (NPPs). However, previous methods for safety classification of SSCs do not take the plant operating modes or the operational process of SSCs into consideration, thus cannot concentrate on the safety and economic efficiency accurately. In this contribution, a new method for safety classification of SSCs based on the categorization of plant operating modes is proposed, which considers the NPPs operating history to improve the economic efficiencies while maintaining the safety. According to the time duration of plant configurations in plant operating modes, average importances of SSCs are accessed for an NPP considering the operational process, and then safety classification of SSCs is performed for plant operating modes. The correctness and effectiveness of the proposed method is demonstrated by application in an NPP's safety classification of SSCs.

Optimization of preventive maintenance of nuclear safety-class DCS based on reliability modeling

  • Peng, Hao;Wang, Yuanbing;Zhang, Xu;Hu, Qingren;Xu, Biao
    • Nuclear Engineering and Technology
    • /
    • 제54권10호
    • /
    • pp.3595-3603
    • /
    • 2022
  • Nuclear safety-class DCS is used for nuclear reactor protection function, which is one of the key facilities to ensure nuclear power plant safety, the maintenance for DCS to keep system in a high reliability is significant. In this paper, Nuclear safety-class DCS system developed by the Nuclear Power Institute of China is investigated, the model of reliability estimation considering nuclear power plant emergency trip control process is carried out using Markov transfer process. According to the System-Subgroup-Module hierarchical iteration calculation, the evolution curve of failure probability is established, and the preventive maintenance optimization strategy is constructed combining reliability numerical calculation and periodic overhaul interval of nuclear power plant, which could provide a quantitative basis for the maintenance decision of DCS system.

원전 터빈사이클 성능 데이터의 검증 모델에 의한 성능분석 기법의 개발 (Development of Performance Analysis Methodology for Nuclear Power Plant Turbine Cycle Using Validation Model of Performance Measurements)

  • 김성근;최광희
    • 대한기계학회논문집B
    • /
    • 제24권12호
    • /
    • pp.1625-1634
    • /
    • 2000
  • Verification of measurements is required for precise evaluation of turbine cycle performance in nuclear power plant. We assumed that initial acceptance data and design data of the plant could provide correlation information between performance data. The data can be used as sample sets for the correct estimation model of measurement value. The modeling was done practically by using regression model based on plant design data, plant acceptance data and verified plant performance data of domestic nuclear power plant. We can construct more robust performance analysis system for an operation nuclear power plant with this validation scheme.

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF