• Title/Summary/Keyword: Near Line of Sight (NLOS)

Search Result 2, Processing Time 0.017 seconds

Traditional Software Development for WLAN Propagation Model

  • Ibrahim Anwar Hassan;Ismail Mahamod;Jumari Kasmiran;Kiong Tiong Sieh
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.1
    • /
    • pp.123-128
    • /
    • 2007
  • SPWPM traditional software development is surveyed and essential problems are investigated on the basis of system wireless link considerations. This paper presents the current state software planning tools for wireless LAN link optimization. The software directory is based on combination of MatLab and MapInfo software and measurement which gives the best grouping parameters to build up the software development. Among the requirements assumed, the WLAN site selections must be Line-of-sight (LOS) or near line of sight (NLOS) field strength prediction for either point to point or point to multi points. The results obtainable the out put of the program include two-dimensional (2D) and three dimensional (3D) plots for creating the link; design parameters through GUI representing the height and location for each antenna is depending on K-factor of the area and transmit antenna location.

Development of LBS used cellular phone (상용 휴대폰을 이용한 LBS 시스템 구축)

  • Lee, Kyoung-Gyu;Lee, Yong-Woo
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.185-190
    • /
    • 2007
  • This article describes a development CDMA LBS in order to apply to "Control System of Underground Infrastructure Fire Accident" which one of U-City Projects of Seoul City. Our goal guides taking shelter of the sufferer it will not be able to use a GPS when the fire occurs from subway station. There are Location measurement methods which measures the AOA(Angle of Arrival) of the signal which it sends with the MS(Mobile station) from the BS(Base station), an electronic delivery time (TOA:Time of Arrival) and the relative difference of electronic arrival time from Base stations (TDOA:Time Difference of Arrival). This time the error due to a multiplex course error and near-far problem and NLOS(Non Line of Sight). We are planning to construct the Test Bed which is an error below 1 meter.

  • PDF