Relations of Complexity, Risk Perception and Opportunism on Overseas Mega-Project: Modulating Effect of Contractual Governance (해외 대형 프로젝트의 복잡성, 위험인지 및 기회주의의 관계: 계약적 지배구조의 조절효과)

  • Teck-Kyu Kim;Hun-Joo Jung
    • Korea Trade Review
    • /
    • v.45 no.5
    • /
    • pp.91-116
    • /
    • 2020
  • The construction industry can be described as one of the most volatile industry depending on the situation. As such, a contractor, who is usually positioned to take all kinds of risk, may frequently require to form a strategic partnership for better execution of a project. In this study, we are going to review act or behavior that may happen among such partnership. For such review, a survey targeted at domestic construction companies has been conducted on their thoughts as regards opportunism, risk perception, and the contractual governance between partners. The analysis result of structural equation and regression has indicated that there exists a positive effect on the opportunistic behavior from the risk perception, a moderating effect on contractual governance between the performance risk and opportunism, whereas no such moderating effect on the same between relational risk and the opportunism. The output of this study may assist various domestic individuals who wish to participate large scaled overseas projects.

A Study on the Improvement Direction of RFID Using Satisfaction-Importance Matrix in Construction Fields (만족도-중요도 매트릭스를 이용한 건설현장에서의 RFID 개선 방향에 관한 연구)

  • Jang, Se-Woong;Yu, Hoe-Chan;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.47-54
    • /
    • 2009
  • Integrated construction site management using RFID(Radio Frequency Identification) and facility maintenance introducing USN (Ubiquitous Sensor Network) have been widely used in the mega construction project sites. But, the validation on performance of RFID systems after introducing those has not been carried out. Given that the use of RFID systems have been increased, the construction industry as well as other industries needs the evaluation of the RFID system. By regarding the necessities for evaluation, a research to the satisfaction and importance evaluation of RFID system from the end-users' view point for site management was conducted. Satisfaction-importance matrix of satisfaction standards and importance standards was created (organised) according to the analysis result of a survey, proposed improvement methods and analysis about the items presented by each region like areas of sustainable maintenance, maintenance, progressive improvement and priority improvement. The result would contribute to enhance the utilization of system and its performance.

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

Development of intranet-based Program Management Information System of multi-complex project with application of BIM (BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안)

  • Song, Il-Bab;Hur, Young-Ran;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 2012
  • Public construction projects need complex and multi-functional management skill, since the most of public construction projects are comprised of multi-project and mega-projects. In order to effectively manage construction projects, PMIS is widely used. However the majority of the current PMIS have been developed as a single project-oriented business management system. Thus compatibility problems are encountered during the process of integrating the entire systems to manage the multi-complex projects. In addition, the form of orders applying BIM are increased recently, but the research and development of BIM based PMIS are still lacking. In this study, therefore, the functions of PMIS main objectives based on the analysis of PMIS As-Is and To-Be of PMIS, the dual management system utilizing Internet and Intranet will be proposed to integrate the individual PMIS with Integrated Program Management System. Rather than combining commercial BIM tool and PMIS directly, which is the common method of failure, the sequential process model to adopt BIM based PMIS is also explained. Step-by-step development method of BIM based PMIS is suggested to prepare for the activation of BIM technology in the nearest future.

Suggestion of the Prediction Model for Material Properties and Creep of 60~80MPa Grade High Strength Concrete (설계기준강도 60~80MPa급 고강도콘크리트의 재료 특성 및 크리프 예측모델식 제안)

  • Moon, Hyung-Jae;Koo, Kyung-Mo;Kim, Hong-Seop;Seok, Won-Kyun;Lee, Byeong-Goo;Kim, Gyu-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.517-525
    • /
    • 2018
  • The construction of super tall building which structure is RC and must be certainly considered on column shortening estimation and construction reflected concrete creep has been increased. Regarding the Fck 60~80MPa grade high strength concrete applied in the domestic super tall building project, the mechanical properties and creep deflection according to curing conditions(Drying creep/Basic creep) were reviewed in this research. Results of compressive strength and elastic modulus under sealed curing condition were 5% higher than unsealed condition and difference of results according to the curing condition was increased over time. Autogenous and drying shrinkage tendency showed adversely in the case of high strength concrete. Additionally, creep modulus under unseal curing condition was evaluated 2~3 times higher than sealed condition. Modified model of ACI-209 based on test result was applied to estimate long period shortening of vertical members(such as Core Wall/Mega Column) exactly, it is designed to modify and suggest the optimal creep model based on various data accumulated during construction, in the future.

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

Development of Gateway Review System for Supporting Collaborative Decision-Making through Project Life Cycle (사업 단계별 의사결정 지원 게이트웨이 리뷰 체계 구축)

  • Shin, Seung-Woo;Yi, June-Seong;Lee, Jee-Hee;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.43-54
    • /
    • 2010
  • As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.