With international urgence of terror situation, many methods of terror techniques and skills are appearing and more intense and threatening terror is braking out not only in the air(plane), but also in the sea(ship). Korea is surrounded by 3 sides of sea and is a proud maritime nation that should advance to foreign country through the sea because South Korea and North Korea are confronting. Korea depend on the maritime transportation, 99.7% of exporting, importing material resources. Therefore, acquisition of the marine safety has the great affect on national security and economical life. On the high tension of situation about threat and possibility of maritime terroism, the potential ways of the improvement policy for counter-tactics against big maritime terror are the following. First, we should construct clear and well-organized network for accurate information about maritime terrorism Second, we should have the information of all domestic, foreign passenger's ships Third, national important facilities such as atomic energy plant, thermo-electric power plant, shipyard need policies to manage all emergency situation Fourth, government authorities should improve tactic abilitities by competing with support and budget inside of nation as well as outside of nation. To develop big maritime terror of our country, we will have to hold cooperative training & tactics contest of big maritime terror by cooperating educational industry organization with similar institute, improve the ability of members of big terror and acquire tactics information by excavating and exchanging a new technique through tactics seminar and public hearing.
In this study, we attempt to provide empirical evidence for the effect of the expenditure of the local governments on the air quality management. Based on the statistical data, the concentrations of air pollutants including $PM_{10}$, $O_3$, and $NO_2$ were analyzed in accordance with local characteristics of the local governments' environmental expenditure, demographic characteristics, and economic and human resources between 2008 and 2014. The results showed that government spending is estimated to have insignificant impact on air pollutants concentration. All these results are consistently corroborated from the analysis based on different alternative measure of local governments' expenditure (budget composition and measure of expenditure residuals). Subsequently, this study implies that environmental expenditures of local governments have not been effectively enforced to enhance the air quality of the region in Korea.
Comparing to the gravimetric and volumetric method, the flowmeter calibration based on the master meter method is relatively economical and convenient, especially for high flowrate. The uncertainty of flow quantity and flowrate using the master meter method was evaluated according to the GUM (Guide to the Expression of Uncertainty in Measurement). In order to apply for the wider flow range, two master meters (electromagnetic flow meter) were employed as reference flowmeters. The uncertainty of the master meter was obtained by combining the statistical variation of the repeated measurements and the variation of fluid density and pipe material due to temperature and pressure changes were scrutinized. for a practical application, the uncertainty of calibrator, whose measuring capacity of 1000 ㎥/h obtained by employing two 500 ㎥/h electromagnetic How meters, was evaluated. The uncertainty budget shows the quantitative contribution of each uncertainty component to the overall uncertainty of the calibrator. As a result, it was found that the dominant uncertainties were from the master meter, which was evaluated statistically, and from the process of least squares fitting. On the contrary, the uncertainties arising from the variation of the fluid density and the pipe volume due to the temperature and pressure were negligible.
According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.
동절기 도로 유지관리는 일반적으로 제설활동을 의미하며 제설활동에는 도구를 사용하여 물리적으로 눈을 제거하는 방법과 융설제를 사용하여 화학적으로 눈을 제거하는 방법 이 포함된다. 융설제를 사용하여 화학적으로 눈을 제거 할 때, 융설제를 과도하게 사용하면 환경문제와 예산낭비가 생길 수 있고, 융설제를 적게 사용하면 그 성능을 충분히 낼 수 없으므로 얼마나 사용해야 하는지는 중요한 문제이다. 본 연구에서는 실내 및 현장 실험을 통해 제설제의 성능을 평가하고 이를 바탕으로 도로 제설작업시 적정 융설제 살포량을 제안하였다.
