A Consideration on 3-Phase Non-Loop, Multiple-Point Ground Method in 22.9[kV] CNCV Underground Cable Systems (22.9[kV] CNCV케이블 지중배전계통의 3상 비일괄 동심증성선 다중접지방식에 대한 이론적고찰)
-
- Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
- /
- v.22 no.2
- /
- pp.85-93
- /
- 2008