A primary factor affecting on the design of soft ground is to determine the soil properties (Compression index, Coefficient of consolidation) and the depth of soft ground. It could be the basic sources to estimate settlement behavior of soft ground. Even though the reliable soil examination equipment was used to examine soil to determine the depth of soft ground, it's very hard to find out the accurate properties of soft ground, because the condition of indoor experiment cannot reproduce the circumstances of ground perfectly. Therefore, this study was re-estimated to find out the most reliable soil properties by using back-analysis with field monitoring data of "Site preparation for Airplane Mooring of Incheon International Airport Phase II Development" for 317days.
The Korean government has introduced and enforced maritime traffic safety assessment to secure traffic safety since 2010. The maritime traffic safety assessment is needed by law to design a new port or modify an existing one. According to Korea Maritime Safety Act, in the assessment the propriety of marine traffic system consists of the safety of channel transit and berthing/unberthing maneuver, safety of mooring, and safety of marine traffic flow. The safety of channel transit and berthing/unberthing maneuver can be evaluated only by ship-handling simulation. The ship-handling simulation is carried out by sea pilots working with the port concerned. The vessel's proximity measure is an important factor to evaluate traffic safety. The proximity measure is composed of vessel's closest distance to channel boundary and probability of grounding/collision. What is more, the probability of grounding becomes important. According to central limit theorem, a sample has a normal distribution on condition that its size is more than 30. However, more than 30 simulation runs bring about the increase of assessment period and difficulty of employing sea pilots. Therefore this paper is to find out minimum sample size for evaluating vessel's proximity. First sample sets of size of 3, 5, 7, 9 etc. are selected randomly on the basis of normal distribution. And then KS test for goodness of fit and t-test for confidence interval are applied to each sample set. Finally this paper decides the minimum sample size. As a result this paper suggests the minimum sample size of 5, that is, the simulation of more than five times.
Hyundai Heavy Industries has developed a tidal current energy converter utilizing the accumulated technology as the world largest constructor for ship and offshore structures. The model has two sets of turbines in both ends in order to utilize the bi-directional current flows in flood and ebb tide. The torque produced by turbine in tidal current is directly delivered to generator along the horizontal axis, in which the turbine, gear, generator, gear and turbine are connected successively. The manufactured model for field test has the turbine diameter of 5 meters to produce the maximum power of 500kW at maximum current speed of 5m/s. The technical verification of tidal power converter was performed by means of small scale model test in towing tank as well as field test at the Strait of Uldolmok located in Jindo of Jeollanamdo province. Field test was performed by mounting the tidal current converter on the SEP(Self Elevating Platform) which could lower the 4 vertical legs on the seabed and could elevate platform over the water surface using the hydraulic power for itself. The field test performed for a month shows that power output is similar or larger compared with the expected one in design stage. This paper presents the development of tidal current energy converter and real sea field test by Hyundai Heavy Industries. This project has finished successfully and provided the technical advance toward commercial services for tidal current power generation in the south-west region in Korea.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.1
/
pp.357-362
/
2006
The wedge type rail clamp compresses with small clamping force at first, and with large clamping force when the wind speed increases because of the wedge working. At this time in order to display the wedge working, the rail clamp slips along a rail. If the supporter is not installed in the rail clamp when the wind speed increases more and more, the structure will occur overload which leads the structure to fracture. So the supporter has to be installed in the rail clamp. The proper position of this supporter is determined by the initial clamping force and the wege angle. Therefore in this study we adopted 5-kinds of wedge angle as the design parameters, and carried out the finite element analysis, in order to analyze the relationship between the initial clamping force and the proper position of supporter in the wedge type rail clamp.
The wedge type rail clamp compresses with small clamping force at first, and with large clamping force when the wind speed increases bemuse of the wedge working. At this time in order to display the wedge working, the rail clamp slips along a rail. If the supporter is not installed in the rail clamp when the wind speed increases more and more, the structure will occur overload which leads the structure to fracture. So the supporter has to be installed in the rail clamp. The proper position of this supporter is determined by the initial clamping force and the wege angle. Therefore in this study we adopted 5-kinds of wedge angle as the design parameters, and carried out the finite element analysis, in order to analyze the relationship between the initial clamping force and the position of supporter in the wedge type rail clamp.
