• Title/Summary/Keyword: Non-Prototype Category II

Search Result 2, Processing Time 0.016 seconds

Proposal for CVAP of First Plant of APR+ NPP (APR+원전 최초 호기의 CVAP 수행에 대한 제언)

  • Kim, Dong-Hak;Ko, Do-Young;Kim, Maan-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.399-401
    • /
    • 2014
  • The comprehensive vibration assessment program(CVAP) of APR+ nuclear power plant(NPP) is classified as non-prototype, category II with Palo Verde NPP as valid prototype. In this paper, CVAP for first plant of APR+ NPP is proposed. The Control Element Assembly(CEA) shroud of APR+ NPP is different from that of Palo Verde NPP. And the Core Support Barrel(CSB) outer diameter and the flow rate of normal operation of APR+ NPP are larger than those of Palo Verde NPP. Vibration and stress analysis program should be conducted to establish test acceptance criteria. Limited vibration measurement program should be implemented to establish the margin of safety, demonstrate the satisfaction of test acceptance criteria and confirm the similar vibratory response between the APR+ and Palo Verde NPP. Because of the change of normal operation condition, the nominal differences between APR+ and Palo Verde NPP in the structural and hydraulic analysis are studied to determine the measurement locations.

  • PDF

Response Instrumentation Test Acceptance Criteria for APR1400 RVI CVAP (APR1400 원자로내부구조물 종합진동평가 응답측정시험 허용기준)

  • Ko, Do-Young;Kim, Kyu-Hyung;Kim, Sung-Hwan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.21 no.11
    • /
    • pp.1036-1042
    • /
    • 2011
  • APR1400 RVI CVAP using the non-prototype category II is being conducted to verify integrity of the RVI design and to secure the CVAP technology. The measurement programs are to confirm vibration analysis results for reactor internals during pre-operational and initial startup testing and to determine the safety margin. One of the important basis for the measurement programs is test acceptance criteria. Therefore, this paper is on establishment of response instrumentation test acceptance criteria for APR1400 RVI CVAP. The established acceptance criteria show that the stress criteria of APR1400 RVI are more conservative values than those of the valid prototype plant(Palo Verde unit 1) and, the displacement criteria of the inner barrel assembly and the upper guide structure were established to 0.03 in and 0.01 in, respectively.