• Title/Summary/Keyword: Module Equipment

Search Result 518, Processing Time 0.033 seconds

Development of a Prototype Monitoring Module for Steel Bridge Repainting Robots (강교량 재도장 로봇의 모니터링 모듈 시제품 개발)

  • Seo, Myoung Kook;Lee, Ho Yeon;Park, Il Hwan;Chang, Byoung Ha
    • Journal of Drive and Control
    • /
    • v.17 no.4
    • /
    • pp.15-22
    • /
    • 2020
  • With the need for efficient maintenance technology to reduce maintenance costs for steel bridges, repainting robots are being developed to automate the work in narrow and poor bridge spaces. The repainting robot is equipped with a blasting module to remove paint layers and contaminants. This study developed a prototype monitoring module to be mounted on the repainting robot. The monitoring module analyzes the condition of the painting surface through a camera installed in the front, guides the direction of movement of the robot, and provides the operator with a video to check the working status after blasting through a camera installed in the back. Various image visibility enhancement technologies were applied to the monitoring module to overcome worksite challenges where incomplete lighting and dust occurs.

Development of the High-Reliability PLC-CAN Communication Module for Construction Equipment (건설 중장비용 고신뢰성 PLC-CAN 통신 모듈 개발)

  • Ku, Ja-Yl;Jang, Se-Bong
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.10
    • /
    • pp.228-234
    • /
    • 2014
  • In the case of construction equipment, internal wiring has a very complicated structure such as an electrical wiring and hydraulic equipments. Because of these complex wiring, a lot of time is spent on maintenance and equipment manufacturing. In this paper, we design and implementation of the high-reliability PLC(Power Line Communication) -CAN(Controller Area Network) communication module to reduce electrical wiring of the construction equipment.

Economic Alternative for Volumetric Module Lifting/Offloading (볼류메트릭 모듈 양중 및 인양 대안에 관한 연구)

  • Song, Seung-Ho;Kwon, Woo-Bin;Choi, Jin-Ouk;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.75-76
    • /
    • 2023
  • The construction industry's lack of experience and expertise makes it difficult for projects to realize the full benefits of implementing modular construction. Such project performance-hindering elements are often labeled as modular challenges. The added requirement for the transportation of the finished volumetric module is one aspect of the 'module transportation logistics,' the under-researched modular challenge that can prevent projects from incurring maximum cost and productivity benefits. The typical module transportation phases include lifting, transporting, and offloading. From conducting a literature review, this paper aims to investigate the equipment commonly adopted to lift and offload the module and validate its economic efficiency by comparing it with the alternative lifting/offloading equipment used in the two case projects. The results showed that hydraulic jacks are an economic alternative to the crane for lifting/offloading the module. The increase in single-module projects with smaller budgets made crane usage economically undesirable, and this study suggested a viable option for a more economical alternative.

  • PDF

Colored-LCD Type Train Destination Indicator System for Visibility Improvement (승객서비스 향상을 위한 새로운 열차행선안내장치의 개발)

  • Hwang Jong-Gyu;Lee Jae-Ho;Yoon Yong-Ki;Shin Duc-Ko;Jo Hyun-Jeong
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.504-509
    • /
    • 2006
  • Currently, most of TDIS(Train Destination Indicator System) is operated colored-LED type equipment in Korea. This current LED type TDIS equipment has not graceful display and causes passenger's fatigues because of the LED module inherent characteristics as a display light source, high power consumption, high operating and maintenance costs, and et al. To address these several, we are developed new colored-LCD type TDIS equipment. According to our developed new TDIS equipment, we can achieve high resolution and graceful color stone of information display. Thus high graded service are able to provide to passengers. In addition, LCD module decreases power consumption, and it can be used permanently by changing only backlight in comparison with conventional equipment. Therefore we can decrease the maintenance cost and extend durability-period of TDIS equipment using new equipment.

Study on the Optical Analysis Equipment Control System for Electronic Parts Inspection (전자 부품 검사용 광학분석 장비 제어시스템에 대한 연구)

  • Lee, Jun Ha
    • Journal of the Semiconductor & Display Technology
    • /
    • v.14 no.4
    • /
    • pp.67-71
    • /
    • 2015
  • Product of technology developed in this study is an external interface for controlling the equipment of pendant key remote control system circuit board, and it is used in the electronic component test equipment system. Main control system module is in the role as a device for controlling the various control devices that make up the integrated system for microscopic examination at the request of the host computer engineers to control the inspection equipment. The pentane-key interface module to its role as a device for controlling the various control devices that make up the integrated system for microscopic examination at the request of the host computer for the engineer to control the inspection equipment. Development of the control system can be expected in the configuration of a system for efficient and accurate inspection of high-precision parts.

Development of PLC Communication Line Test Simulator (PLC 통신 선로 시험 시뮬레이터 개발)

  • ku, Jayl
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.54 no.4
    • /
    • pp.122-128
    • /
    • 2017
  • In order to simplify the wiring of construction heavy equipment, researches on PLC(Power Line Communication)-CAN(Controller Area Network) communication module are actively proceeding. Even if a PLC-CAN communication module is developed, a simulator capable of judging whether the PLC-CAN communication module is operating normally is needed. In this paper, we designed and developed a simulator that can measure the status of PLC-CAN communication module. We analyzed the characteristics of the power line communication frequency band by analyzing the characteristics of the power line and compared the noise characteristics with the passenger car in order to characterize the heavy equipment noise.

Layout Optimization of FPSO Topside High Pressure Equipment Considering Fire Accidents with Wind Direction (풍향에 따른 화재영향을 고려한 FPSO 상부구조물 고압가스 모듈내부의 장비 최적배치 연구)

  • Bae, Jeong-Hoon;Jeong, Yeon-Uk;Shin, Sung-Chul;Kim, Soo-Young
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.5
    • /
    • pp.404-410
    • /
    • 2014
  • The purpose of this study was to find the optimal arrangement of FPSO equipment in a module while considering the economic value and fire risk. We estimated the economic value using the pipe connections and pump installation cost in an HP (high pressure) gas compression module. The equipment risks were also analyzed using fire scenarios based on historical data. To consider the wind effect during a fire accident, fuzzy modeling was applied to improve the accuracy of the analysis. The objective functions consisted of the economic value and fire risk, and the constraints were the equipment maintenance and weight balance of the module. We generated a Pareto-optimal front group using a multi-objective GA (genetic algorithm) and suggested an equipment arrangement method that included the opinions of the designer.

Simulation analysis of Transporting Fixation Equipment on Unit Module (유닛모듈 운반을 위한 고정장치의 시뮬레이션 분석)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon;Chae, Myung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.143-144
    • /
    • 2013
  • Unit module system produce units in the factory and assemble in the field. This unit module system has advantages of shortening the process of construction. However, it is still in the early research related to setting the unit module which is transported by truck to the field. Therefore, when transporting the unit module, this goal of study develops fixed devices. And suggesting device were performed that simulations analyzed maximum stress and assessed the safety.

  • PDF

The Performance Analysis to Identify the Reuse and Assembly Impact of Temporary Equipment

  • Bae, Sung-Jae;Park, Jun-Beom;Kim, Jung-Yeol;Kim, Young-Suk;Kim, Jun-Sang;Jo, Jae-Hun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1252-1252
    • /
    • 2022
  • Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.

  • PDF