In this study, an integrated economic analysis model to analyze the new telecommunication services is developed. This model considers both the technological and managerial aspests altogether with respect to the profit and public benefit criteria. To encounter the various dynamically changing environments and evaluation criteria, multiple criteria decision making (MCDM)techniques are employed. The model consists of three stages; The first stage surveys related formal or informal data, generates analysis alternatives, and performs acceptabillty test in view of marketing. The second stage generates executive alternatives for each acceptable analysis alternative and checks the executionability in view of telecommunication technologies. The third stage performs the final integrated economic analysis including the profitability analysis. This study offers a basis for the future development of decision support system or expert system on the economic analysis of the new telecommunication services.
Shokri, Hamidreza;Ashjari, Behzad;Saberi, Morteza;Yoon, Jin Hee
Industrial Engineering and Management Systems
/
v.12
no.4
/
pp.389-405
/
2013
A facility layout design (FLD) problem can be generally introduced as assignment of facilities (departments) to a site such that a set of criteria are satisfied or some objectives are minimized (maximized). Hence, it can be considered as a multi-criteria problem due to the presence of qualitative criteria such as maintenance or flexibility and quantitative criteria such as the total cost of handling material. The VIKOR method was developed to solve multiple criteria decision making problems with conflicting and non-commensurable (different units) criteria, assuming that compromising is acceptable for conflict resolution, the decision maker wants a solution that is the closest to the ideal, and the alternatives are evaluated according to all established criteria. This paper proposes a hierarchical analytic hierarchy process (AHP) and VIKOR approach to solve the FLD problem. A computer-aided layout-planning tool is adopted to generate the facility layout problems, as well as their quantitative data. The qualitative performance measures are weighted by AHP. VIKOR is then used to solve the FLD problem. Finally, the proposed integrated procedure is applied to three real-time examples.
Journal of the Korea Institute of Information and Communication Engineering
/
v.15
no.1
/
pp.1-8
/
2011
To visualize a strategic plan including resource allocations and standardization schedules, it is important to set priorities among information and communication technologies(ICTs) standardization work areas(SWAs). This ranking process involves decision making process with multiple criteria which results a complex selection problem. In this study, analytic hierarchy process(AHP) is employed and applied to solve this decision making problem. The processes and results are illustrated for an effective strategic plan in standardization decision processes.
Journal of the Korea Institute of Building Construction
/
v.2
no.1
/
pp.147-154
/
2002
In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.
Supplier selection is one of the most important activities of a company. This importance is increased even more by new strategies in a supply chain, because of the key role suppliers perform in terms of quality, costs and services which affect the outcome in the buyer's company. In addition, green production has become an important issue for almost every manufacturer and will determine the sustainability of a manufacturer. Therefore a performance evaluation system for supplier and green suppliers is necessary to determine the suitability of suppliers to cooperate with the company. Supplier and green supplier selection is a multiple criteria decision making problem in which the objectives are not equally important. In practice, vagueness and imprecision of the goals, constraints and parameters in these problems make the decision making complicated. The objective of this study is to construct a decision-making process using fuzzy analytic hierarchy process (FAHP) and balanced scorecard (BSC) for evaluating supplier and green suppliers in the manufacturing industry. The BSC concept is applied to define the hierarchy with four major perspectives and performance indicators are selected for each perspective. FAHP is then proposed in order to tolerate vagueness and ambiguity of information. Finally, FAHP is applied to facilitate the solving process. With the proposed approach, manufacturers can have a better understanding of the capabilities that supplier and green supplier must possess and can evaluate and select the most suitable supplier for cooperation.
Because of rapid evolution of software technique, numerous software professionals have been concerned with component based development methodologies. However, it is hard to find out a systematic technique for the selection of COTS (Commercial Off The Shelf) component in consumer position. Up to date, the major of component quality evaluation is object-oriented metric based evaluation methodology. But this paper present four step process and evaluation criteria based on MCDM (Multiple Criteria Decision Making) technique for optimal COTS component selection in consumer position. We considered funtionality, efficiency, usability based on IS0/IEC 9126 for Quality measurement and executed practical analysis about commercial EJB component in internet. This paper show that the proposed selection technique is applicable to optimal COTS component selection.
