• 제목/요약/키워드: N-BACK program

검색결과 102건 처리시간 0.024초

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

기무라씨 질환, 5 예 보고 (REPORT OF EXPERIENCE WITH KIMURA'S DISEASE)

  • 설대위;박윤규;이광민
    • 대한두경부종양학회지
    • /
    • 제5권1호
    • /
    • pp.39-46
    • /
    • 1989
  • 기무라씨 질환은 특히 두경부 부위에 피하 종괴를 일으키는 만성염증성, 증식성 질환이다. 저자들은 최근 치험하였던 본 질환 5 예를 한국외과 문헌에 처음으로 보고하는 바이다. 기무라씨 질환은 크게는 ALHE(Angiolymphoide Hyperplasia with Eosinophilia) 의 범주에 속한다. 본 질환의 병리학적 특징은 증식된 lymphoid follicles, eosinophilic infiltration 과 혈관의 증식성이다. 이 질환은 이하선, 악하선 및 상부 경부 부위등에 흔히 종괴를 일으키며 이들 종괴들은 피하조직 뿐만 아니라 타액선과 상부 경부 임파선에까지도 파고 든다. 저자들의 증례 중 한명에서는 서혜부에 종괴가 있었으며 새로이 증식된 혈관과 동상들 (Sinusoids) 로 인하여 혈관 분포가 매우 풍부하였다. 저자들 증례 5 명의 평균 연령은 35세이었지만 한명을 제외한 나머지 모두는 38세 이하이었다. 남녀비는 3:2 이었으며 증상의 평균 기간은 5.2 년이었다. 전례에 있어서 말초 혈액 소견상 Eosinophilia 가 있었다. 전례에서 다발성 종괴들을 보였으며 가끔은 대칭적이기도 하였다. 저자들이 시행한 치료 양상은 수술만 시행한 경우와 수술 및 스테로이드 홀몬요법 시행 경우가 각각 1례씩이었고 수술과 방사선조사 경우가 2례이었으며 나머지 1례에서는 수술, 스테로이드 홀몬요법 및 방사선조사의 복합치료를 실시하였다. 저자들은 기무라씨 질환과 ALHE 질환과의 관계를 고찰해 보았으며 기무라씨 질환의 치료 경험을 보고하는 바이다.

  • PDF