• Title/Summary/Keyword: Multi Project

Search Result 766, Processing Time 0.026 seconds

R&D Project Portfolio Selection Problem (R&D Project Portfolio 선정 문제)

  • Ahn, Tae-Ho;Kim, Myung-Gwan
    • Korean Management Science Review
    • /
    • v.25 no.1
    • /
    • pp.1-9
    • /
    • 2008
  • This paper investigates the R&D project portfolio selection problem. Despite its importance and impact on real world projects, there exist few practical techniques that help construct an non-dominated portfolio for a decision makers satisfaction. One of the difficulties constructing the portfolio is that such project portfolio problem is, in nature, a multi-attribute decision-making problem, which is an NP-hard class problem. This paper investigates the R&D project portfolio selection problem. Despite its importance and impact on real world projects, there exist few practical techniques that help construct an non-dominated portfolio for a decision makers satisfaction. One of the difficulties constructing the portfolio is that such project portfolio problem is, in nature, a multi-attribute decision-making problem, which is an NP-hard class problem. In order to obtain the non-dominated portfolio that a decision maker or a user is satisfied with, we devise a user-interface algorithm, in that the user provides the maximum/minimum input values for each project attribute. Then the system searches the non-dominated portfolio that satisfies all the given constraints if such a portfolio exists. The process that the user adjusts the maximum/minimum values on the basis of the portfolio found continues repeatedly until the user is optimally satisfied with. We illustrate the algorithm proposed, and the computational results show the efficacy of our procedure.

A R&D Project Evaluation Model Based on Multi-attribute Utility (다 속성 효용이론을 이용한 R&D 프로젝트의 평가 모델의 연구)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.103-106
    • /
    • 1998
  • 본 연구는 연구·개발 프로젝트의 평가를 위하여 연구·개발 프로젝트의 다-속성(Multi-attributes)을 고려하한 평가 모델의 연구이다. 이를 위하여 우선 평가구조를 구축하고 각 속성별 평가를 종합하기 위한 종합성과도(Total Preference Index)로 단일 측정치로 평가 할 수 있도록 종합하기 위한 적절한 효용함수를 도입하여 사용하였다. 이러한 평가 과정을 다-속성 의사결정 모델(Multi-attribute Utility Model)로 통합하였으며 연구·개발프로젝트의 특성을 고려하여 각 연구실의 책임자(Laboratory Directors)의 평가체계를 개발하여 본 평가모델에 포함하였다. 본 평가모델의 시험 적용을 위하여 특정 연구소에 시험적용하고 그 결과를 보였으며, 부분적으로 보완 연구될 경우 일반적인 프로젝트의 평가모델로 활용될 수 있으리라 생각된다.

  • PDF

Study on Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process (시스템엔지니어링에 기반한 원자력 사업대상국가 평가방법 연구)

  • Choi, Sun Woo;Bui, Hoang Ha;Roh, Myung Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.1-6
    • /
    • 2013
  • Developing Build-Own (or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of target countries. In order to analyze the feasibility of project country, the Analytic Hierarchy Process is adopted. Firstly, the factors influencing the success of BOT nuclear power project in overseas countries were investigated through the literature survey for the country risk and were evaluated by expert interview for estimating comparative weight through pairwise comparison between such factors. Finally, it is developed comparative database of alternate countries with respect to each factor. This analytic method enables the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the target country.

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

Byker Redevelopment : Ralph Earskine' Design Concept and Residence′ Participation on the Design Process (바이커 재개발 : R. Earskine의 설계개념과 주민참여)

  • 손승광
    • Journal of the Korean housing association
    • /
    • v.14 no.6
    • /
    • pp.173-184
    • /
    • 2003
  • To be a good architecture, resident' needs should be defined as possible as definitely. A Multi-family housing is not easy to define of resident' needs, because the user is ambiguous and the needs is multi aspects. Byker housing project have a good approach to define ambiguous and many aspects of residence' need. In this view points, Byker redvelopment project show the process of resident' participation as a new customers, and design process architect with people, in spite of the early 1970s' project in terms of the user participations. This approach of residence participation is a good lesson how to communicate with recidence, how to identify the need, and its design is satisfied in the residence. And its project are discussed with residence how to manage of rehabilitation.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

A MULTI-OBJECTIVE OPTIMIZATION FOR CAPITAL STRUCTURE IN PRIVATELY-FINANCED INFRASTRUCTURE PROJECTS

  • S.M. Yun;S.H. Han;H. Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.509-519
    • /
    • 2007
  • Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.

  • PDF

ECONOMIC ANALYSIS BY GLASS TYPES IN BALCONY CONVERSION OF MULTI-FAMILY HOUSING PROJECTS

  • H.G. Kim;D.I. Kim;D.W. Ko;T.H. Hong;C.T. Hyun;K.J. Koo
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.625-634
    • /
    • 2007
  • Energy-saving is one of important issues in multi-family housing projects in South Korea. According to the study by Yu et al. (2002), the balcony conversion causes energy loss approximately one and a half times. Therefore, it is important to select the economical glass type in the balcony window. In order to identify the most economical glass type of balcony conversion in multi-family housing projects, the most typical type of the multifamily housing projects in the metropolitan area was selected as a candidate project. The selected candidate project has been simulated using ENERGY-10 program to estimate the heat load by the different five types of glasses as well as their life cycle cost analysis (LCCA) using present worth method. Finally, sensitivity analysis has been conducted to determine the most economical glass types under a different discount rate (interest rate) and service life of building.

  • PDF

A Qualitative Approach to eIT Project Management (e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발)

  • Jeong, Gi-Ho
    • Journal of Information Technology Services
    • /
    • v.1 no.1
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

Analysis of Image Quality and Optimized Reconstruction Window through Heart Rate and Its Variation in Retrospectively ECG-gated Coronary Angiography Using Multi-Detector Row CT

  • Lee, Sang-Ho;Park, Byoung-Wook;Kim, Hee-Joung;Haijo Jung;Kang, Won-suk;Son, Hye-Kyung;Choe, Kyu-Ok
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.461-463
    • /
    • 2002
  • Image quality and selection of optimized window for good quality reconstruction in coronary angiography using multi-detector row CT (MDCT) have not been studied by heart rate and its variation. Therefore, the effect of heart rate and its variation was systemically analyzed. Eighty-three patients were undergone contrast-enhanced coronary angiography using MDCT. In this study, sixty cases were enrolled. Two radiologists graded image quality as follows: 4, excellent; 3, good; 2, fair; l, bad. The starting points of the reconstruction window were chosen at seventy and forty percent of R wave interval. Optimized window was scored as 1 when 40% reconstruction was better quality than 70%, as 2 when 40% reconstruction is same as 70%, and as 3 when 70% reconstruction was better than 40%. Regression analysis was performed. The range of variation of beats per minute (BPM) was well correlated with image quality (r=-0.55, p=0.000), however correlation with optimized window percentage was not statistically significant (p=0.969). By contraries, median value of BPM was comparatively well correlated with optimized window grade (r=-0.24, p=0.086). Median value of BPM was not well correlated with image quality (r=0.l70, p=0.l97). Image quality is more affected by variation of heart rate (VHR) than by higher heart rate. Selection of optimized reconstruction window for good image quality is mainly affected by heart rate and there is a tendency that systolic phase reconstruction is better in image quality than diastolic reconstruction in higher heart rate.

  • PDF