Traffic volume data have been used for the plan, the design, and the operation of highway. Since 1955, traffic survey has been nation- widely carried out at national highway and the regular survey in national highway has been conducted at the intersections of highways. However, it is critical issue to select the priority of the regular survey because it is almost impossible to conduct regular survey at all intersections of national highways. In this study, MCDM(Multiple Criteria Decision Making) using AHP(Analytic Hierarchy Process) was applied to decide the priority of the regular survey. The following standard variables for determining the priority was selected the highway plan variables[AADT, VKT, Peak Hourly Volume, Location of highway from Urban], the highway design variables[Volume(pcu), Directional Traffic Volume, Heavy Vehicle Rate], and the highway operation variables[Speed, Density, V/C]. The standard variables were quantified and normalized. Using the Eigen vector method, the weighted values of each hierarchy based on the pair-wise comparison values from the questionnaire survey were calculated. The selection of the priority of regular survey was dependent on the size of the product of the weighted values for each hierarchy and the normalized values for the standard variables. Finally, the priority of regular survey of the intersections of national highways was determined according to the order in the size of the product of two values.
Journal of Korean Society of Industrial and Systems Engineering
/
v.46
no.4
/
pp.199-208
/
2023
Taguchi method is one of the most popular approaches for design optimization such that performance characteristics become robust to uncontrollable noise variables. However, most previous Taguchi method applications have addressed a single-characteristic problem. Problems with multiple characteristics are more common in practice. The multi-criteria decision making(MCDM) problem is to select the optimal one among multiple alternatives by integrating a number of criteria that may conflict with each other. Representative MCDM methods include TOPSIS(Technique for Order of Preference by Similarity to Ideal Solution), GRA(Grey Relational Analysis), PCA(Principal Component Analysis), fuzzy logic system, and so on. Therefore, numerous approaches have been conducted to deal with the multi-characteristic design problem by combining original Taguchi method and MCDM methods. In the MCDM problem, multiple criteria generally have different measurement units, which means that there may be a large difference in the physical value of the criteria and ultimately makes it difficult to integrate the measurements for the criteria. Therefore, the normalization technique is usually utilized to convert different units of criteria into one identical unit. There are four normalization techniques commonly used in MCDM problems, including vector normalization, linear scale transformation(max-min, max, or sum). However, the normalization techniques have several shortcomings and do not adequately incorporate the practical matters. For example, if certain alternative has maximum value of data for certain criterion, this alternative is considered as the solution in original process. However, if the maximum value of data does not satisfy the required degree of fulfillment of designer or customer, the alternative may not be considered as the solution. To solve this problem, this paper employs the desirability function that has been proposed in our previous research. The desirability function uses upper limit and lower limit in normalization process. The threshold points for establishing upper or lower limits let us know what degree of fulfillment of designer or customer is. This paper proposes a new design optimization technique for multi-characteristic design problem by integrating the Taguchi method and our desirability functions. Finally, the proposed technique is able to obtain the optimal solution that is robust to multi-characteristic performances.
Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.8
/
pp.2809-2817
/
2010
The scholarly concern of train industry has been improved, since country focuses on this field. Especially, train maintenance facility has been studied for construction, because the facility is important to inspect the train that transports passenger and cargo. Various operation plans and criteria are considered to build train maintenance facility. In this paper, the decision making of train maintenance facility for construction is studied and analyzed with simulation, because mathematical theory is restricted to consider various operation plans and criteria. Through simulation, we analyze warm-up after selecting dependent factors, and extract data. The data is used to select a alternative in this problem, Multiple Attribute Decision Making(MADM). Previous study is difficult, complex and subjective for decision making. However, entropy measurement we used help decision maker for decision making, easily, simply, and objectively. This method can have decision maker choose the best alternative in case the train maintenance facility construction is fast revitalized.
Kim, Gil-Ho;Yi, Choong-Sung;Yeo, Gyu-Dong;Shim, Myung-Pil
Journal of Korea Water Resources Association
/
v.42
no.12
/
pp.1029-1038
/
2009
Recently, it is expected that small hydropower (SHP) could potentially provide sufficient amounts of alternative energy in Korea where there is an abundance of potential sites and where social efforts are being made to reduce the emissions of green house gases. In the past, the resources survey for SHP development has been carried out using onsite surveys and paper maps, which incurred a great deal of time and cost. Furthermore, the tools for decision making such as determining development priorities or evaluating feasibility have been considered only economic aspect and focused on the performance characteristics of power generation. However, as the concept of sustainable development has been being advanced in recent years, especially focused on human-social, environmental and ecological in addition to economical sector; the consideration of these multiple criteria has become essential for sustainable SHP development. This study aims to propose the spatial multi-criteria decision making (MCDM) methodology for determining priorities among a number of locations on the planning stage of SHP development using AHP and GIS. The proposed methodology is applied for determining development priorities among the SHP locations in Cho River basin and this study presents the detailed spatial information data and the results of development priorities. As a fundamental work, this study will be beneficial to the future activation of SHP development and will help the decision making in evaluating the feasibility of SHP development.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.