• Title/Summary/Keyword: Normal Operation Cost

Search Result 98, Processing Time 0.022 seconds

The Power Flow Control of UPFC for Cost Minimization

  • Lim, Jung-Uk;Moon, Seung-Il
    • KIEE International Transactions on Power Engineering
    • /
    • v.12A no.1
    • /
    • pp.31-35
    • /
    • 2002
  • This paper presents a new operation scheme of UPFC to minimize both generation costs and active power losses in a normal operation state of power system. In a normal operation, cost minimization is a matter of primary concern among operating objectives. This paper considers two kinds of costs, generation costs and transmission losses. The total generation cost of active powers can be minimized by optimal power flow, and active power losses in the transmission system can be also minimized by power flow control of UPFC incorporated with minimization of generation costs. In order to determine amounts of active power reference of each UPFC required for the cost minimization, an iterative optimization algorithm based on the power flow calculation using the decoupled UPFC model is proposed. For verification of the proposed method, intensive studies have been performed on a 3-unit 6-bus system equipped with a UPFC.

A Comparative Study on Start-up and Normal Operation Data for Phosphorus Removal in WWTPs (인 처리시설 시운전 및 정상운전 자료 비교·분석 연구)

  • Yun, Soyoung;Ryu, Jaena;Kim, Jonguk;Oh, Jeill
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.113-120
    • /
    • 2013
  • This study aimed to obtain quantitative data for WWTP operators in phosphorus removal process. This was done by reviewing and comparing phosphorus removal efficiency(%), coagulants dosage(Al/P and $Al_2O_3$(mg/L)), sludge production($kg/m^3$), and operation cost($won/m^3$) of start-up and normal operation data. Phosphorus removal efficiency of all tertiary treatment process was up to 70 ~ 89 % in start-up and normal operation. Average molar ratio(Al/P) was similar as 5 in both operations, but average coagulants dosage (mg/L) of start-up (8.5 mg/L) was higher than normal operation (6.2 mg/L). Average operation cost was higher for start-up ($33.6won/m^3$) than normal operation ($28.4won/m^3$), while electricity cost required for the normal operation ($9.0won/m^3$) was higher by $3.5won/m^3$.

The Analysis of Maintenance & Repair Cost in Educational Facilities of Primary and Secondary Schools - Focusing on Primary and Secondary Schools in Incheon Metropolitan City - (초.중등 교육시설의 유지관리비 분석 - 인천광역시 초.중등학교를 중심으로 -)

  • Kim, Young-Gu;Lee, Jae-Rim
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.16 no.1
    • /
    • pp.33-41
    • /
    • 2009
  • The purpose of this study is to provide a basis for calculation of school operation fees for normal functioning of the school facilities, and facility maintenance and repair cost through their life spans, considering remodeling of the facilities and changes of their functions. This study analyzes maintenance and repair records during the three years from 2003 to 2005 in primary, middle and high schools in Incheon Metropolitan city and also the facility management and operation expenditure of the same schools in the city during the year of 2005, and presents quantified unit cost of each item according to the area, the age of the facilities, and the number of classroom, student, and lessons given. The calculation can be a basis for both BTL school facility managers and the general school facility mangers to budget school facility maintenance cost appropriately and the quantity of energy, water, electricity, and telephone fees calculated here can be a criteria for the managers to check the normal maintenance of their facility.

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

Optimal Reactive Power Planning Using Decomposition Method (분할법을 이용한 최적 무효전력 설비계획)

  • 김정부;정동원;김건중;박영문
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.38 no.8
    • /
    • pp.585-592
    • /
    • 1989
  • This paper presents an efficient algorithm for the reactive planning of transmission network under normal operating conditions. The optimal operation of a power system is a prerequisite to obtain the optimal investment planning. The operation problem is decomposed into a P-optimization module and a Q-optimization module, but both modules use the same objective function of generation cost. In the investment problem, a new variable decomposition technique is adopted which can operate the operation and the investment variables. The optimization problem is solved by using the gradient projection method (GPM).

  • PDF

Economic Efficiency of the Korean Container Terminals: A Stochastic Cost Frontier Approach

