• Title/Summary/Keyword: Multi-hosing

Search Result 2, Processing Time 0.015 seconds

A Study on Developing an Evaluation Model for Criticizing the Model house of Multi-family Housing (공동주택 모델하우스 비평을 위한 평가모델 개발에 관한 연구)

  • 전경화;홍형옥;김정근
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 1999.04a
    • /
    • pp.133-136
    • /
    • 1999
  • This study intends to develop an evaluation model which could be used as an effective tool for criticizing the model house of multi-family housing. The evaluation model has been developed based on the theoretical framework suggested by previous results of research related on hosing design, which comprises the following four components: 1) the paradigm of future home and life-style, 2) marketing effects of housing developer, 3) goals and principles of housing design, and 4) results of user-preference study. In this study, an evaluation model was suggested as a preliminary form which would be modified in detail after series of tests in the field. The evaluation model will be used provide standardized criteria for the quality of model houses, and eventually help to improve the quality of multi-family housing design by balanced information from theorist, user and developer.

  • PDF

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.