A Experimental Study on the Determination of Construction method of Controled Low-strength Material Accelerated Flow Ability Using Surplus Soil for Underground Power Line (지중송전관로용 급결 유동성 뒤채움재의 시공법 설정에 관한 실험적 연구)
-
- Journal of the Korean Recycled Construction Resources Institute
- /
- v.5 no.3
- /
- pp.84-93
- /
- 2010