  • Seokwoo Jake Choi;Gi-Su Kim;BoKyung Kim
    • Journal of Korea Trade
    • /
    • v.26 no.3
    • /
    • pp.23-44
    • /
    • 2022
  • Purpose - Recent issues such as vessel enlargement, strengthening of environmental regulations, and port smartization are expected to increase costs and intensify competition in the port industry. In the new normal era, when external growth has reached its limit, the efficient operation of ports is becoming indispensable for achieving sustainable growth. This study aims to identify the determinants of inefficiency by examining the cost structure and efficiency of container terminals in Korea and furthermore propose the political implications to derive the maximization of efficiency. Design/methodology - This study estimates the cost function of container terminal operators and identifies the efficiency of container terminals using stochastic cost frontier (SCF) in the first stage. In the second step, the SCF results are compared with the data envelopment analysis (DEA). Last, this paper proposes efficiency determinants on container terminal operation to establish appropriate strategies. Out of the 29 container terminal operators in South Korea, 13 operators participated in the survey. The translog cost function was estimated utilizing a total of 116 observations collected over the 2007-2017 period. Findings - Empirical analysis shows that economies of scale exist in Korea's container ports, which provides a rationale for the government's policy to establish the global terminal operator by integrating small terminal operators to enhance competitiveness. In addition, as a result of the determinants analysis, container throughput, weight of direct employment costs, and labour cost share have positive effects on improving cost efficiency, while inefficiency increases as the length of quay increases. More specifically, cost efficiency improves as the proportion of direct employment costs to outsourcing service costs increases. Originality/value - This study contributes to analyzing the inefficiency factors of container terminals through efficiency analysis with respect to a cost function. In addition, this study proposes the practical and political implications, such as establishing a long-term manpower pool, the application of the hybrid liner terminal system, and the construction of a statistical data system, to improve the cost inefficiency of terminal operators.

The Novel Efficient Dual-field FIPS Modular Multiplication

  • Zhang, Tingting;Zhu, Junru;Liu, Yang;Chen, Fulong
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.2
    • /
    • pp.738-756
    • /
    • 2020
  • The modular multiplication is the key module of public-key cryptosystems such as RSA (Rivest-Shamir-Adleman) and ECC (Elliptic Curve Cryptography). However, the efficiency of the modular multiplication, especially the modular square, is very low. In order to reduce their operation cycles and power consumption, and improve the efficiency of the public-key cryptosystems, a dual-field efficient FIPS (Finely Integrated Product Scanning) modular multiplication algorithm is proposed. The algorithm makes a full use of the correlation of the data in the case of equal operands so as to avoid some redundant operations. The experimental results show that the operation speed of the modular square is increased by 23.8% compared to the traditional algorithm after the multiplication and addition operations are reduced about (s2 - s) / 2, and the read operations are reduced about s2 - s, where s = n / 32 for n-bit operands. In addition, since the algorithm supports the length scalable and dual-field modular multiplication, distinct applications focused on performance or cost could be satisfied by adjusting the relevant parameters.

Analysis of the Switch Installation Criteria by Increasing Operating Capacity in Distribution Line (배전선로 운전용량 상향에 따른 개폐기 설치 기준 분석)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.290-295
    • /
    • 2002
  • The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.

A Study on Optimal Economic Operation of Hydro-reservoir System by Stochastic Dynamic Programming with Weekly Interval (주간 단위로한 확률론적 년간 최적 저수지 경제 운용에 관한 연구)

  • Song, Gil-Yong;Kim, Yeong-Tae;Han, Byeong-Yul
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.106-108
    • /
    • 1987
  • Until now, inflow has been handled an independent log-normal random variable in the problem of planning the long-term operation of a multi-reservoir hydrothermal electric power generation system. This paper introduces the detail study for making rule curve by applying weekly time interval for handling inflows. The hydro system model consists of a set of reservoirs and ponds. Thermal units are modeld by one equivalent thermal unit. Objective is minimizing the total cost that the summation of the fuel cost of equivalent thermal unit at each time interval. For optimization, stochastic dynamic programming(SDP) algorithm using successive approximations is used.

  • PDF

Comparative Evaluation on the Cost Analysis of Software Development Model Based on Weibull Lifetime Distribution (와이블 수명분포에 근거한 소프트웨어 개발모형의 비용 분석에 관한 비교 평가)

  • Bae, Hyo-Jeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.3
    • /
    • pp.193-200
    • /
    • 2022
  • In this study, the finite-failure NHPP software reliability model was applied to the software development model based on the Weibull lifetime distribution (Goel-Okumoto, Rayleigh, Type-2 Gumbe), which is widely used in the software reliability field, and then the cost attributes were compared and evaluated. For this study, failure time data detected during normal operation of the software system were collected and used, the most-likelihood estimation (MLE) method was applied to the parameter estimation of the proposed model, and the calculation of the nonlinear equation was solved using the binary method. As a result, first, in the software development model, when the cost of testing per unit time and the cost of removing a single defect increased, the cost increased but the release time did not change, and when the cost of repairing failures detected during normal system operation increased, the cost increased and the release time was also delayed. Second, as a result of comprehensive comparative analysis of the proposed models, it was found that the Type-2 Gumble model was the most efficient model because the development cost was lower and the release time point was relatively faster than the Rayleigh model and the Goel-Okumoto basic model. Third, through this study, the development cost properties of the Weibull distribution model were newly evaluated, and the analyzed data is expected to be utilized as design data that enables software developers to explore the attributes of development cost and release time.