• Title/Summary/Keyword: Multiple Projects

Search Result 332, Processing Time 0.082 seconds

Relations between Scenic Desirability and Landscape Component of the Copse in the City Park

  • Lee, Hyuk-Jae;Koshimizu, Hajime
    • Proceedings of the Korean Institute of Landscape Architecture Conference
    • /
    • 2007.10b
    • /
    • pp.72-77
    • /
    • 2007
  • Civic participation in managing the work of a park is a natural experience, and urban culture has a role in forming and communicating ideas. However, when it comes to managing a copse, there is no clear scenic image. In this study, my intention was to determine a desirable scene involving a copse and suggest a target image for managing work from a scenic perspective. I selected 12 photographs and listed 10 pairs of adjectives that were judged to reflect the effect produced by the copse scene using the repertory grid development technique. In addition, I performed a scenic evaluation using the semantic differential(SD) method with each pair of adjectives. Factor analysis was performed based on questionnaire survey results, such that the scenic structure of the copse had a clear definition. In addition, the physical characteristics of the photographs were analyzed using Adobe Photoshop 6.0 and the correlations between the results of the questionnaire survey were understood using multiple regression analysis. A desirable scenic image of the copse became clear through this process and I was able to suggest various options of scenic images. Taking the aspects of urban culture into consideration, park improvement projects(including their planning stages) should be implemented by involving residents, which will lead to further development of park planning and maintenance theories and projects giving due consideration to residents' opinions.

  • PDF

Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects (정성변수를 고려한 공공아파트 기획단계 공사비 예측모델)

  • Ji, Soung-Min;Hyun, Chang-Taek;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.91-101
    • /
    • 2012
  • In planning phase of Public Multi-Housing Projects, it is required to develop the methodology and criteria for fair cost prediction with influencing power from planning phase to occupancy phase. Many studies still have focused on the prediction of cost by multiple regression. However, there is no logical explanation about the influence of nonmetric variables for the prediction of cost in planning phase. Accordingly, this research pursues a cost prediction model including nonmetric variables for use in planning phase. There are 3 steps of this research : 1) Finding the factors influencing construction cost and assigning variables for a multiple regression. 2) Conducting a dummy regression analysis with nonmetric variables and model validation by comparing actual cost data. 3) Developing the ratio of RC structure cost to wall structure cost by using cost predection model. The results could establish cost prediction process including the influence of nonmetric variables and the ratio of RC structure cost to wall structure cost.

MULTIPLE LINEAR REGRESSION APPROACH FOR PRODUCTIVITY ESTIMATION OF BULLDOZERS

  • Abbas Rashidi;Hoda Rashidi Nejad;Amir H. Behzadan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1140-1147
    • /
    • 2009
  • Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.

  • PDF

Government-funded Projects' Effects in Revitalizing the Urban Commercial District for Small and Medium Retail Merchants (도심지 상업지역의 정부 지원사업 효과 분석)

