• Title/Summary/Keyword: Modular coordination

Search Result 35, Processing Time 0.019 seconds

A Study on the Manual for Emergency Medical Facility Constructing at Disaster Site (재난현장 응급의료시설 구축을 위한 매뉴얼에 관한 연구)

  • Yoon, Yousang;Suh, Sangwook;Lee, Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.38-46
    • /
    • 2017
  • Recently, various types of disasters have been occurring all over the world, and the importance of disaster management system to minimize damage caused by disasters is emerging. In Korea, we have made many policy improvements related to disaster safety, such as the establishment of the National Security Service and the announcement of the National Safety Management Plan and made a lot of effort to secure facilities such as disaster relief hospitals after the Mauna Ocean Resort Gymnasium Collapse and the Sewol-ho incident, However, compared to advanced countries such as the US, Europe, and Japan, there is a shortage of emergency medical center per population, and disaster management systems have not been implemented efficiently due to lack of coordination among various agencies. The purpose of this study is to propose the efficient construction and systematic management of emergency medical facilities required for disaster situations. For this purpose, it is necessary to identify the current status of domestic emergency medical facilities compared to developed countries.

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.230-235
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

  • PDF

Discovering Applicable Lessons for '3D Printing R/D Project' Implementation Through Studying the Process of Adopting Overseas Industrialized Building Production Technological Knowhow in the Korean Context (한국의 공업화건축 공법 도입활용과정 분석을 통한 3D 프린팅기술 개발 방향성 연구)

  • Lee, Sung-Min;Lee, Pil-Won;Cho, Hoo-Young;Lee, Jae-Heon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.17 no.4
    • /
    • pp.59-68
    • /
    • 2017
  • This paper aims at finding some lessons applicable to successful implementation of 'The 3D Printing R/D Project' through both examining the process of adopting overseas industrialized housing production technological knowhow by home builders during the 1970's~1980's period and thereafter until now the various efforts to adjust the technologies efficiently to the Korea's unique situation. Some meaningful lessons can be summarized as follows; I) Deep understanding of 3DP technological know-why along with its inheritance, II) Readjusting of R/D period and goals(cf. Global leader Winsun's 15 years experiment), III) Restructuring for more collaborative R/D B&E system among participating researchers IV) Fostering 3DP expert-engineers and technicians from the early stage, V) Clearing legal barriers in users' adopting 3DP methods necessary, VI) Development of appropriate building material besides concrete. Therefore, it is highly recommended that the above-mentioned 6 lessons positively accepted and applied to the Research Implementation Plan in due course, especially by KICT consortium and KAIA under the guidance of Ministry of Land, Infrastructure and Transport.

A Study on the Invigoration of BIM Design of Public Institutions : Focused on the Case of LH (공공기관의 BIM 설계 활성화 방안 연구: LH 사례를 중심으로)

  • Yang, Dong-Suk;Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.291-297
    • /
    • 2016
  • Recently, foreign construction companies through the BIM-design have the effect of improving productivity and quality construction. On the other hand, domestic BIM-design is a little depressed because of lack of additional costs and professional personnel problem. The construction industry of recession, as reasons of construction market is downsizing. First must, enabling the design in public institutions, mainly BIM.. Design for BIM the construction sector, as well as an early stage actively introducing and spreading of the performance of him and domestic BIM technology should be able to promote the development. Public institutions in accordance with this study presented measures that can stimulate the BIM design on LH. To that end, the public agency's design were analyzed, and suggested the Improvement and Application of the four aspects for Modular Coordination BIM Design. Also, gradually formulate a "road map for public institutions applied design bim" in order to carry out the plans put forward and presented the expected effect of him. The proposed work was public institutions will be used as a pilot project in Korea Land Housing Corporation.

The Stones of Seokguram Speak: Floor Plan and Wall Design of Seokbulsa Grotto (석굴암의 돌은 말한다: 석불사 석굴의 건축 평면과 벽면 설계)

  • Yoon, Chae-Shin
    • Journal of architectural history
    • /
    • v.29 no.1
    • /
    • pp.21-37
    • /
    • 2020
  • The purpose of this paper is to reconstruct the original floor plan and wall design of Seokbulsa Grotto in Kyungju; commonly known as 'Seokguram'. The paper presents an array of dimensional studies of the existing Seokguram to examine its architectural form, and infers the original floor plan and wall design of Seokbulsa Grotto. Seokbulsa Grotto is designed as a system of 'coherent modules' and was constructed using the dry stone method, which interlocks large stone modules into a whole that becomes the load-bearing structure itself. The design principles governing Seokbulsa Grotto are the spatial axis of symmetry, modular coordination, and the layout grid of a quarter Tang-Ruler(TR: 唐尺). Dimensional studies were conducted with these governing principles in mind and concludes the following about the original floor plan design. In the main chamber, Ansang-stone's radius is 12 TR, and Flagstone's radius is 12¼ TR. In the front chamber, the width between the two Ansang-stones facing each other is 22 TR and the longitudinal space depth is 12 TR, while the width between the two Flagstones facing each other is 22½ TR and Flagstone's depth is 12 TR. In the passageway, the width between the two Ansang-stones facing each other is 11½ TR and longitudinal space depth is 9 TR, while the width between the two Flagstones facing each other is 12 TR and Flagstone's depth is 7¾ TR. The distance from the center to the entrance line of the main chamber is 10½ TR. Therefore, the total longitudinal length of the Grotto is 43½ TR at the level of the Ansang-stones, and 44 TR at the level of the Flagstones.