• Title/Summary/Keyword: Net-benefit

Search Result 274, Processing Time 0.024 seconds

The Economic Feasibility Analysis of Crop Cultivation Practice Project in Pirganj and Kurigram Districts, Bangladesh (작물재배기술의 경제적 타당성 분석 : 방글라데시 피르간즈군과 쿠리그람군 사례)

  • Tabassum, Nazia;Lim, Jae-Hwan;Gim, Uhn-Soon
    • Korean Journal of Agricultural Science
    • /
    • v.35 no.1
    • /
    • pp.85-100
    • /
    • 2008
  • The United States Department of Agriculture (USDA) funded collaborative project on The Economic Feasibility Analysis of Crop Cultivation Practice Project in Pirganj and Kurigram Districts in Bangladesh will started during 2008-2012, for 4 years with total project cost of US$ 571,270. The project will be implemented in 6 villages; has 1,097 hectares areas which is divided into 948 hectares of agricultural land, 52 hectares of forest land and 345 hectares of other land, covered 1,059 households equal to 5,305 persons in Pirganj and Kurigram districts The project has proposed to be implemented in joint collaboration by Bangladesh Agricultural Research Council (BARC), Bangladesh Agricultural Research Institute (BARI) and Rangpur Dinajpur Rural Service (RDRS) Bangladesh with full participation of the farmers' groups of respective project site. The specific objectives of the project are: (1) to estimate the productivity of paddy, wheat, maize, tobacco and sugarcane (2) to determine the cost of production and returns to the above mentioned crops (3) to study the interrelationship between inputs and output of the above mentioned crops and (4) to examine the resource utilization patterns at farm level. In this project analysis, the net incremental profit is US$33,028. The expected incremental project benefit and incremented production cost are estimated as US$ 219,959 and US$ 186,931 respectively. The financial decision making criteria would be followed in this crop cultivation practice project. After the project implementation, the expected project benefits are assumed to be continued for 15 years. The benefit cost ratio (B/C) of the project is estimated at 1.077 (table 11) when using discount rate of 10% as an opportunity cost of capital in Bangladesh. FIRR of project is estimated at 26.15% which is bigger than the opportunity cost by more than double. So this project is financially feasible and acceptable. Therefore, this project should be extended to other areas to increase the farm income and economic growth of marginal poor farmers in Bangladesh.

  • PDF

Development of a Model for Calculating Road Congestion Toll with Sensitivity Analysis (민감도 분석을 이용한 도로 혼잡통행료 산정 모형 개발)

  • Kim, Byung-Kwan;Lim, Yong-Taek;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.5
    • /
    • pp.139-149
    • /
    • 2004
  • As the expansion of road capacity has become impractical in many urban areas, congestion pricing has been widely considered as an effective method to reduce urban traffic congestion in recent years. The principal reason is that the congestion pricing may lead the user equilibrium (UE) flow pattern to system optimum (SO) pattern in road network. In the context of network equilibrium, the link tolls according to the marginal cost pricing principle can user an UE flow to a SO pattern. Thus, the pricing method offers an efficient tool for moving toward system optimal traffic conditions on the network. This paper proposes a continuous network design program (CNDP) in network equilibrium condition, in order to find optimal congestion toll for maximizing net economic benefit (NEB). The model could be formulated as a bi-level program with continuous variable(congestion toll) such that the upper level problem is for maximizing the NEB in elastic demand, while the lower level is for describing route choice of road users. The bi-level CNDP is intrinsically nonlinear, non-convex, and hence it might be difficult to solve. So, we suggest a heuristic solution algorithm, which adopt derivative information of link flow with respect to design parameter, or congestion toll. Two example networks are used for test of the model proposed in the paper.

Feasibility Study on the Construction of a Wood Industrialization Services Center for a Wood Industry Cluster Establishment in Jeollanam-do (전라남도 지역의 목재산업 클러스터 구축을 위한 목재산업화지원센터 설립의 타당성 검토를 위한 연구)

  • An, Ki-Wan;Park, Kyung-Seok;Ahn, Young Sang
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.4
    • /
    • pp.506-514
    • /
    • 2013
  • This study examined the feasibility on the construction of a wood industrialization service center for a wood industry cluster establishment in Jeollanam-do. Construction of the wood industrialization service center is based on a discount rate of 3.5%, an investment period of 4 years, a business operations period of 16 years and an investment cost of 24600 million won; the total amount of the net present value, the cost-benefit ratio and the internal rate of return were assumed to be 2.579 million won, 2.51%, and 10.1%, respectively. In addition, the production inducement coefficient, the induced production effect, the income-induced coefficient, the income inducement effect, the employment inducement coefficient, and the employment inducement effect were estimated 1.4345, 35287 million won, 0.1655, 4000.7 million won, and 0.4665, 1,145 people, in the effects of the wood related industries using the multi-regional input-output model, respectively. Financial independence of operating income to cover its own costs incurred in accordance with the operating project might be practicable.

