• Title/Summary/Keyword: New Airport Construction

Search Result 55, Processing Time 0.028 seconds

Estimation of Coastal Terrain Differences Using the Chart (해도를 이용한 해안 지형의 변화량 산정)

  • 양인태;한성만;최승필
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.2
    • /
    • pp.207-214
    • /
    • 2002
  • Development of the shore in western sea is decreasing of silt and is threatening sea ecosystem. Large size land-reclamation work by industralization have caused weather changes and sea changes, and have generated much changes topography of sea bottom and coastline. Also, It is influencing to route of ship. In this research, line for 0 m, 2 m, and coastline of land portion is digitalized. It is divided in four block, and is analyzed severally to know the degree of coastal changes by new airport construction, new town construction, and tide embankment construction.

A Study on the Model of Safety Management in the Construction Management (건설사업 관리 (CM)에서의 안전관리 모델에 관한 연구)

  • 김영수;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.47-57
    • /
    • 2003
  • Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety management of domestic CM, this study made comparative analysis about operation system of safety management with CM system in domestic and abroad. Also suggested the model under consideration with CM, which is suitable for the situation of Korea.

  • PDF

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

Evaluating the Effects of a Landing Charge Discount for Large Aircraft on Congestion Levels at Jeju International Airport

  • In Seok Bae;Jang Hoon Park;Hyo Joong Kim
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.30 no.4
    • /
    • pp.199-206
    • /
    • 2022
  • 제주공항은 슬롯 증대사업을 통한 정시성 개선 노력에도 불구하고 항공 교통량의 확대에 따른 혼잡도의 증가가 지속되고 있다. 제주공항 혼잡도의 근본적인 해소를 위해서 추진되고 있는 신공항 건설이 여러 가지 사유로 지연되고 있으며, 실제 건설계획이 확정되더라도 정상적인 공항 운영까지 상당 기간의 시간이 소요될 것으로 예상된다. 따라서 제주 신공항 건설이라는 대규모 신규 투자와는 별개로 신공항 개항 전, 기존 제주공항을 운영하면서 혼잡도를 해소할 수 있는 중단기적 대안을 마련할 필요가 있다. 이에 국토교통부와 한국공항공사는 제주공항에 소형기보다는 최대이륙중량 100톤 이상의 대형항공기(통상 270석 이상 공급) 투입을 유도하는 착륙료 감면 조치를 시행하였으며, 최초 착륙료 10% 감면에서 추가 활성화를 위하여 착륙료 20% 감면으로 확대하여 운영 중이다. 항공사는 착륙료 감면 비율 상향을 통해 대형기 투입에 따른 실질적인 비용이 절감된다면 상기 정책에 적극 동참하게 될 것이다. 본 논문에서는 제주공항에서 실시 중인 착륙료 감면율 확대 조정이 항공사의 대형기 배정에 미치는 효과를 분석하여 정책의 실효성을 고찰하였으며 이에 따른 개선책을 제시하였다.

Cast study on the Design Application of Final Settlement in Soft Ground (연약지반 최종침하량의 설계 적용성에 관한 사례연구)

  • Kim, Young-Su;Park, See-Boum;Kim, Kyung-Tae;Kim, Chang-Hyun;Kim, Hyun-Gu;Yook, Il-Dong;Kim, Hung-Gon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.948-955
    • /
    • 2005
  • In this case of study, Incheon International Airport 2nd phase site preparation 1st section estimated final settlement to improve soft ground. Final settlement is very important in preloading method. Recently, Hyperbolic method, Hoshino method and Asaoka method are used mostly in prediction of final settlement and this paper, Comparing a result of Final settlement, used to Artificial Neural Network. The structure of Dynamic Artificial Neural Network which predicted Final settlement, has application to Young_Jong Island other site, If new investigation data will be added. Also, It is expected to save measuring_system cost in soft ground.

  • PDF

Practical Application of Nonshrinkage Concrete Using CSA Expansive Additive (CSA 팽창재를 사용한 무수축 콘크리트 현장적용사례 연구)

  • 김병권;조동원;김상용;신영인
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.620-626
    • /
    • 1997
  • In this study. use if CSA expansive additive for concrete is discussed, particulary applications to partial compacting the concrete structure of spillway gate located in Youngjong new airport construction field. Before the field applications, several basic laboratory test were carried out in order to clarify the material characteristics and to decide mix proportions. As the result the concrete using CSA expansive additive show similar workability and compressive strength to that of OPC concrete. Forethemore, it can be concluded that the use of CSA component is effective to prevent shrinkage crack and to achive volume stabiliy of concrete structure.

  • PDF

THE IMPACT OF AIRCRAFT NOISE ON MILITARY EXERCISE AND TRAINING AREAS

  • Bugge, Jens-Jorgen;Knut Fuglum, Bjorn Tronstad
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • 1994.06a
    • /
    • pp.812-816
    • /
    • 1994
  • Gardermoen is chosen as the location for a new major airport for the Oslo area, The site is surrounded by various units and camps operated by the Norwegian national defence. A study was carried out to evaluate whether the occurrence of aircraft noise may result in the national defence having to restrict operations in established camps, and in areas where outdoor exercise, training and instruction are beeing carried out.

  • PDF

Preliminary Scheduling Based on Historical and Experience Data for Airport Project (초기 기획단계의 실적 및 경험자료 기반 공항사업 기준공기 산정체계)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Sungrae;Lee, Ikhaeng;Lee, Changweon;Jeong, Jinhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.26-37
    • /
    • 2017
  • Preliminary scheduling at the initial stage of planning phase is usually performed with limited information and details. Therefore, the reliability and accuracy of preliminary scheduling is affected by personal experiences and skills of the schedule planners, and it requires enormous managerial effort (or workload). Reusing of historical data of the similar projects is important for efficient preliminary scheduling. However, understanding the structure of historical data and applying them to a new project requires a great deal of experience and knowledge. In this context, this paper propose a framework and methodology for automated preliminary schedule generation based on historical database. The proposed methodology and framework enables to automatically generate CPM schedules for airport projects in the early planning stage in order to enhance the reliability and to reduce the workload by using structured knowledge and experience.

The consideration of facilities plan and train operating plan for Incheon airport railroad revitalization (인천공항철도 활성화를 위한 시설 및 열차운영방안 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.80-97
    • /
    • 2010
  • With the hubbing strategy, construction of "Incheon Airport Railroad(AREX)" was proceeded to expand the accessibility at the level of airports in rivalry like Kansai and Chek Lap Kok. At the present 1st phase which routes from Incheon Airport to Kimpo Airport is opened March 2007. 2nd phase which is planned from Kimpo Airport to Seoul station will be opened at the end of October 2010. But the accessibilty to AREX is delinquent because it is connected only in Seoul station and the maximum operation speed is 110km/h which downgrade the time competitiveness with airport limousine. In addition, transfering of user is necessary to access to AREX from Kyungbu KTX. With these reasons, travel demand in 1st phase section is low(7%). According to reestimation of travel demand, demand analysis result compared with convention condition is insufficient, so required annual average government grant-in-aid amounts to 200 billions won, and it is right time to develop the method for revitalization of Incheon airport railroad. In this paper, facilities plan and operating plan to make new travel demand by speed-up which is able through substitution train now running with high speed train(EMU, 180km/h) and direct connection of KTX, will be suggested. This will contribute to offering high speed railroad service to customers and the reduction of government grant-in-aid by way of demand expansion.

  • PDF

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF