• 제목/요약/키워드: Multiple Projects

검색결과 338건 처리시간 0.03초

BIM 기반의 IPD 발주방식에 관한 연구 (A Study of Integrated Project Delivery(IPD) Methods Based on Building Information Modeling(BIM))

  • 신규철;함인호
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권3호
    • /
    • pp.15-25
    • /
    • 2012
  • The purpose of this research is to explore the necessity of utilizing IPD methods along BIM based project operation in domestic construction market. IPD is relatively new project delivery methods focused on the collaboration of stockholders based on BIM technology. IPD is focused on the multiparty contract process rather than multiple bilateral contracts under Traditional Project Delivery Methods. The research method is to investigate the IPD standard contract documents, successful IPD project cases in the U.S. The research results are as follows. The model for an IPD standard contract needs to be developed for the application to a real construction projects. Various types of IPD model contract need to be developed to accommodate the requirements of industry and stockholders in Korea.

불확실한 환경에서의 다특성치 강건설계를 이용한 생산시스템 설계에 관한 연구 (A Study on Design of Production System Using Multiple Characteristics Robust Design in Uncertain Environment)

  • 양광모;서장훈;박진홍;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2004년도 춘계학술대회
    • /
    • pp.61-65
    • /
    • 2004
  • As technique that can contribute in quality improvement in design process to overcome shortcoming of traditional quality control, call design or development department quality control activity that is achieved to reduce gun damage shuddering at circle minimizing change or side effect of product performance as off-line quality control. This paper discuss optimal process design of investment projects expansion and replacement investment on each line or individual in the production. Generally optimal plant design has add to a few method by Subsidiary means with use a especial method. And then in this paper, a Robust design is presented, which may be effective to the processes appraisal or improvement. We propose that should make a optimal plant design model for reducing field failure rate to assign by real data on different factors in plant system. Using this model, robust design of taguchi method used in this comprehensive method for reducing field failure rate in plant system.

  • PDF

New Approach to Inter-domain Multicast Protocols

  • Leal, Raquel Perez;Cachinero, Juan Angel;Martin, Encarna Pastor
    • ETRI Journal
    • /
    • 제33권3호
    • /
    • pp.355-365
    • /
    • 2011
  • IPTV broadcast channels and video content distribution are increasingly saturating network paths. New solutions based on inter-domain multicast protocols could contribute to the enhancement of multimedia content distribution over the Internet. The aim of this paper is to propose new capabilities for an existing inter-domain multicast protocol, the Protocol Independent Multicast-Sparse Mode. We describe the modified protocol and analyze its behavior using newly developed tools based on an open-source software simulator. The resulting protocol does not require topology information, which is advantageous for easier deployment. In addition, the adopted solution avoids inherent problems with inter-domain multicast routing, such as multiple paths and path asymmetries.

비정형 패널 분할 시 영향요인 분석 (Analysis of influence factors on panelizing of free-form buildings)

  • 이동훈;임지영;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.126-127
    • /
    • 2015
  • New technologies using a CNC machine to reduce the production cost of free-form buildings are being developed. To produce free-form members with such technologies, a vast free form building should be first divided into multiple panels that can be produced. Considering the curved surface of free-form buildings, the shape and size of divided freeform panels vary, which will lead to a great deal of errors. Currently, the engineers and designers complete the panelizing work through trials and errors even in large-scale projects, which results in increased construction duration and cost. Thus, it is necessary to develop a freeform panelizing technology to maximize the economic effects of free-form concrete member production technology. The purpose of the study is to analyze influence factors on panelizing of free-form buildings, which is a preceding research for development of a panelizing technology. The influence factors drawn will provide a core basis for development of panelizing technologies for free-form buildings.

  • PDF

A Simple Java Sequence Alignment Editing Tool for Resolving Complex Repeat Regions

  • Ham, Seong-Il;Lee, Kyung-Eun;Park, Hyun-Seok
    • Genomics & Informatics
    • /
    • 제7권1호
    • /
    • pp.46-48
    • /
    • 2009
  • Finishing is the most time-consuming step in sequencing, and many genome projects are left unfinished due to complex repeat regions. Here, we have developed BACContigEditor, a prototype shotgun sequence finishing tool. It is essentially an editor that visualizes assemblies of shotgun sequence fragment reads as gapped multiple alignments. The program offers some flexibility that is needed to rapidly resolve complex regions within a working session. The sole purpose of the release is to promote collaborative creation of extensible software for fragment assembly editors, foster collaborative development, and reduce barriers to initial tool development effort. We describe our software architecture and identify current challenges. The program is available under an Open Source license.

유전자 알고리즘을 이용한 매트릭스조직의 객체지향개발 프로젝트 스케줄링 (Project Scheduling for Object-Oriented Development in Matrix Organization)

  • 이건호;김은진
    • 대한안전경영과학회지
    • /
    • 제9권5호
    • /
    • pp.67-78
    • /
    • 2007
  • This paper discusses a scheduling problem on object-oriented developments over multiple teams with limited resources in matrix organization. The objective of the problem is to minimize the makespan of overall projects. There are tangible and intangible advantages such as efficient resource share, improvement of productivity, development efforts and cost reduction, etc. by dispatching resources properly to the development teams. Traditionally, the project scheduling has been done with a manager's intuition or heuristic. We present a scheduling model with illustrative examples, stochastic search approach, and apply a variety of problems generated randomly to the approach. The results are analysed.

A critical analysis of the Incheon Free Economic Zone:Can Incheon move beyond being a gateway to Seoul?

  • McCarty, Dakota;Park, Ju Moon
    • 도시과학
    • /
    • 제7권2호
    • /
    • pp.61-70
    • /
    • 2018
  • Incheon, South Korea, is a rapidly growing port city that has long held an important role in the country. While for most of its history it has been considered more of a coastal extension of Seoul, it is now trying to grow from that role and become a global city. National and local initiatives and acts have led to the Incheon Free Economic Zone (IFEZ). This large zone connects three smaller districts into one large project. The goal of the project is to assert Incheon as its own city and go beyond its role as merely a gateway to Seoul. However, as most large-scale projects go, there are multiple issues and constraints faced by the IFEZ. This paper analyzes the project and gives critique on how the project could possibly achieve its goal more quickly.

Policy Suggestions for Fostering Teacher ICT Competencies in Developing Countries: An ODA Project Case in Peru

  • SO, Hyo-Jeong;SEO, Jongwon
    • Educational Technology International
    • /
    • 제21권2호
    • /
    • pp.217-247
    • /
    • 2020
  • Many developing countries consider ICT as a key enabler to improve their educational systems and teachers are viewed as change agents. This paper aims to present policy suggestions concerning how to foster teachers' ICT competencies in developing countries based on the outcomes of an ODA project case in Peru. This study was conducted through three stages: Literature survey, site visit, and policy suggestions. To draw relevant policy suggestions, we employed the framework of the 'macro-meso-micro' level of teacher professional development. The following policy suggestions are discussed: (a) macro level: to develop the national framework of teacher ICT competencies and competency-based teacher training, (b) meso-level: to promote teacher communities of practices and school-based research programs, and (c) micro-level: to redesign teacher professional development programs to help teachers better understand the complex relationships between content, pedagogy, and technology, beyond learning about basic ICT literacy skills. This study contributes to the understanding of how ODA projects can approach the issue of teacher ICT capacity building at multiple levels.

ICT-SUPPORTED COLLABORATIVE WORKING IN CONSTRUCTION

  • Geoffrey Qiping Shen
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-70
    • /
    • 2009
  • This paper explores the ways in which collaborative working among multiple disciplines in building projects can be more effective and efficient. It focuses on the support that can be provided by the latest development in information and communication technologies. It also considers the growing interdependence between participants in the process and their changing roles as they harness the power of the new technologies in new collaborative arrangements. It is argued that collaborative working should be addressed holistically from the technological angle, the social angle, as well as the organisational angle, to ensure its successful implementation in the construction industry. A case study is given to illustrate the use of ICT in supporting value management studies. The key issues surrounding the emerging field of research - collaborative construction information management - and the potential benefits and challenges of its wide adoption are discussed at depth.

  • PDF

STATISTICALLY PREPROCESSED DATA BASED PARAMETRIC COST MODEL FOR BUILDING PROJECTS

  • Sae-Hyun Ji;Moonseo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.417-424
    • /
    • 2009
  • For a construction project to progress smoothly, effective cost estimation is vital, particularly in the conceptual and schematic design stages. In these early phases, despite the fact that initial estimates are highly sensitive to changes in project scope, owners require accurate forecasts which reflect their supplying information. Thus, cost estimators need effective estimation strategies. Practically, parametric cost estimates are the most commonly used method in these initial phases, which utilizes historical cost data (Karshenas 1984, Kirkham 2007). Hence, compilation of historical data regarding appropriate cost variance governing parameters is a prime requirement. However, precedent practice of data mining (data preprocessing) for denoising internal errors or abnormal values is needed before compilation. As an effort to deal with this issue, this research proposed a statistical methodology for data preprocessing and verified that data preprocessing has a positive impact on the enhancement of estimate accuracy and stability. Moreover, Statistically Preprocessed data Based Parametric (SPBP) cost models are developed based on multiple regression equations and verified their effectiveness compared with conventional cost models.

  • PDF