A Study on the Reduction of Traffic Induced Contributions through Installing a Parking Guidance System (주차유도시스템 설치에 따른 교통유발부담금 경감을 위한 연구)

  • Choi, Yang-Won;Cho, Hyun-Seog
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.235-241
    • /
    • 2014
  • There are many traffic problems in a city such as parking, traffic jam caused by traffic induction facility. Therefore it is essential to demand for traffic demand management to building's owner whose building location causes traffic induction. According to the 90s traffic policy, government collects fee for traffic induction facility through traffic policy management and they encourage the building owner to join reduction of traffic jam program by reduction of traffic induction fee. However there are not many buildings owner joined this program because the program is not ghat beneficial. For example, if government set out parking guidance system (part of parking demanding system) in a city, it will reduce to 20% of traffic induced contributions but t can be used only once a year, so it is not efficient to used even it is valuable for about 10 years. In particular, according to the economic efficiency analysis, evaluate economically as net present value (NPV) to 2,160.44 million won, ratio of benefit/cost (B / C) to 2.44 during 10 years. Therefore this research will find out what is necessary for parking guidance system.

Assessment of domestic water supply potential of agricultural reservoirs in rural area considering economic index (경제성 지표를 활용한 농업용저수지의 생활용수 공급가능성 평가)

  • Yoon, Kwang-Sik;Choi, Soo-Myung;Chai, Jong-Hun;Yoo, Seung-Hwan;Choi, Dong-Ho;Yoon, Suk-Gun;Lee, Chang-Hee;Jung, Kyung-Hun;Shin, Gil-Chai
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.1
    • /
    • pp.85-96
    • /
    • 2017
  • Existing agricultural reservoirs are considered as alternative source for the water welfare of rural area. In this study, domestic water supply potential of 476 reservoirs, which has storage capacity more than one million cubic meter, out of 3,377 agricultural reservoirs managed by Korean Rural Community Corporation (KRC) were investigated. Among them water quality of 136 reservoirs met the criteria of domestic water source which show less than COD 3 ppm. Available amount for domestic water of reservoirs, which meet the water quality, for ten year return period of drought was analyzed with reservoir water balance model. The results showed that 116 reservoirs has potential for supplementary domestic water supply while satisfying irrigation water supply. Finally, economic analysis using Net Present Value (NPV), Benefit-Cost (B/C) ratio, Internal Rate of Return (IRR), and Profitability Index (PI) methods was also conducted. The analysis showed that 19 reservoirs satisfied economic feasibility when water is provided from reservoir outlet but only 9 reservoirs meet the economic feasibility if water delivered from a reservoir to treatment plant by newly built conveyance canal. In order to supply the domestic water through the agricultural reservoirs managed by KRC, it is necessary to flexibly interpret and operate the 'Rearrangement of Agricultural and Fishing village Act'. Also, it is reasonable to participate in the water service business when there is a supply request from other Ministries. In addition, the KRC requires further effort to change the crop system for saving water and improve efficiency of irrigation systems.

Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis (경제성분석에 의한 소수력 개발의 최적규모 결정 방안)

  • Kim, Kil-Ho;Yi, Choong-Sung;Lee, Jin-Hee;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.12
    • /
    • pp.995-1005
    • /
    • 2007
  • This study presents a framework for optimum scale determination for small hydropower development in a river basin. The framework includes the construction of hydrology and topography data, the simulation of hydropower operation, the economic analysis, and the determination of optimum scale of the small hydropower. The optimum scale of design flow and facility are determined by Net Present Value among economic analysis indices. The investment cost is estimated by the cost function derived from the construction cost of existing small hydropower plants. The benefit from power generation is estimated by the price announced by government. The presented framework is applied to the two potential sites in Cho River basin for the dam and run-of-river type of plants. Finally, the sensitivity analysis for a design flow and scale of the plant is performed for the each site. The usage of the framework presented in the study is highly expected for the estimation of potential hydropower resources or the decision support tool for a proprietor by estimating the optimum scale and economical feasibility in advance.

A Case Study on Selecting Sites for Wetland Restoration - Focusing on the Research Survey of National Inland Wetlands Monitoring in 2016 - (복원대상습지 선정 사례 연구 - 2016년 전국내륙습지 모니터링 결과를 중심으로 -)

  • Lee, Jung-Hwan;Lee, Chang-Su;Kim, Mi-Jeong
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.1
    • /
    • pp.71-81
    • /
    • 2019
  • This study aims to provide basic data for the decision-making process in selecting sites for wetland restoration projects. To this end, the current list of demaged wetlands was identified based on the findings from the nationwide monitoring project in 2016 targeted at wetlands in inland areas. Then, to determine the necessity of restoration for these demaged sites, the cause of demage was investigated, and their conservation value was examined from an ecological and legal perspective. The 2016 monitoring project identified a total of 20 demaged wetlands, of which one site was deemed to have high conservation value through analysis of its ecological and legal values and on-site reviews. The results of this study are expected to support policymakers' decision-making in selecting wetlands for restoration projects since it identifies priority sites among demaged wetlands that require immediate restoration efforts. It should also be pointed out that wetlands in South Korea cannot benefit from legal protection despite their high conservation value unless they have a designated status as protected areas.

