• Title/Summary/Keyword: Multi-Criteria Decision Making Analysis

Search Result 114, Processing Time 0.019 seconds

Development of Economic Analysis Indicators and Case Scenario Analysis for Decision-making support for Off-Site Construction Utilization of Apartment Houses (OSC 활용 의사결정 지원을 위한 경제성 분석 지표 개발 및 사례 시나리오 분석 - 공동주택 PC공법을 중심으로 -)

  • Yun, Won-Gun;Bae, Byung-Yun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.24-35
    • /
    • 2023
  • Recently, the Ministry of Land, Infrastructure and Transport presented the '6th Construction Technology Promotion Basic Plan' and 'Smart Construction Revitalization Plan (2022.7.20)'. Off-Site Construction (OSC), which involves construction and production of PC (Precast Concrete) and Modular, etc., has advantages in shortening the construction period, reducing costs, improving quality, reducing construction waste, and reducing safety accidents. However, the construction cost is high compared to the traditional RC construction method, which has hindered its utilization and spread. In this study, OSC utilization was improved. An economic analysis indicator and methodology that can support decision-making in the planning and design stages for multi-unit housing were proposed. The factors used in the economic analysis of OSC (based on the PC method) of apartment houses were reviewed. As for the indicators used in the cost and benefit section, 'Construction Period', 'Disaster Occurrence', 'Waste Generation', and 'Greenhouse gas Emission', which reflect the technical advantages of OSC, were derived. In addition, a scenario analysis was conducted based on actual apartment housing case data for the presented economic analysis indicators and benefit calculation standards. The level of benefit that offsets the difference between the existing RC construction method and the construction cost was reviewed. In future studies, it will be necessary to conduct additional case studies to apply the measurement criteria for detailed indicators and supplement the benefit indicators.

A study on Operation factors the Used automobile logistics complex using Fuzzy-AHP (Fuzzy-AHP를 활용한 인천항 중고자동차 물류단지 운영 성공요인에 대한 연구)

  • Kim, Byung-Hwa;Cha, Young-Doo;Ma, Hye-Min;Yeo, Gi-Tae
    • Journal of Digital Convergence
    • /
    • v.15 no.7
    • /
    • pp.97-109
    • /
    • 2017
  • Domestic vehicle penetration rate is growing at 3% per year, but consumers are increasingly buying used cars due to steady price hikes Nevertheless, the used car export market is expected to decline due to import regulations of major countries and the low grade environment of Used car export complex. Therefore, this study using Fuzzy-AHP was aimed to find operational factors of Used car logistics complex and establish a practical management plan of Used car logistic complex in incheon port. Fuzzy-AHP is the method that can be calculated weight of multi-level criteria and change linguistic ambiguity of human to Fuzzy Number. So it's able to propose the realistic decision making alternatives. As a result of the literacture reviews, present study focused on the analysis of the present situation of the logistics of the used car and the activation of the complex, suggested the activation plan and activation of the logistics complex. In the analysis of operational factors, logistic complex cost factors were found to be the most important factors by recording the weighted value of 0.306 in the above factors. The detailed factors were as follows: rent, accessibility, and logistics site size. It is necessary to compute competitive rent for the highly-advanced used car logistics complex, and to realize the rental support policy and to consider designating the free trade zone. In addition, it is necessary to expand the access infrastructure and secure the scale of the company for overseas buyers, and it is necessary to improve the overall government laws and introduce IT system for the future.

Development of an Technique for Assessing Priority of Alternatives in Railroad Projects Considering Civil Petitions (민원을 고려한 철도대안 우선순위 판단기법 개발)

  • Chung, Sung-Bong;Song, Ki-Han;Hong, Sang-Yeon;Kim, Dong-Jun;Kim, Dong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.7 s.85
    • /
    • pp.87-98
    • /
    • 2005
  • Through rail transit has many merits as a safe, environmental harmonic and scheduled transit, there are many problems to construct railroads because of the public resentment. However, there is no reasonable way to settle the conflict properly and it causes enormous social and economic losses. This paper suggests a methodology to evaluate public complaint using the AHP technique, which is generally used as the methodology to evaluate public complaint using the AHP technique, which is generally used as the Multi-Criteria Decision Making (MCDM). However, the result from the AHP has some defects to control conflicts because the interests related to railroad projects are so complex that it is hard to make people persuaded easily. Therefore, this paper suggests 'the improvement ranking method', 'the sensitive analysis', and 'the assessment of independence relationship' which can aid the basic AHP to be robust. And the AHP. modified by fuzzy method, is also suggested to apply this methodology to example rail paths in Korea.

A Study on Improvement of throughput-linked Port Development (Trigger Rule) System (물동량 연동 항만개발제도 개선방안 연구)

  • LEE, Su-Young;LEE, Na-Young
    • Journal of Korea Port Economic Association
    • /
    • v.39 no.3
    • /
    • pp.179-189
    • /
    • 2023
  • Korea's port development adjusts the completion time and size of port facilities according to the future port throughput. The current port development system, which is referred to as "throughput-linked port development (Trigger Rule)", has received positive evaluation for efficiently executing the limited port development budget. Recently concerns have been growing over deteriorating service levels in port facilities in Korea due to accelerated aging of terminal facilities. However, the current port development system does not possess any standard for assessing the level of service and utilizing development indicators. The purpose of this paper is to calculate the Port Service Index (PSI) by selecting indicators to measure the Level of Service (LOS) of ports and deriving weights between the indicators, so that the current "throughput-linked port development (Trigger Rule)" can be linked with the level of service. Based on the result of analysis on a variety of preceding studies, the ship waiting rate, berth productivity, ship turnaround time and ship productivity were selected as four indicators to constitute the Port Service Index. The AHP and entropy methodologies were used to derive weights for each of four indicators which were later combined to calculate the comprehensive weight. The calculation formula of the Port Service Index (PSI) was derived by using the aggregated weights of each indicator, based on which the LOS of domestic container and bulk terminals were evaluated and this measurement result was divided into 6 classes to define each LOS. This paper contributes to draw the improvement measures for port development system that are able to connect the quantitative indicator of throughput, as well as a qualitative indicator of the level of "service".