  • Kang, Seong-Ha;Lee, Jung-Hee;Hwang, Seong-Hyuk
    • Journal of Distribution Science
    • /
    • v.12 no.12
    • /
    • pp.101-106
    • /
    • 2014
  • Purpose - This study reviews the achievements of a pilot project for the revitalization of a commercial district performed for three years after its establishment in 2011. The project for the revitalization of the commercial district was performed to create a new local community space in connection with the traditional market and nearby districts. Although it was a pilot project, the project for the revitalization of the commercial district has been performed for almost three years. Therefore, this seems a proper time to conduct an interim evaluation of the project. This study aims to review and evaluate how the government support policy is influential for the revitalization of the commercial district. In other words, this research aims to identify what projects positively affected consumers' intention to revisit the downtown commercial area among the commercial district revitalization projects-promotion events, promotion activities, education, merchants cooperation system, IT projects, cultural events, and residents' communication. Research design, data, and methodology - This study designated seven management improvement projects affecting commercial district revitalization based on preceding studies. The survey of the degree of satisfaction on seven management improvement projects was executed targeting consumers who visited the commercial areas. Additionally, visitors' revisit intentions regarding currently visited commercial areas were also investigated. Therefore, revisit intention was set as a dependent variable and the satisfaction degrees of the respective management improvement projects were set as the independent variables. A total of 1,209 consumers were examined in six districts in the country. Result - Multiple regression analysis results showed that cultural events, education, the merchants' cooperation system, and IT projects brought statistically significant effects to the revisit intentions of consumers. In contrast, promotion events, resident communication projects, and promotion activities did not affect the revisit intentions of consumers. Particularly, the residents' communication project did not show significant influence because of consumers' recognition that it is similar to a cultural event. Conclusion - The following implications for the revitalization of business districts in the urban central area are drawn. From a general perspective, the businesses of culture, education, and cooperative system among seven businesses play positive roles regarding the intention to revisit so that the project is required to be promoted periodically through unique performances differentiated for each district, the merchant training reinforced for professionalism, and the expansion of joint events of merchants. Moreover, the sales promotion project and public relations activity are shown to be not influential to the intention to revisit. Therefore, while short-term sales promotion such as one-time gift events are required, sales promotion and public relation activities to induce revisits by mileage savings and accumulated gift presentation to attract long-term customers are required. The IT business is positively influential to the intention of revisit. Therefore, detailed information on the revitalized commercial district should be provided and additional functions such as discount coupons for continuous utilization should be included in the mobile app and the website.

Factors Affecting the Performance of Agricultural Project from the Perspectives of Agriculture Extension Workers - A Case Study of Malawi - (농촌지도사의 관점에서 본 농촌개발 성과 영향요인 - 말라위 사례 -)

  • Tuchitechi, Hawonga;Lee, Misook
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.2
    • /
    • pp.111-120
    • /
    • 2018
  • This study aims to identify the factors influencing the perofrmance of agricultural projects for small farmers in Malawi. This cross-sectional study was conducted to discover the factors behind the slow performance of agricultural projects in alleviating poverty. The research was conducted in the Karonga and Phalombe Districts in the northern and southern parts of Malawi, respectively. The data were collected through a structured questionnaire survey administered to 82 agriculture extension workers, and a multiple regression analysis was conducted. The results indicated that farmers' socioeconomic factors, including high illiteracy and poverty rates, poor participation regarding project implementation, and high dependency syndrome, significantly affected the performance of agricultural projects. Within the projects them selves, this study discovered that there was no consistent flow of funds. This greatly affected the schedule of project activities, thereby compromising performance. The study recommends that the government and all relevant stakeholders work jointly to alleviate poverty. It is especially important to ensure that smallholder farmers are equipped with self-help capabilities. In addition, it is critical to examine the issues of funding disbursement.

Improved Strain Influence Diagram and Settlement Estimation for Rectangular and Multiple Footings in Sand (수정변형률 영향계수에 근거한 직사각형 및 복합 얕은기초 침하량 산정법)

  • Park, Dong-Gyu;Lee, Jun-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.633-640
    • /
    • 2005
  • Most existing methods for the footing settlement estimation are for either isolated or strip footings. No sufficient details are available for settlement calculation of footings with different shapes and multiple footing conditions, which are commonly adopted in actual construction projects. In this paper, estimation of footing settlements for various footing conditions of different shapes and multiple conditions is investigated based on Schmertmann's method with focus on values of the strain influence factor $I_z$. In order to examine the effect of multiple footing conditions, field plate load tests are performed in sands using single and double plates. 3D non-linear finite element analyses are also performed for various footing conditions with different footing shape and distance ratios. Results obtained in this study indicate that there are two significant components in the strain influence diagram that need to be taken into account for settlement estimation of rectangular and multiple footings: depth of $I_{zp}$ and depth of strain influence zone. Based on results from experimental and 3D non-linear finite element analyses, improved strain influence diagrams available for various footing conditions are proposed.