A Business Model for Offshore Integrated Drilling Commissioning in Korea and Related Economic Analysis (우리나라 해양시추설비 통합시운전 사업 모델의 개발 및 경제성 분석에 관한 연구)

  • Lee, Chang-Woo;Cheon, Young-Wook;Shin, Sang-Hoon;Shin, Yong-John
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.1
    • /
    • pp.102-110
    • /
    • 2019
  • The shipbuilding and offshore plant industry of Korea is important and leads Korea's economic growth, designated as the 1st to 4th export items in Korea in terms of export contribution over the period from 2011 to 2015. This study proposes ways to improve the national competitiveness of Korean shipyards in the global offshore drilling market by reviewing a business model for providing an integrated offshore drilling commissioning service in Korea. This commissioning service model, which was attempted in 2014, was reviewed, and a new proposed business model for overcoming the limitations of the previous model and activating further business was evaluated. As a result of an economic evaluation, it was found that a 150-meter water depth model is economically more effective. As the number of integrated commissions increased from 2 to 5 times per year, NPV, IRR and B/C ratios increased and the fee per use decreased. Therefore, for offshore drilling facilities constructed and delivered in Korea, it will be necessary to encourage integrated offshore commissioning.

Path to Poverty of Sick Workers and Fictional Korean Social Security (아픈 노동자는 왜 가난해지는가? - 아픈 노동자의 빈곤화과정과 소득보장제의 경험)

  • Lee, Sophia Seung-yoon;Kim, Ki-tae
    • 한국사회정책
    • /
    • v.24 no.4
    • /
    • pp.113-150
    • /
    • 2017
  • This study analyzes how workers become impoverished and have their jobs less stabilized after they suffer from non-job-related sickness. Given that South Korea lacks sickness benefits, which most of OECD member states legislate and implement except US and Switzerland, this study examines its impact on laborers' job stability and povertization in Korea. The researchers have conducted in-depth interviews with nine former or present laborers who have the experiences and four experts on the issue in July-September, 2017 for the qualitative analysis. It is found that laborers, after becoming aware of their sickness, at first endure their pain without informing their employers not to lose their jobs. The attititude is observed especially among non-standard laborers, because sickness more often leads to job loss for them than for standard laborers. After workers have to leave their jobs due to their sickness in the end, they have no choice but to keep working in less stable jobs to compensate for income losses. They become gradually impoverished with their social capital like family bond declining. We observe laborers who are eligible for industrial accident insurance compensation could not benefit from the system because some employers refrain from the legal reporting duty. Due to this illegal practices, some industrial accident victims unduly lose their jobs due to "non-job-related sickness". Second, some employers report to the authority that their sick laborers have left their jobs 'voluntarily' even when they have quitted it without their volition, in which case the newly unemployed are not eligible for unemployment benefits. Large holes in Korea's safety nets for those suffering from multiple risks of sickness and unemployment.

An Analysis of Economic Evaluation and Spread Effects on the Establishment of Public Sports Facilities (공공스포츠시설 건립의 경제성 평가 및 파급효과 분석)

  • Kim, Jin-Kook;Jang, Won-Yong;Choi, Kyoung-Ho
    • Journal of Korea Entertainment Industry Association
    • /
    • v.13 no.1
    • /
    • pp.111-119
    • /
    • 2019
  • The purpose of study was to evaluate the economic evaluation of Chuncheon curling stadium. In oder to estimate economic evaluation, benefit/cost ratio, net present value and internal rate of return were used. Additionally, in order to investigate the socio-economic spread effect, literature review and input-output analysis were used. The results of study were as follows. First, as a result of analyzing the demand for curling stadiums in Chuncheon, it was believed that the construction of the stadium will attract athletes from the Chuncheon region as well as athletes from Seoul, Incheon, Gyeonggi Province and North Chungcheong Province. Second, economic validity analysis showed that the initial investment did not make sense, but the players' training and competitions and the advantages of the potential experience of curling events for citizens in nearby areas, including Chuncheon, make the construction and operation reasonable. Third, as a result of the review of the social and policy validity of the curling stadium, the project to build a curling stadium in Chuncheon was secured with a policy validity as a public sports facility necessary for both professional and living athletes. Finally, the analysis of socio-economic spread effect of curling stadiums had shown that it would have a positive effect on the level of satisfaction of the general public as well as the discovery of elite athletes.