Kwon, Yong-Ju;Nam, Bo Woo;Kim, Namwoo;Jung, Dong-Ho;Hong, Sa Young;Kim, Hyeon-Ju
Journal of Ocean Engineering and Technology
/
v.31
no.2
/
pp.81-90
/
2017
The 1MW OTEC (Ocean Thermal Energy Conversion) platform was designed for application in equatorial seas. In this study, the OTEC platform was investigated using numerical and experimental methods. An octagon-shaped OTEC platform was investigated using the Ocean Engineering Basin of KRISO. These experiments included various tests of regular waves, irregular waves and irregular waves with current (wave+current). The responses of the platform in regular waves showed good agreement between the numerical and experimental results, including the motion RAO, wave run up, and mean drift force. The peak period of heave and pitch motions were observed around 0.5 rad/s, and the effect of the total reflection was found under short wave conditions. The standard deviation (STD) of the platform motion was checked in irregular waves of equatorial and Hawaiian seas. The STD of the pitch was less than $4^{\circ}$ different from the operability requirement under equatorial conditions and the surge STD of the wave frequency showed good agreement between the numerical and experimental results. The STD values of the surge and pitch were increased 66.6% and 92.8% by the current effects in irregular waves, but the pitch STD was less than $4^{\circ}$ under equatorial conditions. This study showed that the STD of the surge was affected by spring effects. Thus, the watch circle of the platform and tension of the mooring lines must be evaluated for a specific design in the future.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.4B
/
pp.413-420
/
2006
The construction of a submerged breakwater has become increasing due to their multiple effects on the coastal zone. Recently, marker rocks have been installed on the submerged breakwater to indicate its position to the vessels instead of buoy systems, since a buoy is not only improper for the ocean view, but also its mooring system may be damaged by the impulsive wave force caused by wave breaking on the breakwater. The accurate estimation of wave forces on such rocks is deemed necessary for their stability design. In this study, the characteristics of irregular wave forces acting on a marker rock, which was installed on a submerged breakwater, was investigated on the basis of laboratory experiments. It was revealed that the dimensionless highest one-third wave force tends to decrease with increasing the installation distance of a marker rock from the leading crown edge of a submerged breakwater. Also, the drag and inertia coefficients for irregular wave forces, which were obtained using the Morison equation, were investigated in relation to K.C. number.
Targeting a floating wave and offshore wind hybrid power generation system (FWWHybrid) designed in the Republic of Korea, this study examines the impact of the interaction, with multiple wave energy converters (WECs) placed on the platform, on platform motion. To investigate how the motion of WECs affects the behavior of the FWWHybrid platform, it was numerically compared with a scenario involving a 'single-body' system, where multiple WECs are constrained to the platform. In the case of FWWHybrid, because the platform and multiple WECs move in response to waves simultaneously as a 'multi-body' system, hydrodynamic interactions between these entities come into play. Additionally, the power take-off (PTO) mechanism between the platform and individual WECs is introduced for power production. First, the hydrostatic/dynamic coefficients required for numerical analysis were calculated in the frequency domain and then used in the time domain analysis. These simulations are performed using the extended HARP/CHARM3D code developed from previous studies. By conducting regular wave simulations, the response amplitude operator (RAO) for the platform of both single-body and multi-body scenarios was derived and subsequently compared. Next, to ascertain the difference in response in the real sea environment, this study also includes an analysis of irregular waves. As the floating body maintains its position through connection to a catenary mooring line, the impact of the slowly varying wave drift load cannot be disregarded. To assess the influence of the 2nd-order wave exciting load, irregular wave simulations were conducted, dividing them into cases where it was not considered and cases where it was included. The analysis of multi-degree-of-freedom behavior confirmed that the action of multiple WECs had a substantial impact on the platform's response.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.3
/
pp.873-883
/
2014
This study proposed an estimation method of allowable wave height for loading and unloading of the ship considering ship motion that is affected by ship sizes, mooring conditions, wave periods and directions. The method was examined validity by comparison with wave field data at pier $8^{th}$ in Pohang new harbor. The wave field data obtained with wave height of 0.10~0.75m and wave period of 7~13s in ship sizes of 800~35,000ton when a downtimes have occurred. On the other hand, the results of allowable wave height for loading and unloading of the ship in this method have obtained with wave heights of 0.19~0.50m and wave periods of 8~12s for ship sizes of 5,000, 10,000 and 30,000ton. Thus this method well reproduced the field data respond to various a ship sizes and wave periods. And the results of this method tended to decrease in 16~62% when have considered long wave, and it is decreased in 0~46% when didn't consider long wave than design standards in case of the ship sizes of 5,000~30,000ton, wave period of 12s and wave angle of $75^{\circ}C$. The allowable wave heights for loading and unloading of the ship proposed by design standards are didn't respond to various the ship sizes and wave periods, and we have found that the design standards has overestimated on smaller than 10,000ton.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.27
no.1
/
pp.14-24
/
2015
This study proposed an estimation method of allowable wave height for loading and unloading of the ship and evaluation of effective working days considering moored ship motion that is affected by sip sizes, mooring conditions, wave periods and directions. The method was examined validity by comparison with wave field data at pier $8^{th}$ in Pohang New Harbor. The wave field data obtained with wave height of 0.10~0.75 m and wave period of 7~13 s in ship sizes of 800~35,000 ton when a downtimes have occurred. On the other hand, the results of allowable wave height for loading and unloading of the ship in this method have obtained with wave heights of 0.19~0.50 m and wave periods of 8~12 s for ship sizes of 5,000, 10,000 and 30,000 ton. Thus this method well reproduced the field data respond to various a ship sizes and wave periods. And the results of this in Korea are didn't respond to various the ship sizes and wave periods, and we h method tended to decrease in 16~62 percent when have considered long wave, and it is decreased in 0~46 percent when didn't consider long wave than design standards in case of the ship sizes of 5,000~30,000 ton, wave period of 12 s and wave angle of $75^{\circ}$. The allowable wave heights for loading and unloading of the ship proposed by design standards in Korea have found that overestimated on smaller than 10,000 ton. On the other hand, the rate of effective working days considering ship motion at pier $8^{th}$ in Pohang New Harbor reduced in 6.5 percent when compare with the results without considering ship motion.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.