A management planning is an index to accomplish the goal of business enterprise and a managing guide of the top manager. It is a top manager's authority with he gives directions at the beginning of the budget year and has something to do with a responsible accounting. If we correlate this management planning with an area of accounting, we can subdivide it into followings; production and marketing schedule, demand-supply program of raw material, demand-supply program of the personnel and lobor cost program, facility investment program, balance fund program, profit and loss, and financial position program. I think, in the field of accounting for the sake of the management planning, there are motivation accounting, responsible accounting, divisional system accounting, evaluating accounting and so on. A management planning should be accomplishe and as it is accomplished, a business is going to be grown up and developed. Especially, it must be set up on the ground of the long-term strategies. When the accomplishment through the management planning, which is a social responibility that all the business enterprise are seeking after, is attained, it makes the development of business possible and we cannot dent that it is closely connected with the national economic development.
The purpose of this study was to prepare for developing rural house remodeling techniques utilizing the traditional residence factor. The study was carried out through both literature research and on-site research. The traditional residence space factors were identified through literature research and on-site research was carried out through analysis of the rural house remodeling cases. The results of this study was as follows ; 1) Traditional space factors were derived by literature research i. e. space arrangement (topography, direction, plane arrangement), exterior factors; walls, madang, interior factors; roofs, ondol, floors, colours. 2) The traditional residence factor utilizations of remodeling were applied a result through investigation case and analysis. Five rural houses in Namsa village, Danseong-myeon, Sangcheong-gun, Gyeongsangnam-Do were analyzed as remodeling cases including traditional residence factors. There were limitation of budget problems and material selection in the traditional residence factor utilizations of remodeling. The researchers have chosen target rural houses which applied for traditional residence factors to remodel the rural houses, and the most important factor to consider was harmony with rural unique characteristics. The researchers suggested considerations should be placed on development with energy savings and convenience in rural house remodelling.
recently out door stadiums have been built as multi purpose stadium for athletic sports It hold but also various events and huge concerts. in the past, out-door stadium usually was built, but recently the out-door stadium which of the 50 % of roof covered by doom have been built increasingly. as the result, the sound obstacle is becoming very important. but a design of sound has become unplaned except some of the stadium, also rarely been built by sound-absorption material. as the result, the purpose of this study is investigating, analyzing the theory for plan of electric acoustic sound, a drawing of acoustic design and measurement a result value, comparison, evaluating a main sound factor with criteria of the Seoul City design. and reservation time, clearness, sound pressure level suitable for using purpose, so the necessary quantities will be added to financial budget of building acoustic design. and For verification, this contains acoustic analyser measurement and computer simulation and this study will find the solution of helping method.
The purpose of this study is to find what factors are directly related to the delay of public projects, usually going beyond the planned deadline and budget. From a series of System Dynamics simulation works applied to the Cheongju Cremation Project, the research finds that the negative externalities originated from the adjacent location of the LULU(locally unwanted land use) facilities have exerted significant influence on dynamic perceptions of key stakeholders, typically resulting in project delay. As shown repeated experiments, the proposed negotiation-based models would produce relatively higher planning performance level than the typical approaches hinged on the administrative-expediency tactics. Even though the former may require more human and material resources in the very beginning stage, as they have to deal with diverse grievances raised by major stake-holders, most of them would bound for strengthening reinforcing loops within the complex structure. These results also imply that negotiation or consensus-building approaches would enhance mutual agreement among stake-holders, upgrading the overall quality of project management.
This study consists of an analysis of pre-existing ceiling construction systems as well as the development of a replacement unitary, lightweight steel ceiling system and related legal standards. Based on the material conditions and progression of the study, appropriate components were chosen and details were modified by mock-up test. A final study model was evaluated for performance and adaptability based on four parameters (indoor environment, constructability, budget economy, and aesthetics) and compared to the pre-existing ceiling system. As a result of the initial study, a lightweight steel design was created consisting of a reinforced structure with modular bars and entry holes for components. This system was hung directly on the suspension structure. The new design increased lighting and acoustic performance adapted to an indoor environment. Moreover, the speed of construction was increased by approximately 30%, the cost was decreased by approximately 20%, and ceiling aesthetics were improved.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.