• Title/Summary/Keyword: Nam Ngum River

Search Result 2, Processing Time 0.02 seconds

Development of Multi-Reservoir System Operation Rule Curves for Hydropower Maximization in the Nam Ngum River Basin of Lao PDR (라오스 남능강 유역 다중 저수지 시스템의 최적 수력발전 운영규정 곡선 개발)

  • Lee, Hyun-Jae;Jang, Woong-Chul;Lee, Il-Ju;Lee, Jin-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.803-814
    • /
    • 2022
  • The Lao government is continuously developing hydro-power dams in addition to the existing eight power plants in the Nam Ngum River basin and is expanding the power capacity of the existing power plants to meet the expected increase in electricity demand. Accordingly, the Lao government has requested an update on the existing reservoir operating rule curve in order to run the power plants efficiently. To this end, this study reviewed the current independent operating system as well as the joint operating system in order to maximize the annual power generation produced by a power plant by using CSUDP, general-purpose dynamic programming (DP) software. The appropriate operating regulation curve forms (URC/LRC, MRC) were extracted from the DP results, and the annual power generations were simulated by inputting them as the basic operating data of the reservoir operation set of the HEC-ResSim program. By synthesizing the amount of the annual power generation simulated, the existing operation regulation curve, the operational performance, and the opinion of the field operator, the optimal reservoir operation regulation curves that maximize the annual power generation of the target power plant were developed. Results revealed that a system operating in conjunction with the reservoir produces about 2.5 % more power generation than an independent reservoir due to the synergistic effect of the connection.

Development of reservoir operation rule curve using DP for max hydro-power generation of power station in the Nam Ngum River in Lao PDR. (라오스 남능강 발전소의 최대전력생산을 위해 동적계획법을 활용하여 저수지 운영규정곡선 개발)

  • Lee, Hyun Jae;Jang, Woong Chul;Lee, Il Ju;Lee, Jin Hee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.106-106
    • /
    • 2021
  • 라오스 남능강 유역에는 현재 11개의 수력 발전 댐이 운영되고 있으며 최근에 설치된 댐을 제외하고는 오래전에 개발된 운영규정 곡선에 근거하여 운영하고 있다. 즉 댐의 증설에 따른 하천 유량의 변동과 발전소의 설비용량증설 등의 발전환경이 충분히 반영되지 못한 상태로 운영하고 있으며, 이로 인해 통합수자원 관리의 최적화 차원의 일환으로 최대 전력생산을 위한 새로운 저수지 운영규정 곡선 개발이 필요하게 되었다. 저수지 운영규정 곡선(reservoir operation rule curve)은 일반적으로 주어진 저수지의 규모와 저수지로의 유입량 그리고 발전소의 설비용량 등의 발전환경을 종합적으로 고려하여 연간 발전량을 최대로 생산할 수 있도록 최적화 기법 등을 활용하여 개발한다. 본 고에서는 이를 위해 범용적인 동적 계획법(Dynamic Programming:DP)프로그램인 CSUDP를 활용하여 최초의 최적 저수지 운영규정 곡선을 제시하고 이에 의한 발전량을 모의하기 위해 HEC-ResSim package를 활용하였으며, 최종적으로는 기존의 운영규정 곡선, 운영실적, 그리고 현장 운영자의 의견 등을 종합적으로 고려하여 댐 운영 시나리오(단독, 연결, 댐별 상업 발전 시기 등)별로 운영규정 곡선을 개발하고 라오스 정부(EdL)에 제시하였다.

  • PDF