  • PDF

An improved algorithm for the exchange heuristic for solving multi-project multi-resource constrained scheduling with variable-intensity activities

  • Yu, Jai-Keon;Kim, Won-Kyung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.04a
    • /
    • pp.343-352
    • /
    • 1993
  • In this study, a modified algorithm for the exchange heuristic is developed and applied to a resource-constrained scheduling problem. The problem involves multiple projects and multiple resource categories and allows flexible resource allocation to each activity. The objective is to minimize the maximum completion time. The exchange heuristkc is a multiple pass algorithm which makes improvements upon a given initial feasible schedule. Four different modified algorithms are proposed. The original algorithm and the new algorithms were compared through an experimental investigation. All the proposed algorithms reduce the maximum completion time much more effectively than the original algorithm. Especially, one of four proposed algorithms obviously outperforms the other three algorithms. The algorithm of the best performance produces significantly shorter schedules than the original algorithm, though it requires up to three times more computation time. However, in most situations, a reduction in schedule length means a significant reduction in the total cost.

  • PDF

Deriving an Overall Evaluation Index with Multiple CTQs in Six Sigma Management

  • Ko, Seoung-Gon;Cho, Yong-Jun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.19 no.4
    • /
    • pp.1255-1267
    • /
    • 2008
  • Evaluation indices for products or services are important to improve the internal process of the company and to compare those with competitive ones. The sigma level in Six Sigma management does important role to evaluate the core characteristic, CTQ(Critical To Quality), derived in the considered product/service or process. In this research, we propose an overall evaluation index for the product/service or process with multiple characteristics, in other words, multiple CTQs. The proposed overall evaluation index is useful for the cases that the single CTQ is not enough to evaluate the practical interests, for example, the final products and services with complex procedures and relatively large scaled processes. This approach is discussed with sigma level for applying Six Sigma Projects, however, it is applicable to indices based on proportion or percentage as well. The practical examples with a manufacturing process and a customer survey based on focus group interview are given for illustrations.

  • PDF

Interest based-participation requiring accountability in greening

  • Park, Mi Sun
    • Forest Science and Technology
    • /
    • v.14 no.4
    • /
    • pp.169-180
    • /
    • 2018
  • The Republic of Korea (ROK) has had a successful experience in greening its land because of strong state policy and public participation. This paper aims to analyze the interest positions, participation, and accountability of multiple actors in the process of greening movements in the ROK. These movements were divided into two phases: forest rehabilitation (1973-1997) and urban greening (1998-2017). During the first phase, farmers caused deforestation by slash-and-burn farming and illegal logging, and governmental agencies acted as helpers controlled the farmers' deforestation activities. During the second phase, government agencies and enterprises caused deforestation with urban development projects, including construction of housings and roads. Multiple actors including citizens, NGOs, and enterprises helped urban greening through campaigns, donations, and monitoring. As a result, managing interest positions is significant to motivate multiple actors to participate in the greening movement. Participation with clear accountability is meaningful for successful greening. Therefore interest-based participation requiring accountability contributes to greening. This phenomenon indicates interconnection for interest positions, participation and accountability should be considered in designing greening policies.

A DECISION SUPPORT MODEL FOR PROCUREMENT OF REUSABLE MATERIALS IN MULTIPLE PROJECT MANAGEMENT

  • Ju-Yeoun Han;Dong-Woo Shin ;Kyung-Rai Kim ;Sang-yoon Chin;Hee-Sung Cha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1100-1105
    • /
    • 2005
  • To compete with large construction companies whose dominance in market share is deepening recently, the needs for improving field production system of mid-size construction companies have increased rapidly. The development of an adequate model that focuses on the organizational size and work process of the mid-size construction companies are needed to increase productivity through the informatization in the construction industry[0]. The authors of this study used case studies on the problems of the mid-size construction companies in procuring work and presented a method to solve such problems so that the managers in head office of those mid-size construction companies can effecitively deal with multiple sites[0].

  • PDF